Mixed-Model Assembly Line Sequencing Using Real Options
暂无分享,去创建一个
Reza Tavakkoli-Moghaddam | Fariborz Jolai | Masoud Rabbani | Alireza Rahimi-Vahed | Neda Manavizadeh | R. Tavakkoli-Moghaddam | A. Rahimi-Vahed | M. Rabbani | F. Jolai | N. Manavizadeh
[1] George Steiner,et al. A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems , 1990 .
[2] Avraham Shtub,et al. An analytic framework for sequencing mixed model assembly lines , 1992 .
[3] Patrick R. McMullen,et al. An efficient frontier approach to addressing JIT sequencing problems with setups via search heuristics , 2001 .
[4] L. Trigeorgis. Real Options in Capital Investment: Models, Strategies, and Applications , 1995 .
[5] John B. Kidd,et al. Toyota Production System , 1993 .
[6] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .
[7] Jan Olhager,et al. Valuation of product-mix flexibility using real options , 2002 .
[8] Patrick R. McMullen,et al. An ant colony optimization approach to addressing a JIT sequencing problem with multiple objectives , 2001, Artif. Intell. Eng..
[9] Avraham Shtub,et al. SEQUENCING MIXED-MODEL ASSEMBLY LINES TO LEVEL PARTS USAGE AND MINIMIZE LINE LENGTH , 1994 .
[10] Patrick R. McMullen,et al. JIT sequencing for mixed-model assembly lines with setups using Tabu Search , 1998 .
[11] Yeongho Kim,et al. A genetic alorithm for multiple objective sequencing problems in mixed model assembly lines , 1998 .