A Study on Production Policies in hybrid MTO-MTS Production Environment
暂无分享,去创建一个
[1] V. Donk. Make to stock or make to order: the decoupling point in the food processing industries , 2001 .
[2] Georghios P. Sphicas,et al. EOQ and EPQ with linear and fixed backorder costs: Two cases identified and models analyzed without calculus , 2006 .
[3] T. Sawik. Integer programming approach to production scheduling for make-to-order manufacturing , 2005, Math. Comput. Model..
[4] A. Federgruen,et al. The Impact of Adding a Make-To-Order Item to a Make-To-Stock Production System , 1999 .
[5] M. A. Carravilla,et al. Hierarchical production planning in a make-to-order company: A case study , 1995 .
[6] E. S. Lee,et al. A heuristic for scheduling general job shops to minimize maximum lateness , 1998 .
[7] Izak Duenyas,et al. Optimal Admission Control and Sequencing in a Make-to-Stock/Make-to-Order Production System , 2000, Oper. Res..
[8] S. Rajagopalan,et al. Make to Order or Make to Stock: Model and Application , 2002, Manag. Sci..
[9] Won Young Yun,et al. Optimal lot sizing for an unreliable production system under partial backlogging and at most two failures in a production cycle , 2005 .
[10] D. P. Donk,et al. Combined make-to-order and make-to-stock in a food production system , 2004 .
[11] John B. Jensen,et al. Evaluation of scheduling rules with commensurate customer priorities in job shops , 1995 .
[12] Christian Larsen. The economic production lot size model extended to include more than one production rate , 2005, Int. Trans. Oper. Res..
[13] Gregory A. DeCroix,et al. Make-to-order versus make-to-stock in a production-inventory system with general production times , 1998 .
[14] Brian G. Kingsman,et al. The effect of workload control (WLC) on performance in make-to-order companies , 1998 .
[15] Mohamed Ben-Daya,et al. The economic production lot-sizing problem with imperfect production processes and imperfect maintenance , 2002 .