Integrated construction environments: technology and implementation
暂无分享,去创建一个
[1] Boyd C. Paulson,et al. OPIS: an object model-based project information system , 1994 .
[2] Peter Brandon,et al. Integrated Construction Information , 1995 .
[3] Bo-Christer Björk. RATAS project - developing an infrastructure for computer-integrated construction , 1994 .
[4] Mustafa Alshawi,et al. A Modularised Integrated Computer Environment for the Construction Industry: SPACE , 1999, J. Inf. Technol. Constr..
[5] Yacine Rezgui,et al. Promoting Computer Integrated Construction Through the Use of Distribution Technology , 1996, J. Inf. Technol. Constr..
[6] A. Zarli,et al. Integrating STEP and CORBA for applications interoperability in the future virtual enterprises computer-based infrastructures , 1997, Proceedings Intelligent Information Systems. IIS'97.
[7] Lorin M. Hitt,et al. Beyond the Productivity Paradox: Computers are the Catalyst for Bigger Changes , 1998 .
[8] Ghassan Aouad,et al. A Process for Change - the Development of a Generic Design and Construction Process Protocol for the UK Construction Industry , 1996 .
[9] Mustafa Alshawi,et al. A Framework for the Object Life Cycle in Integrated Environments , 1997 .
[10] S. Kim,et al. An Environment for Integrating Building Design, Construction Scheduling, and Cost Estimating , 1991 .
[11] Mustafa Alshawi,et al. An industry foundation classes Web-based collaborative construction computer environment: WISPER , 2000 .
[12] Thomas Froese,et al. Integration through standard project models , 1992 .
[13] Mustafa Alshawi,et al. Distributed Object Environment: Using International Standards for Data Exchange in the Construction Industry , 1999 .
[14] M. Hammer,et al. REENGINEERING THE CORPORATION: A MANIFESTO FOR BUSINESS REVOLUTION , 1995 .
[15] C. J. Anumba,et al. Information and communications technologies to facilitate concurrent engineering in construction , 1997 .
[16] Wanda J. Orlikowski,et al. Learning from Notes: organizational issues in groupware implementation , 1992, CSCW '92.
[17] N. F. O. Evbuomwan,et al. Communications issues in concurrent life-cycle design and construction , 1997 .
[18] Charles M. Eastman,et al. Product modeling strategies for today and the future , 1998 .
[19] Robert Amor,et al. Misconceptions About Integrated Project Databases , 2001, J. Inf. Technol. Constr..
[20] T. Davenport,et al. Case Management and the Integration of Labor , 1994 .