Applying data mining technique to disassembly sequence planning: a method to assess effective disassembly time of industrial products
暂无分享,去创建一个
Michele Germani | Claudio Favi | Marco Mandolini | Marco Marconi | M. Germani | M. Mandolini | M. Marconi | C. Favi
[1] Christian Mascle,et al. Algorithmic selection of a disassembly sequence of a component by a wave propagation method , 2003 .
[2] Xiu Fen Zhang,et al. Product cooperative disassembly sequence planning based on branch-and-bound algorithm , 2010 .
[3] Josip Stjepandic,et al. Knowledge-based design for assembly in agile manufacturing by using Data Mining methods , 2017, Adv. Eng. Informatics.
[4] Marco Santochi,et al. Computer Aided Disassembly Planning: State of the Art and Perspectives , 2002 .
[5] Nam Wook Cho,et al. Automatic derivation of transition matrix for end-of-life decision making , 2010 .
[6] Alfred J.D. Lambert,et al. Methods for optimum and near optimum disassembly sequencing , 2008 .
[7] Michele Germani,et al. LeanDfd: A Design for Disassembly Approach to Evaluate the Feasibility of Different End-of-Life Scenarios for Industrial Products , 2012 .
[8] Peihua Gu,et al. Selective Disassembly Planning for the End-of-life Product☆ , 2017 .
[9] Alfred J.D. Lambert,et al. Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling , 2004 .
[10] Kenji Deguchi,et al. Reversibility and disassembly time of part connection , 2003 .
[11] Christian Mascle,et al. A New Model to Select Fasteners in Design for Disassembly , 2016 .
[12] Yuan-Jye Tseng,et al. Integrated assembly and disassembly sequence planning using a GA approach , 2010 .
[13] Tsai C. Kuo,et al. Waste electronics and electrical equipment disassembly and recycling using Petri net analysis , 2010, The 40th International Conference on Computers & Indutrial Engineering.
[14] Duan Guanghong,et al. A Genetic Algorithm for Product Disassembly Sequence Planning , 2006, 2006 IEEE International Conference on Engineering of Intelligent Systems.
[15] Peter Mitrouchev,et al. Selective disassembly sequence generation based on lowest level disassembly graph method , 2015 .
[16] Duan Guanghong,et al. A genetic algorithm for product disassembly sequence planning , 2008 .
[17] Fabio Giudice,et al. Disassembly planning of mechanical systems for service and recovery: a genetic algorithms based approach , 2007, J. Intell. Manuf..
[18] Surendra M. Gupta,et al. Disassembly sequence planning for products with defective parts in product recovery , 1998 .
[19] Dan Braha,et al. Data Mining for Design and Manufacturing , 2001, Massive Computing.
[20] Geoffrey Boothroyd,et al. Product design for manufacture and assembly , 1994, Comput. Aided Des..
[21] Luigi Maria Galantucci,et al. Assembly and Disassembly Planning by using Fuzzy Logic & Genetic Algorithms , 2004, ArXiv.
[22] Michele Germani,et al. Includes Knowledge of Dismantling Centers in the Early Design Phase: A Knowledge-based Design for Disassembly Approach☆ , 2016 .
[23] Lei Du,et al. Research on the selectable disassembly strategy of mechanical parts based on the generalized CAD model , 2008 .
[24] Rahul Rai,et al. Disassembly sequence generation: A Petri net based heuristic approach , 2002 .
[25] Moez Trigui,et al. Optimization of disassembly sequence planning for preventive maintenance , 2017 .
[26] Michele Germani,et al. Promoting and Managing End-of-Life Closed-Loop Scenarios of Products Using a Design for Disassembly Evaluation Tool , 2012, DAC 2012.
[27] M. H. Wang,et al. ECONOMICAL EVALUATION OF DISASSEMBLY OPERATIONS FOR RECYCLING, REMANUFACTURING AND REUSE , 1998 .
[28] Surendra M. Gupta,et al. Disassembly sequence plan generation using a branch-and-bound algorithm , 2001 .
[29] Rahul Rai,et al. A Petri Net based approach to determine the disassembly strategy of a product , 2002 .
[30] Victor R. Prybutok,et al. An improved co-evolutionary algorithm for green manufacturing by integration of recovery option selection and disassembly planning for end-of-life products , 2016 .
[31] Alfred J. D. Lambert,et al. Optimizing disassembly processes subjected to sequence-dependent cost , 2007, Comput. Oper. Res..
[32] Rajit Gadh,et al. A framework for virtual disassembly analysis , 1997, J. Intell. Manuf..
[33] Jae Kwon Bae,et al. Product development with data mining techniques: A case on design of digital camera , 2011, Expert Syst. Appl..
[34] Michele Germani,et al. Time-based disassembly method: how to assess the best disassembly sequence and time of target components in complex products , 2018 .
[35] Surendra M. Gupta,et al. Disassembly sequencing using genetic algorithm , 2006 .
[36] Ajd Fred Lambert,et al. Disassembly sequencing: A survey , 2003 .
[37] N. S. Ong,et al. Automatic Subassembly Detection from a Product Model for Disassembly Sequence Generation , 1999 .
[38] Sami Kara,et al. A selective disassembly methodology for end‐of‐life products , 2005 .
[39] Toshiyuki Matsumoto,et al. Design of a Method for Disassembly Works on Recycle Products , 2009 .
[40] Joshua D. Summers,et al. Assembly Time Modeling through Connective Complexity Metrics , 2010, 2010 International Conference on Manufacturing Automation.
[41] MengChu Zhou,et al. Disassembly modeling, planning, and application , 2002 .
[42] Utpal Roy,et al. Ontology-based disassembly information system for enhancing disassembly planning and design , 2015 .
[43] Jinxiang Dong,et al. A hierarchical approach to disassembly sequence planning for mechanical product , 2006 .
[44] Hwa-Cho Yi,et al. A study on the method of disassembly time evaluation of a product using work factor method , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).