Behavior of wet precast beam column connections under progressive collapse scenario: an experimental study

Progressive collapse denotes a failure of a major portion of a structure that has been initiated by failure of a relatively small part of the structure such as failure of any vertical load carrying element (typically columns). Failure of large part of any structure will results into substantial loss of human lives and natural resources. Therefore, it is important to prevent progressive collapse which is also known as disproportionate collapse. Nowadays, there is an increasing trend toward construction of buildings using precast concrete. In precast concrete construction, all the components of structures are produced in controlled environment and they are being transported to the site. At site such individual components are connected appropriately. Connections are the most critical elements of any precast structure, because in past major collapse of precast structure took place because of connection failure. In this study, behavior of three different 1/3rd scaled wet precast beam column connections under progressive collapse scenario are studied and its performance is compared with monolithic connection. Precast connections are constructed by adopting different connection detailing at the junction by considering reinforced concrete corbel for two specimens and steel billet for one specimen. Performance of specimen is evaluated on the basis of ultimate load carrying capacity, maximum deflection and deflection measured along the span of the beam. From the results, it is observed that load carrying capacity and ductility of precast connections considered in this study are more than that of monolithic connections.

[1]  Fahim Sadek,et al.  Performance of Steel Moment Connections under a Column Removal Scenario. I: Experiments , 2013 .

[2]  Chang-Sik Choi,et al.  Development and testing of precast concrete beam-to-column connections , 2013 .

[3]  Kang Hai Tan,et al.  Experimental and numerical investigation on progressive collapse resistance of reinforced concrete beam column sub-assemblages , 2013 .

[4]  K. P. Jaya,et al.  BEHAVIOUR OF PRECAST BEAM-COLUMN MECHANICAL CONNECTIONS UNDER CYCLIC LOADING , 2012 .

[5]  Carlos Zanuy,et al.  Experimental assessment of connections for precast concrete frames using ultra high performance fibre reinforced concrete , 2013 .

[6]  Youpo Su,et al.  Progressive Collapse Resistance of Axially-Restrained Frame Beams , 2009 .

[7]  Weichen Xue,et al.  SEISMIC TESTS OF PRECAST CONCRETE, MOMENT RESISTING FRAMES AND CONNECTIONS , 2010 .

[8]  E. Zamani Beydokhti,et al.  AN INVESTIGATION OF SEISMIC RESPONSE OF PRECAST CONCRETE BEAM TO COLUMN CONNECTIONS: EXPERIMENTAL STUDY , 2014 .

[9]  K. Jaya,et al.  Experimental Study on Two Simple Mechanical Precast Beam-Column Connections under Reverse Cyclic Loading , 2013 .

[10]  Meng-Hao Tsai,et al.  Investigation of progressive collapse resistance and inelastic response for an earthquake-resistant RC building subjected to column failure , 2008 .

[11]  Renle Ma,et al.  Strengthening of Horizontal Bracing on Progressive Collapse Resistance of Multistory Steel Moment Frame , 2012 .

[12]  Bing Li,et al.  Experimental and Analytical Assessment on RC Interior Beam-Column Subassemblages for Progressive Collapse , 2012 .

[13]  K. Tan,et al.  STRUCTURAL BEHAVIOR OF REINFORCED CONCRETE BEAMCOLUMN SUB-ASSEMBLAGES UNDER A MIDDLE COLUMN REMOVAL SCENARIO , 2013 .

[14]  Shalva Marjanishvili,et al.  Progressive Analysis Procedure for Progressive Collapse , 2004 .

[15]  M. K. Joshi,et al.  CYCLIC BEHAVIOUR OF PRECAST RC CONNECTIONS , 2005 .

[16]  Kim S. Elliott,et al.  Precast Concrete Structures , 2002 .

[17]  Indian Standard DUCTILE DETAILING OF REINFORCED CONCRETE STRUCTURES SUBJECTED TO SEISMIC FORCES -CODE OF PRACTICE , 1993 .

[18]  Kang Hai Tan,et al.  Structural Behavior of RC Beam-Column Subassemblages under a Middle Column Removal Scenario , 2013 .

[19]  Yasser Alashker,et al.  Approximations in Progressive Collapse Modeling , 2011 .

[20]  Fahim Sadek,et al.  Robustness of Precast Concrete Frames: Experimental and Computational Studies , 2014 .

[21]  Reza Ramezani,et al.  A new ductile moment-resisting connection for precast concrete frames in seismic regions: An experimental investigation , 2014 .

[22]  Turan Özturan,et al.  Ductile Connections in Precast Concrete Moment Resisting Frames , 2006 .

[23]  Shalva Marjanishvili,et al.  COMPARISON OF VARIOUS PROCEDURES FOR PROGRESSIVE COLLAPSE ANALYSIS , 2006 .

[24]  Fahim Sadek,et al.  Testing and Analysis of Steel and Concrete Beam-Column Assemblies under a Column Removal Scenario , 2011 .