Incentive-punitive risk function with interval valued intuitionistic fuzzy information for outsourced software project risk assessment

[1]  Chao Ma,et al.  Some Novel Dynamic Fuzzy Sets Models Applied to the Classification of Outsourced Software Project Risk , 2016 .

[2]  K. Atanassov,et al.  Interval-Valued Intuitionistic Fuzzy Sets , 2019, Studies in Fuzziness and Soft Computing.

[3]  Krassimir T. Atanassov,et al.  Intuitionistic fuzzy sets , 1986 .

[4]  B. Boehm Software risk management: principles and practices , 1991, IEEE Software.

[5]  Mark Keil,et al.  Understanding software project risk: a cluster analysis , 2004, Inf. Manag..

[6]  Pei Wang,et al.  Entropy, similarity measure of interval-valued intuitionistic fuzzy sets and their applications , 2011, Inf. Sci..

[7]  Yong Hu,et al.  A Dynamic Interval-Valued Intuitionistic Fuzzy Sets Applied to Pattern Recognition , 2013 .

[8]  Mark Keil,et al.  Software project risks and their effect on outcomes , 2004, CACM.

[9]  Jianfeng Du,et al.  Intelligent Analysis Model for Outsourced Software Project Risk Using Constraint-based Bayesian Network , 2012, J. Softw..

[10]  Dug Hun Hong,et al.  Multicriteria fuzzy decision-making problems based on vague set theory , 2000, Fuzzy Sets Syst..

[11]  Yong Hu,et al.  A Novel Weighted Average Index Method of Interval Valued Intuitionistic Fuzzy Sets and Its Application to Outsourced Software Project Risk Assessment , 2016 .

[12]  Yong Hu,et al.  Software project risk analysis using Bayesian networks with causality constraints , 2013, Decis. Support Syst..

[13]  Gary Klein,et al.  An exploration of the relationship between software development process maturity and project performance , 2004, Inf. Manag..

[14]  Barry W. Boehm,et al.  Software Engineering Economics , 1993, IEEE Transactions on Software Engineering.

[15]  Sarma R. Nidumolu The Effect of Coordination and Uncertainty on Software Project Performance: Residual Performance Risk as an Intervening Variable , 1995, Inf. Syst. Res..

[16]  Zeshui Xu,et al.  Some similarity measures of intuitionistic fuzzy sets and their applications to multiple attribute decision making , 2007, Fuzzy Optim. Decis. Mak..

[17]  Xiangzhou Zhang,et al.  Cost-sensitive and ensemble-based prediction model for outsourced software project risk prediction , 2015, Decis. Support Syst..

[18]  Kalle Lyytinen,et al.  Identifying Software Project Risks: An International Delphi Study , 2001, J. Manag. Inf. Syst..

[19]  J. Z. Chen,et al.  An Unsupervised Model on Outsourcing Software Projects Risks Based on T-S Fuzzy Neural Network , 2015 .

[20]  Jianfeng Du,et al.  An integrative framework for intelligent software project risk planning , 2013, Decis. Support Syst..

[21]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[22]  Zeshui Xu,et al.  Some new similarity measures for intuitionistic fuzzy values and their application in group decision making , 2010 .

[23]  Shyi-Ming Chen,et al.  Handling multicriteria fuzzy decision-making problems based on vague set theory , 1994 .

[24]  Capers Jones,et al.  Assessment and control of software risks , 1994, Yourdon Press Computing Series.

[25]  Zhenhua Zhang,et al.  Induced generalized dual hesitant fuzzy Shapley hybrid operators and their application in multi-attributes decision making , 2016, J. Intell. Fuzzy Syst..

[26]  Weidong Xia,et al.  Complexity of Information Systems Development Projects: Conceptualization and Measurement Development , 2005, J. Manag. Inf. Syst..

[27]  Taghi M. Khoshgoftaar,et al.  Application of fuzzy expert systems in assessing operational risk of software , 2003, Inf. Softw. Technol..