Dynamic short term production scheduling and machine allocation in underground mining using mathematical programming
暂无分享,去创建一个
[1] W. Matthew Carlyle,et al. Underground Planning at Stillwater Mining Company , 2001, Interfaces.
[2] Erkan Topal,et al. A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining , 2008 .
[3] Erkan Topal,et al. Production schedule optimisation in underground hard rock mining using mixed integer programming , 2007 .
[4] Nick Vagenas,et al. Simulation of Haulage Truck Loading Techniques in an Underground Mine Using WITNESS , 1997, Simul..
[5] Erkan Topal,et al. Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling , 2008 .
[6] Michel Gamache,et al. An enumeration algorithm for solving the fleet management problem in underground mines , 2006, Comput. Oper. Res..
[7] Horacio J. Marquez,et al. A stochastic optimization approach to mine truck allocation , 2005 .