Optimum preventive maintenance policies for systems subject to random working times, replacement, and minimal repair

This paper proposes, from the economical viewpoint of preventive maintenance in reliability theory, several preventive maintenance policies for an operating system that works for jobs at random times and is imperfectly maintained upon failure. As a failure occurs, the system suffers one of two types of failure based on a specific random mechanism: type-I (repairable) failure is rectified by a minimal repair, and type-II (non-repairable) failure is removed by a corrective replacement. First, a modified random and age replacement policy is considered in which the system is replaced at a planned time T, at a random working time, or at the first type-II failure, whichever occurs first. Next, as one extended model, the system may work continuously for N jobs with random working times. Finally, as another extended model, we might consider replacing an operating system at the first working time completion over a planned time T. For each policy, the optimal schedule of preventive replacement that minimizes the mean cost rate is presented analytically and discussed numerically. Because the framework and analysis are general, the proposed models extend several existing results.

[1]  Toshio Nakagawa Advanced Reliability Models and Maintenance Policies , 2008 .

[2]  Yeu-Shiang Huang,et al.  A study on negative binomial inspection for imperfect production systems , 2013, Comput. Ind. Eng..

[3]  Toshio Nakagawa,et al.  Replacement and Preventive Maintenance Models with Random Working Times , 2010, IEICE Trans. Fundam. Electron. Commun. Comput. Sci..

[4]  Tangbin Xia,et al.  Modeling and optimizing maintenance schedule for energy systems subject to degradation , 2012, Comput. Ind. Eng..

[5]  Toshio Nakagawa,et al.  A cumulative damage shock model with imperfect preventive maintenance , 1991 .

[6]  N. A. J. Hastings,et al.  An Economic Replacement Model , 1967 .

[7]  Frank Beichelt,et al.  A unifying treatment of replacement policies with minimal repair , 1993 .

[8]  Shey-Huei Sheu,et al.  A multi-criteria optimal replacement policy for a system subject to shocks , 2011, Comput. Ind. Eng..

[9]  Masaaki Kijima,et al.  Periodical replacement problem without assuming minimal repair , 1988 .

[10]  Marvin Zelen,et al.  Mathematical Theory of Reliability , 1965 .

[11]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[12]  Toshio Nakagawa,et al.  Optimal imperfect preventive maintenance policies for a used system , 2012, Int. J. Syst. Sci..

[13]  Tao Chen,et al.  Optimal replacement policy for safety-related multi-component multi-state systems , 2012, Reliab. Eng. Syst. Saf..

[14]  Shey-Huei Sheu,et al.  A Bivariate Optimal Replacement Policy for a System With Age-dependent Minimal Repair and Cumulative Repair-cost Limit , 2013 .

[15]  Toshio Nakagawa,et al.  Maintenance Theory of Reliability , 2005 .

[16]  Shey-Huei Sheu,et al.  Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy , 2013 .

[17]  Shey-Huei Sheu,et al.  Optimal number of minimal repairs before replacement based on a cumulative repair-cost limit policy , 2010, Comput. Ind. Eng..

[18]  Wolfgang Stadje Renewal analysis of a replacement process , 2003, Oper. Res. Lett..

[19]  Hong-Zhong Huang,et al.  A Joint Redundancy and Imperfect Maintenance Strategy Optimization for Multi-State Systems , 2013, IEEE Transactions on Reliability.

[20]  Nader Ebrahimi Age Replacement Policies , 2010 .

[21]  Yen-Luan Chen,et al.  A bivariate optimal imperfect preventive maintenance policy for a used system with two-type shocks , 2012, Comput. Ind. Eng..

[22]  N. Hastings The Repair Limit Replacement Method , 1969 .

[23]  T. Nakagawa Sequential imperfect preventive maintenance policies , 1988 .

[24]  Menachem Berg,et al.  A Marginal Cost Analysis for an Age Replacement Policy With Minimal Repair , 1982 .

[25]  M. Kijima SOME RESULTS FOR REPAIRABLE SYSTEMS WITH GENERAL REPAIR , 1989 .

[26]  Toshio Nakagawa,et al.  RANDOM AND AGE REPLACEMENT POLICIES , 2010 .

[27]  Won Young Yun,et al.  Optimum replacement intervals with random time horizon , 2000 .

[28]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[29]  T. H. Savits,et al.  Age Dependent Minimal Repair. , 1985 .