Optimal prioritisation of watershed management measures for flood risk mitigation on a watershed scale

Watershed management includes methods to create, enhance, and maintain vegetation to reduce run-off and provide flood control in the watershed. The assignment of priority for watershed management measures requires the use of mathematical techniques to attain the most suitable strategies. In the present study, a framework was presented for assigning the optimal combinations of watershed management measures based on simulation-based optimisation approach. For this purpose, a one-dimensional hydrodynamic model was used to calculate the potential damages of different flood scenarios under various combinations of watershed management measures and was coupled with the NSGA-II multi-objective optimisation model to provide the optimal Pareto solutions between two conflicting objectives of minimising the investment costs of flood mitigation measures and the expected flood damages of the watershed. The proposed model was then applied to a small watershed in the centre of Iran as a case study, and the optimal trade-off solutions were calculated for flood risk mitigation. Using these trade-offs, for each level of funding, decision makers can select the optimal combination of watershed management measures considering decision criteria.

[1]  H. Madsen,et al.  Simulation and optimisation modelling approach for operation of the Hoa Binh Reservoir, Vietnam , 2007 .

[2]  Reza Kerachian,et al.  A real-time operation optimization model for flood management in river-reservoir systems , 2010 .

[3]  Larry W. Mays,et al.  Optimizing Retention Basin Networks , 2008 .

[4]  Reza Maknoon,et al.  Probabilistic rainfall thresholds for flood forecasting: evaluating different methodologies for modelling rainfall spatial correlation (or dependence) , 2011 .

[5]  Li-Chiu Chang,et al.  Guiding rational reservoir flood operation using penalty-type genetic algorithm , 2008 .

[6]  Franklin M. Fisher,et al.  Analyzing agricultural demand for water with an optimizing model , 1999 .

[7]  Dennis J. Parker,et al.  Evaluating flood damages: guidance and recommendations on principles and methods executive summary , 2007 .

[8]  S. Murty Bhallamudi,et al.  Non-Uniform Flow Effect on Optimal Waste Load Allocation in Rivers , 2006 .

[9]  S. Murty Bhallamudi,et al.  Multiobjective Optimal Waste Load Allocation Models for Rivers Using Nondominated Sorting Genetic Algorithm-II , 2006 .

[10]  Patrick M. Reed,et al.  Striking the Balance: Long-Term Groundwater Monitoring Design for Conflicting Objectives , 2004 .

[11]  Mohammad Karamouz,et al.  Development of Optimization Schemes for Floodplain Management; A Case Study , 2009 .

[12]  Kalyanmoy Deb,et al.  A Fast Elitist Non-dominated Sorting Genetic Algorithm for Multi-objective Optimisation: NSGA-II , 2000, PPSN.

[13]  Jery R. Stedinger,et al.  USACE Experience in Implementing Risk Analysis for Flood Damage Reduction Projects , 2008 .

[14]  D. Moorhead,et al.  Increasing risk of great floods in a changing climate , 2002, Nature.

[15]  Land use effectiveness by farm households after land and forest allocation at Tran Yen district, Yen Bai province [Viet Nam] , 2004 .

[16]  Mark P. J. DeGagné,et al.  Red River Basin Stage-Damage Curves Update and Preparation of Flood Damage Maps , 2000 .

[17]  Slobodan P. Simonovic,et al.  A three‐dimensional fuzzy methodology for flood risk analysis , 2011 .

[18]  Reza Kerachian,et al.  A stochastic conflict resolution model for trading pollutant discharge permits in river systems , 2009, Environmental monitoring and assessment.

[19]  M L Corry,et al.  Design of Encroachments on Flood Plains Using Risk Analysis , 1981 .

[20]  F. Messner,et al.  FLOOD DAMAGE, VULNERABILITY AND RISK PERCEPTION – CHALLENGES FOR FLOOD DAMAGE RESEARCH , 2006 .

[21]  Daniel P. Loucks,et al.  Nonstructural floodplain planning , 1978 .

[22]  John C. Day,et al.  A Recursive Programing Model for Nonstructural Flood Damage Control , 1970 .

[23]  Miguel A. Mariño,et al.  Optimizing River Diversion under Hydraulic and Hydrologic Uncertainties , 1994 .

[24]  David T. Ford,et al.  QUANTIFYING THE BENEFIT OF A FLOOD WARNING SYSTEM , 2004 .

[25]  Nathan Pingel,et al.  Estimating Forecast Lead Time , 2005 .

[26]  J. Ganoulis,et al.  Risk‐based floodplain management: A case study from Greece , 2003 .

[27]  Shie-Yui Liong,et al.  Alternative Decision Making in Water Distribution Network with NSGA-II , 2006 .

[28]  Seyed Hamidreza Sadeghi,et al.  Land use optimization in watershed scale , 2009 .

[29]  Olivier Ducourtieux,et al.  Land Policy and Farming Practices in Laos , 2005 .

[30]  Kenneth A. Algozin,et al.  Economically efficient watershed management with environmental impact and income distribution goals , 1998 .

[31]  Timothy O. Randhir,et al.  A watershed-based land prioritization model for water supply protection , 2001 .

[32]  M. Janga Reddy,et al.  Multiobjective Differential Evolution with Application to Reservoir System Optimization , 2007 .

[33]  Amin Rasekh,et al.  Risk-Cost Optimization of Hydraulic Structures: Methodology and Case Study , 2010 .

[34]  Yeou-Koung Tung Effects of uncertainties on optimal risk-based design of hydraulic structures , 1987 .

[35]  Steven A. Gabriel,et al.  A multiobjective optimization approach to smart growth in land development , 2006 .

[36]  Larry W. Mays,et al.  Optimal risk‐based design of flood levee systems , 1981 .

[37]  Jinsheng You,et al.  A watershed-simulation and hybrid optimization modeling approach for water-quality trading in soil erosion control , 2007 .

[38]  Jay R. Lund,et al.  Floodplain Planning with Risk-Based Optimization , 2002 .