Incentive-punitive risk function with interval valued intuitionistic fuzzy information for outsourced software project risk assessment
暂无分享,去创建一个
Yong Hu | Zhao Chen | Zhenhua Zhang | Chao Ma | Shenguo Yuan | Jinhui Xu | Zhenhua Zhang | Yong Hu | Jinhui Xu | Chao Ma | Shenguo Yuan | Zhao Chen
[1] Chao Ma,et al. Some Novel Dynamic Fuzzy Sets Models Applied to the Classification of Outsourced Software Project Risk , 2016 .
[2] K. Atanassov,et al. Interval-Valued Intuitionistic Fuzzy Sets , 2019, Studies in Fuzziness and Soft Computing.
[3] Krassimir T. Atanassov,et al. Intuitionistic fuzzy sets , 1986 .
[4] B. Boehm. Software risk management: principles and practices , 1991, IEEE Software.
[5] Mark Keil,et al. Understanding software project risk: a cluster analysis , 2004, Inf. Manag..
[6] Pei Wang,et al. Entropy, similarity measure of interval-valued intuitionistic fuzzy sets and their applications , 2011, Inf. Sci..
[7] Yong Hu,et al. A Dynamic Interval-Valued Intuitionistic Fuzzy Sets Applied to Pattern Recognition , 2013 .
[8] Mark Keil,et al. Software project risks and their effect on outcomes , 2004, CACM.
[9] Jianfeng Du,et al. Intelligent Analysis Model for Outsourced Software Project Risk Using Constraint-based Bayesian Network , 2012, J. Softw..
[10] Dug Hun Hong,et al. Multicriteria fuzzy decision-making problems based on vague set theory , 2000, Fuzzy Sets Syst..
[11] Yong Hu,et al. A Novel Weighted Average Index Method of Interval Valued Intuitionistic Fuzzy Sets and Its Application to Outsourced Software Project Risk Assessment , 2016 .
[12] Yong Hu,et al. Software project risk analysis using Bayesian networks with causality constraints , 2013, Decis. Support Syst..
[13] Gary Klein,et al. An exploration of the relationship between software development process maturity and project performance , 2004, Inf. Manag..
[14] Barry W. Boehm,et al. Software Engineering Economics , 1993, IEEE Transactions on Software Engineering.
[15] Sarma R. Nidumolu. The Effect of Coordination and Uncertainty on Software Project Performance: Residual Performance Risk as an Intervening Variable , 1995, Inf. Syst. Res..
[16] Zeshui Xu,et al. Some similarity measures of intuitionistic fuzzy sets and their applications to multiple attribute decision making , 2007, Fuzzy Optim. Decis. Mak..
[17] Xiangzhou Zhang,et al. Cost-sensitive and ensemble-based prediction model for outsourced software project risk prediction , 2015, Decis. Support Syst..
[18] Kalle Lyytinen,et al. Identifying Software Project Risks: An International Delphi Study , 2001, J. Manag. Inf. Syst..
[19] J. Z. Chen,et al. An Unsupervised Model on Outsourcing Software Projects Risks Based on T-S Fuzzy Neural Network , 2015 .
[20] Jianfeng Du,et al. An integrative framework for intelligent software project risk planning , 2013, Decis. Support Syst..
[21] Lotfi A. Zadeh,et al. Fuzzy Sets , 1996, Inf. Control..
[22] Zeshui Xu,et al. Some new similarity measures for intuitionistic fuzzy values and their application in group decision making , 2010 .
[23] Shyi-Ming Chen,et al. Handling multicriteria fuzzy decision-making problems based on vague set theory , 1994 .
[24] Capers Jones,et al. Assessment and control of software risks , 1994, Yourdon Press Computing Series.
[25] Zhenhua Zhang,et al. Induced generalized dual hesitant fuzzy Shapley hybrid operators and their application in multi-attributes decision making , 2016, J. Intell. Fuzzy Syst..
[26] Weidong Xia,et al. Complexity of Information Systems Development Projects: Conceptualization and Measurement Development , 2005, J. Manag. Inf. Syst..
[27] Taghi M. Khoshgoftaar,et al. Application of fuzzy expert systems in assessing operational risk of software , 2003, Inf. Softw. Technol..