Review of combinatorial problems induced by spatial forest harvesting planning
暂无分享,去创建一个
[1] Felipe Caro,et al. A 2-Opt Tabu Search Procedure for the Multiperiod Forest Harvesting Problem with Adjacency, Greenup, Old Growth, and Even Flow Constraints , 2003, Forest Science.
[2] A. Weintraub,et al. Forest management challenges for operational researchers , 1998 .
[3] C. Lockwood,et al. Harvest scheduling with spatial constraints: a simulated annealing approach , 1993 .
[4] Andres Weintraub,et al. A Forest Management Planning Model Integrating Silvicultural and Transportation Activities , 1976 .
[5] Francisco Barahona,et al. Harvest Scheduling Subject to Maximum Area Restrictions: Exploring Exact Approaches , 2005, Oper. Res..
[6] Francisco Barahona,et al. Habitat Dispersion in Forest Planning and the Stable Set Problem , 1992, Oper. Res..
[7] Miguel Constantino,et al. A column generation approach for solving a non-temporal forest harvest model with spatial structure constraints , 2005, Eur. J. Oper. Res..
[8] Brian Kent,et al. Natural resource and management planning using large-scale linear programs: the USDA forest service experience with FORPLAN , 1991 .
[9] Sheng-Roan Kai,et al. Design and Implementation of an Interactive Optimization System for Telephone Network Planning , 1992, Oper. Res..
[10] Alan T. Murray,et al. Scale and Unit Specification Influences in Harvest Scheduling with Maximum Area Restrictions , 2002 .
[11] Azim Houshyar,et al. Exact optimal solution for facility layout: deciding which pairs of locations should be adjacent , 1992 .
[12] Kevin Boston,et al. The economic impact of green-up constraints in the southeastern United States , 2001 .
[13] Richard L. Church,et al. Heuristic solution approaches to operational forest planning problems , 1995 .
[14] Alan T. Murray. Spatial restrictions in harvest scheduling , 1999 .
[15] Tara M. Barrett,et al. Voronoi tessellation methods to delineate harvest units for spatial forest planning , 1997 .
[16] Bernard G. Halterman,et al. Integrating timber and wildlife management planning , 1973 .
[17] José G. Borges,et al. Using dynamic programming and overlapping subproblems to address adjacency in large harvest scheduling problems , 1998 .
[18] Timothy P. McDonald,et al. A Three-Stage Heuristic for Harvest Scheduling with Access Road Network Development , 2000 .
[19] M. Pérez,et al. A Methodology to Analyze Divergent Case Studies of Non-Timber Forest Products and Their Development Potential , 1999 .
[20] Richard L. Church,et al. Support system development for forest ecosystem management , 2000, European Journal of Operational Research.
[21] G. Nemhauser,et al. A Strong Cutting Plane/Branch-and-Bound Algorithm for Node Packing , 1992 .
[22] E. Gunn,et al. A model and Tabu search method to optimize stand harvest and road construction schedules , 2000 .
[23] J. K. Gilless,et al. Economic and fragmentation effects of clearcut restrictions , 1998 .
[24] Monique Guignard-Spielberg,et al. A Problem of Forest Harvesting and Road Building Solved Through Model Strengthening and Lagrangean Relaxation , 2003, Oper. Res..
[25] Brian Kent,et al. Natural Resource Land Management Planning Using Large-Scale Linear Programs: The USDA Forest Service Experience with FORPLAN , 1991, Oper. Res..
[26] Alan T. Murray,et al. Analyzing Cliques for Imposing Adjacency Restrictions in Forest Models , 1996, Forest Science.