Validation of lean manufacturing measurement instrument
暂无分享,去创建一个
[1] Carole L Kimberlin,et al. Validity and reliability of measurement instruments used in research. , 2008, American journal of health-system pharmacy : AJHP : official journal of the American Society of Health-System Pharmacists.
[2] Paul Milgrom,et al. Complementarities and fit strategy, structure, and organizational change in manufacturing , 1995 .
[3] Giorgia Dal Pont,et al. Complementarity and lean manufacturing bundles: an empirical analysis , 2011 .
[4] Jostein Pettersen,et al. Defining Lean Production : Some conceptual and practical issues , 2008 .
[5] Arawati Agus,et al. Lean production supply chain management as driver towards enhancing product quality and business performance , 2012 .
[6] S. Afshin Mansouri,et al. The lean-performance relationship in services: a theoretical model , 2014 .
[7] Mark N. Frolick,et al. A comparative analysis and review of JIT “implementation” research , 1995 .
[8] Stephen G. West,et al. Structural equation models with non-normal variables: Problems and remedies , 1995 .
[9] T. Cheng,et al. The unique and complementary effects of manufacturing technologies and lean practices on manufacturing operational performance , 2014 .
[10] Roger G. Schroeder,et al. A FRAMEWORK AND MEASUREMENT INSTRUMENT FOR JUST‐IN‐TIME MANUFACTURING , 1993 .
[11] Roger G. Schroeder,et al. THE ROLE OF INFRASTRUCTURE PRACTICES IN THE EFFECTIVENESS OF JIT PRACTICES: IMPLICATIONS FOR PLANT COMPETITIVENESS , 2003 .
[12] S. West,et al. The robustness of test statistics to nonnormality and specification error in confirmatory factor analysis. , 1996 .
[13] Jon A. Krosnick,et al. Designing Rating Scales for Effective Measurement in Surveys , 1997 .
[14] S. Finney,et al. Item parceling issues in structural equation modeling , 2001 .
[15] Roger G. Schroeder,et al. The impact of just-in-time manufacturing and its infrastructure on manufacturing performance , 1997 .
[16] Scott B. MacKenzie,et al. Common method biases in behavioral research: a critical review of the literature and recommended remedies. , 2003, The Journal of applied psychology.
[17] Rachna Shah,et al. Defining and developing measures of lean production , 2007 .
[18] Frank Wiengarten,et al. Internal lean practices and operational performance: The contingency perspective of industry clockspeed , 2013 .
[19] Ana B. Escrig-Tena,et al. An empirical assessment of the EFQM Excellence Model: Evaluation as a TQM framework relative to the MBNQA Model , 2009 .
[20] Jose Arturo Garza-Reyes,et al. The impact of lean methods and tools on the operational performance of manufacturing organisations , 2014 .
[21] Emilio Bartezzaghi,et al. The Impact of Just‐in‐time on Production System Performance: An Analytical Framework , 1989 .
[22] Inderpreet Singh Ahuja,et al. An evaluation of just in time (JIT) implementation on manufacturing performance in Indian industry , 2014 .
[23] Robert C MacCallum,et al. Using Parcels to Convert Path Analysis Models Into Latent Variable Models , 2005, Multivariate behavioral research.
[24] Rosemary R. Fullerton,et al. Lean Manufacturing, Non-Financial Performance Measures, and Financial Performance , 2009 .
[25] Peter T. Ward,et al. Lean manufacturing: context, practice bundles, and performance , 2003 .
[26] R. Bagozzi,et al. On the evaluation of structural equation models , 1988 .
[27] Siti Norezam Othman,et al. Measurement instrument for lean manufacturing , 2015 .
[28] Byron J. Finch. Operations Now: Supply Chain Profitability and Performance , 2007 .
[29] Siti Norezam Othman,et al. Lean manufacturing practices in Indonesian manufacturing firms: Are there business performance effects? , 2016 .
[30] U. Sekaran,et al. Research Methods for Business : A Skill Building Approach (5th Edition) , 1992 .
[31] P. Bentler,et al. Fit indices in covariance structure modeling : Sensitivity to underparameterized model misspecification , 1998 .
[32] J. Krosnick. Response strategies for coping with the cognitive demands of attitude measures in surveys , 1991 .
[33] Nigel Slack,et al. Operations management , 1994 .
[34] K. Bollen,et al. An Empirical Evaluation of the Use of Fixed Cutoff Points in RMSEA Test Statistic in Structural Equation Models , 2008, Sociological methods & research.
[35] Inderpreet Singh Ahuja,et al. An evaluation of TPM initiatives in Indian industry for enhanced manufacturing performance , 2008 .
[36] Kazi Arif-Uz-Zaman,et al. Lean supply chain performance measurement , 2014 .
[37] Mustafa Özbayrak,et al. Leanness: experiences from the journey to date , 2005 .
[38] Jitesh Thakkar,et al. Status of lean manufacturing practices in Indian industries and government initiatives , 2014 .
[39] Hiroyuki Hirano,et al. JIT Factory Revolution: A Pictorial Guide to Factory Design of the Future , 1989 .
[40] Paul R. Milgrom,et al. The Economics of Modern Manufacturing: Technology, Strategy, and Organization , 1990 .
[41] Roberto Filippini,et al. The impact of the just-in-time approach on production system performance: A survey of Italian industry. A review and outlook , 2016 .
[42] Christian Hofer,et al. The effect of lean production on financial performance: The mediating role of inventory leanness , 2012 .
[43] Andrea Vinelli,et al. Interrelationships among lean bundles and their effects on operational performance , 2008 .
[44] Siti Norezam Othman,et al. The impact of lean manufacturing practices on operations performance: A study on Indonesian manufacturing companies , 2010 .
[45] Siti Norezam Othman,et al. Impact of lean practices on operations performance and business performance , 2013 .