An economic order quantity model for an imperfect production process with entropy cost
暂无分享,去创建一个
[1] George W. Tyler. A Thermodynamic Model of Manpower Systems , 1989 .
[2] T.C.E. Cheng,et al. An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .
[3] Mohamad Y. Jaber,et al. Lot sizing with permissible delay in payments and entropy cost , 2007, Comput. Ind. Eng..
[4] Jim Freeman,et al. Inventory Control and Management , 1992 .
[5] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[6] T.C.E. Cheng. An economic order quantity model with demand-dependent unit cost , 1989 .
[7] Gianpaolo Callioni,et al. Inventory-driven costs. , 2005, Harvard business review.
[8] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[9] Timothy L. Urban. Analysis of production systems when run length influences product quality , 1998 .
[10] Marc A. Rosen,et al. A thermodynamic approach to modelling the economic order quantity , 2006 .
[11] M. N. Gopalan,et al. Expected number analysis of a two-server queueing network subject to inter-stage inspection and rework , 1995, Comput. Oper. Res..
[12] K. Arrow,et al. EXISTENCE OF AN EQUILIBRIUM FOR A COMPETITIVE ECONOMY , 1954 .
[13] KARLA E. BOURLAND,et al. The product cycling problem under increasing yield rates , 1997 .
[14] Marc A. Rosen,et al. On the thermodynamic treatment of diffusion-like economic commodity flows , 2006 .
[15] Y. Çengel,et al. Thermodynamics : An Engineering Approach , 1989 .
[16] M. A. Rosen,et al. Price-driven economic order systems from a thermodynamic point of view , 2004 .
[17] Marc A. Rosen,et al. The economic order quantity repair and waste disposal model with entropy cost , 2008, Eur. J. Oper. Res..
[18] Suresh Chand,et al. Lot sizes and setup frequency with learning in setups and process quality , 1989 .
[19] Moutaz Khouja. The use of minor setups within production cycles to improve product quality and yield , 2005, Int. Trans. Oper. Res..
[20] Mohamad Y. Jaber,et al. Lot sizing for an imperfect production process with quality corrective interruptions and improvements, and reduction in setups , 2006, Comput. Ind. Eng..
[21] Jennifer L. Hartnett,et al. Managing Quality: The Strategic and Competitive Edge , 1988 .
[22] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[23] Jerome S. Osteryoung,et al. Use of the EOQ model for inventory analysis , 1986 .
[24] Chin-Fu Ho,et al. Comparison between just-in-time and EOQ system , 1990 .
[25] Ron S. Kenett,et al. The impact of defects on a process with rework , 1995 .
[26] A. H. Redford,et al. Cost and performance analysis of a robotic rework cell , 1999 .
[27] F. Drechsler,et al. Decision Trees and the Second Law , 1968 .
[28] H. Uzawa. Walras' Tâtonnement in the Theory of Exchange , 1960 .
[29] John E. Ullmann. White‐collar productivity and the growth of administrative overhead , 1982 .