A methodology for the development of delay mitigation measures in construction projects

Abstract The aim of the present study is to present a methodology for the development of delay mitigation measures in construction projects. The proposed methodology, based on the identification of the underlying causes of delays and the stages of the construction project at which their observed causes take place, comprises four steps namely, questionnaire design, data collection, data analysis and development of delay mitigation measures in a focus group discussion. The application of this methodology in the Portuguese context, based on 94 surveys completed by clients, consultants and contractors, resulted in the identification of six underlying causes of delays in construction that were used to develop a set of mitigation measures. The results, on one hand, confirm the value of the methodology in helping to develop delay mitigation measures; on the other hand, they provide guidelines for the application of the methodology. Thus, this study contributes to the literature on project management by presenting an innovative methodology for the development of effective and practical delay mitigation measures in construction projects.

[1]  V. Vasugi,et al.  Critical causes of time overrun in Indian construction projects and mitigation measures , 2018, International Journal of Construction Education and Research.

[2]  Murat Gunduz,et al.  Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey , 2013 .

[3]  Lauri Koskela,et al.  Need for Alternative Research Approaches in Construction Management: Case of Delay Studies , 2013 .

[4]  Long Le-Hoai,et al.  Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .

[5]  Stephen O. Ogunlana,et al.  Problems causing delays in major construction projects in Thailand , 2008 .

[6]  Kumar Neeraj Jha,et al.  Acceptance of the Incentive/Disincentive Contracting Strategy in Developing Construction Markets: Empirical Study from India , 2016 .

[7]  Anil Sawhney,et al.  Structural equation model for investigating factors affecting delay in Indian construction projects , 2012 .

[8]  Terry Williams,et al.  The front-end of projects: a systematic literature review and structuring , 2019, Production Planning & Control.

[9]  Prasanta Kumar Dey,et al.  Project risk management using multiple criteria decision-making technique and decision tree analysis: a case study of Indian oil refinery , 2012 .

[10]  Shelley B. Wepner,et al.  Getting at the Moral Leadership of Education Deans , 2002 .

[11]  Peter E.D. Love,et al.  Building information modelling in construction: insights from collaboration and change management perspectives , 2018 .

[12]  Martin Skitmore,et al.  Marketing and pricing strategy , 2009 .

[13]  Thomas Y. Choi,et al.  Survey research in operations management: historical analyses , 2003 .

[14]  N. Leech,et al.  A Qualitative Framework for Collecting and Analyzing Data in Focus Group Research , 2009 .

[15]  Anil Sawhney,et al.  Analysing factors affecting delays in Indian construction projects , 2012 .

[16]  Seokho Chi,et al.  Negotiating subcontract conditions in the Australian construction industry , 2015 .

[17]  Ming Sun,et al.  Cost and time control of construction projects: inhibiting factors and mitigating measures in practice , 2010 .

[18]  Hamdi A. Bashir,et al.  Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study , 2015 .

[19]  Luis F. Alarcón,et al.  Analysis of Factors Influencing Productivity Using Craftsmen Questionnaires: Case Study in a Chilean Construction Company , 2011 .

[20]  Alfons Oude Lansink,et al.  Assessing dynamic inefficiency of the Spanish construction sector pre- and post-financial crisis , 2014, Eur. J. Oper. Res..

[21]  Cipriano Forza,et al.  Survey research in operations management: a process‐based perspective , 2002 .

[22]  Tommy Y. Lo,et al.  Construction Delays in Hong Kong Civil Engineering Projects , 2006 .

[23]  Shaligram Pokharel,et al.  Impact of competitive conditions on supplier evaluation: a construction supply chain case study , 2018 .

[24]  Serdar Durdyev,et al.  Causes of delays on construction projects: a comprehensive list , 2019, International Journal of Managing Projects in Business.

[25]  K. N. Jha,et al.  Factors affecting cost performance: evidence from Indian construction projects , 2005 .

[26]  Xianhai Meng,et al.  Proactive management in the context of construction supply chains , 2020, Production Planning & Control.

[27]  Hans Lind,et al.  Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden , 2014 .

[28]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[29]  Van Truong Luu,et al.  Delay factor analysis for hospital projects in Vietnam , 2016 .

[30]  Hamzah Abdul-Rahman,et al.  Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach , 2018 .

[31]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[32]  Mohammad Hossein Fallahnejad,et al.  Delay causes in Iran gas pipeline projects , 2013 .

[33]  Shahryar Sorooshian,et al.  4P delays in project management , 2018 .

[34]  Behrouz Zarei,et al.  Delay causes analysis in complex construction projects: a Semantic Network Analysis approach , 2018 .

[35]  Shannon K. Gilmartin,et al.  Assessing Response Rates and Nonresponse Bias in Web and Paper Surveys , 2003 .

[36]  Hamzah Abdul-Rahman,et al.  Exploring the underlying factors inducing design changes during building production , 2018 .

[37]  Sara A. McComb,et al.  Project team effectiveness: the case for sufficient setup and top management involvement , 2008 .

[38]  Farook Hamzeh,et al.  Understanding the planner’s role in lookahead construction planning , 2019, Production Planning & Control.

[39]  Cletus Moobela,et al.  Profiling causative factors leading to construction project delays in the United Arab Emirates , 2017 .

[40]  Ebenezer Adaku,et al.  Beyond the causes: Rethinking mitigating measures to avert cost and time overruns in construction projects , 2017 .

[41]  Yue Choong Kog,et al.  Construction Delays in Indonesia, Malaysia, Thailand, and Vietnam , 2019, Practice Periodical on Structural Design and Construction.

[42]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[43]  A.G.J.M. Oude Lansink,et al.  Measurement of Input-Specific Productivity Growth with an Application to the Construction Industry in Spain and Portugal , 2014 .

[44]  J. Kitzinger,et al.  Qualitative Research: Introducing focus groups , 1995 .

[45]  Intan Rohani Endut,et al.  Factors contributing to project time and hence cost overrun in the Malaysian construction industry , 2014 .

[46]  Muhammad Umer,et al.  Influencing factors indicating time delay in construction projects: impact of firm size and experience , 2019, International Journal of Construction Management.

[47]  Albert P.C. Chan,et al.  Investigating the causes of delay in grain bin construction projects: the case of China , 2019 .

[48]  L. Ferreira,et al.  Is the construction industry aware of supply chain management? The Portuguese contractors’ perspective , 2015 .

[49]  Amund Bruland,et al.  Causes of Delay in Road Construction Projects , 2012 .

[50]  Z. Irani,et al.  The costs of rework: insights from construction and opportunities for learning , 2018, Production Planning & Control.