Validation of lean manufacturing measurement instrument

This study is intended to provide a valid and reliable measurement instrument for lean manufacturing practices.It is important as lack of consensus regarding the valid and comprehensive measure of lean manufacturing implementation was observed in lean manufacturing literature. 182 large and discrete process manufacturers in Indonesia were involved in this study.A structural equation modeling approach was applied to validate the instrument.The study led to the conclusion that the measurement instrument is valid and reliable.In addition, the study suggested that lean manufacturing practices should be implemented holistically and simultaneously because they are interdependent.

[1]  Carole L Kimberlin,et al.  Validity and reliability of measurement instruments used in research. , 2008, American journal of health-system pharmacy : AJHP : official journal of the American Society of Health-System Pharmacists.

[2]  Paul Milgrom,et al.  Complementarities and fit strategy, structure, and organizational change in manufacturing , 1995 .

[3]  Giorgia Dal Pont,et al.  Complementarity and lean manufacturing bundles: an empirical analysis , 2011 .

[4]  Jostein Pettersen,et al.  Defining Lean Production : Some conceptual and practical issues , 2008 .

[5]  Arawati Agus,et al.  Lean production supply chain management as driver towards enhancing product quality and business performance , 2012 .

[6]  S. Afshin Mansouri,et al.  The lean-performance relationship in services: a theoretical model , 2014 .

[7]  Mark N. Frolick,et al.  A comparative analysis and review of JIT “implementation” research , 1995 .

[8]  Stephen G. West,et al.  Structural equation models with non-normal variables: Problems and remedies , 1995 .

[9]  T. Cheng,et al.  The unique and complementary effects of manufacturing technologies and lean practices on manufacturing operational performance , 2014 .

[10]  Roger G. Schroeder,et al.  A FRAMEWORK AND MEASUREMENT INSTRUMENT FOR JUST‐IN‐TIME MANUFACTURING , 1993 .

[11]  Roger G. Schroeder,et al.  THE ROLE OF INFRASTRUCTURE PRACTICES IN THE EFFECTIVENESS OF JIT PRACTICES: IMPLICATIONS FOR PLANT COMPETITIVENESS , 2003 .

[12]  S. West,et al.  The robustness of test statistics to nonnormality and specification error in confirmatory factor analysis. , 1996 .

[13]  Jon A. Krosnick,et al.  Designing Rating Scales for Effective Measurement in Surveys , 1997 .

[14]  S. Finney,et al.  Item parceling issues in structural equation modeling , 2001 .

[15]  Roger G. Schroeder,et al.  The impact of just-in-time manufacturing and its infrastructure on manufacturing performance , 1997 .

[16]  Scott B. MacKenzie,et al.  Common method biases in behavioral research: a critical review of the literature and recommended remedies. , 2003, The Journal of applied psychology.

[17]  Rachna Shah,et al.  Defining and developing measures of lean production , 2007 .

[18]  Frank Wiengarten,et al.  Internal lean practices and operational performance: The contingency perspective of industry clockspeed , 2013 .

[19]  Ana B. Escrig-Tena,et al.  An empirical assessment of the EFQM Excellence Model: Evaluation as a TQM framework relative to the MBNQA Model , 2009 .

[20]  Jose Arturo Garza-Reyes,et al.  The impact of lean methods and tools on the operational performance of manufacturing organisations , 2014 .

[21]  Emilio Bartezzaghi,et al.  The Impact of Just‐in‐time on Production System Performance: An Analytical Framework , 1989 .

[22]  Inderpreet Singh Ahuja,et al.  An evaluation of just in time (JIT) implementation on manufacturing performance in Indian industry , 2014 .

[23]  Robert C MacCallum,et al.  Using Parcels to Convert Path Analysis Models Into Latent Variable Models , 2005, Multivariate behavioral research.

[24]  Rosemary R. Fullerton,et al.  Lean Manufacturing, Non-Financial Performance Measures, and Financial Performance , 2009 .

[25]  Peter T. Ward,et al.  Lean manufacturing: context, practice bundles, and performance , 2003 .

[26]  R. Bagozzi,et al.  On the evaluation of structural equation models , 1988 .

[27]  Siti Norezam Othman,et al.  Measurement instrument for lean manufacturing , 2015 .

[28]  Byron J. Finch Operations Now: Supply Chain Profitability and Performance , 2007 .

[29]  Siti Norezam Othman,et al.  Lean manufacturing practices in Indonesian manufacturing firms: Are there business performance effects? , 2016 .

[30]  U. Sekaran,et al.  Research Methods for Business : A Skill Building Approach (5th Edition) , 1992 .

[31]  P. Bentler,et al.  Fit indices in covariance structure modeling : Sensitivity to underparameterized model misspecification , 1998 .

[32]  J. Krosnick Response strategies for coping with the cognitive demands of attitude measures in surveys , 1991 .

[33]  Nigel Slack,et al.  Operations management , 1994 .

[34]  K. Bollen,et al.  An Empirical Evaluation of the Use of Fixed Cutoff Points in RMSEA Test Statistic in Structural Equation Models , 2008, Sociological methods & research.

[35]  Inderpreet Singh Ahuja,et al.  An evaluation of TPM initiatives in Indian industry for enhanced manufacturing performance , 2008 .

[36]  Kazi Arif-Uz-Zaman,et al.  Lean supply chain performance measurement , 2014 .

[37]  Mustafa Özbayrak,et al.  Leanness: experiences from the journey to date , 2005 .

[38]  Jitesh Thakkar,et al.  Status of lean manufacturing practices in Indian industries and government initiatives , 2014 .

[39]  Hiroyuki Hirano,et al.  JIT Factory Revolution: A Pictorial Guide to Factory Design of the Future , 1989 .

[40]  Paul R. Milgrom,et al.  The Economics of Modern Manufacturing: Technology, Strategy, and Organization , 1990 .

[41]  Roberto Filippini,et al.  The impact of the just-in-time approach on production system performance: A survey of Italian industry. A review and outlook , 2016 .

[42]  Christian Hofer,et al.  The effect of lean production on financial performance: The mediating role of inventory leanness , 2012 .

[43]  Andrea Vinelli,et al.  Interrelationships among lean bundles and their effects on operational performance , 2008 .

[44]  Siti Norezam Othman,et al.  The impact of lean manufacturing practices on operations performance: A study on Indonesian manufacturing companies , 2010 .

[45]  Siti Norezam Othman,et al.  Impact of lean practices on operations performance and business performance , 2013 .