Optimizing and controlling earthmoving operations using spatial technologies
暂无分享,去创建一个
[1] Mohamed Marzouk,et al. Special-Purpose Simulation Model for Balanced Cantilever Bridges , 2008 .
[2] Hui-Ping Tserng,et al. An Instantaneous Motion Planning and Controlling Tool (IMPACT) for Construction Equipment , 1997 .
[3] Clarkson H. Oglesby,et al. Methods improvement for construction managers , 1972 .
[4] Avraham Shtub,et al. Project management: engineering, technology, and implementation , 1994 .
[5] Sotoodeh-Khoo Hooman,et al. Sensors and Expert Systems in Production Optimization of Earthmoving Scrapers , 1989 .
[6] Kris G. Mattila,et al. Determination of Haul Distance and Direction in Mass Excavation , 2005 .
[7] Aviad Shapira,et al. Monitoring Construction Equipment for Automated Project Performance Control , 2002 .
[8] Foad Farid,et al. Simulation verifies queuing program for selecting loader-truck fleets , 1994 .
[9] J. Jurasz,et al. A Cost-Effective Positioning Solution for Asphalt Rollers Based on Low-Cost DGPS Receivers , 2002 .
[10] Ali Touran,et al. Integration of simulation with expert systems , 1990 .
[11] A. K. W. Jayawardane,et al. Further development of integer programming in earthwork optimization , 1990 .
[12] David S. Christensen. Is the Cumulative SCI-based EAC an Upper Bound to the Final Cost of Post-A12 Defense Contracts? , 2004 .
[13] François Peyret,et al. Architecture of a GPS-based guiding system for road compaction , 1998, Proceedings. 1998 IEEE International Conference on Robotics and Automation (Cat. No.98CH36146).
[14] Julio C. Martinez,et al. Reduction of Short-Interval GPS Data for Construction Operations Analysis , 2005 .
[15] Andrew D.F. Price,et al. Performance Measurement in Construction , 2004 .
[16] Amr A. Oloufa,et al. GPS-Based Wireless Collision Detection of Construction Equipment , 2002 .
[17] Daniel W. Halpin,et al. The use of simulation for productivity estimation based on multiple regression analysis , 2005, Proceedings of the Winter Simulation Conference, 2005..
[18] H. W. Parker,et al. Productivity improvement in construction , 1988 .
[19] Rafael Sacks,et al. Assessing research issues in Automated Project Performance Control (APPC) , 2007 .
[20] Amr A. Oloufa,et al. Automated Monitoring of Compaction Using GPS , 1997 .
[21] Sunil K. Sinha,et al. Construction equipment productivity estimation using artificial neural network model , 2006 .
[22] Osama Moselhi and Samir El-Omari. INTEGRATING BAR CODING AND RFID TO AUTOMATE DATA COLLECTION FROM CONSTRUCTION SITES , 2006 .
[23] Tarek Hegazy,et al. Genetic Optimization for Dynamic Project Control , 2003 .
[24] S. Easa. Earthwork Allocations with Linear Unit Costs , 1988 .
[25] C. M. Tam,et al. Artificial neural networks model for predicting excavator productivity , 2002 .
[26] Alain Lothon,et al. Techniques for Preventing Accidental Damage to Pipelines , 1996 .
[27] Sigurdur Olafsson,et al. Simulation optimization , 2002, Proceedings of the Winter Simulation Conference.
[28] S. Singer,et al. A genetic algorithm for the reactive power/voltage control problem , 2000, 21st IEEE Convention of the Electrical and Electronic Engineers in Israel. Proceedings (Cat. No.00EX377).
[29] Seung-Woo Han,et al. Simulation analysis of productivity variation by global positioning system (GPS) implementation in earthmoving operations , 2006 .
[30] Adel Alshibani. Tracking and Control of Earthmoving Operations Using Spatial Technologies , 2008 .
[31] Boyd C. Paulson,et al. Professional Construction Management , 1978 .
[32] François Peyret,et al. A Traceability System between Plant and Work Site for Asphalt Pavements , 2004 .
[33] Goldberg,et al. Genetic algorithms , 1993, Robust Control Systems with Genetic Algorithms.
[34] Simaan M. AbouRizk,et al. A framework for applying simulation in construction , 1998 .
[35] Julio C. Martínez,et al. EarthMover-simulation tool for earthwork planning , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[36] Neil N. Eldin,et al. Determination of most economical scrapers fleet , 2005 .
[37] Jingsheng Shi,et al. An Automated Modeling System for Simulating Earthmoving Operations , 1998 .
[38] Simaan M. AbouRizk,et al. AN OPTIMIZATION METHOD FOR SIMULATING LARGE COMPLEX SYSTEMS , 1995 .
[39] R. Navon,et al. Research in automated measurement of project performance indicators , 2007 .
[40] Mika Jaakkola,et al. Automatic Control of Road Construction Machinery ? Feasibility and Requirements , 2003 .
[41] Mohamed Marzouk,et al. Object-oriented Simulation Model for Earthmoving Operations , 2003 .
[42] Osama Moselhi,et al. Forecasting project status by using fuzzy logic , 2006 .
[43] David Coley,et al. Introduction to Genetic Algorithms for Scientists and Engineers , 1999 .
[44] Mohamed Marzouk. Optimizing earthmoving operations using computer simulation , 2002 .
[45] Mohamed Marzouk,et al. Multiobjective Optimization of Earthmoving Operations , 2004 .
[46] Osama Moselhi,et al. Web‐based integrated project control system , 2004 .
[47] Boyd C. Paulson. Interactive Graphics for Simulating Construction Operations , 1978 .
[48] O. Moselhi,et al. Automated Data Acquisition and Planning of Highway Construction , 2002 .
[49] Simaan M. AbouRizk,et al. Performance measurement indices for simulated construction operations , 2001 .
[50] John Christian,et al. Earthmoving cost optimization by operational research , 1988 .
[51] Chun-Hung Chen,et al. An EÅcient Approach Integrating Genetic Algorithm, Linear Programming, and Ordinal Optimization for Linear Mixed Integer Programming Problems , 2001 .
[52] W. Edward Back,et al. PROBABILISTIC FORECASTING OF PROJECT PERFORMANCE USING STOCHASTIC S CURVES , 2004 .
[53] Mingyuan Chen. A model for integrated production planning in cellular manufacturing systems , 2001 .
[54] Daniel W. Halpin,et al. Design of construction and process operations , 1976 .
[55] Ronie Navon,et al. A concept proving prototype of automated earthmoving control , 2004 .
[56] Osama Moselhi,et al. Optimization of Earthmoving Operations in Heavy Civil Engineering Projects , 2009 .
[57] Brenda McCabe,et al. Belief networks in construction simulation , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[58] Ronie Navon,et al. Automated project performance control of construction projects , 2005 .
[59] Min-Yuan Cheng,et al. Integrating barcode and GIS for monitoring construction progress , 2002 .
[60] L. F. R. Reis,et al. Water Supply Reservoir Operation by Combined Genetic Algorithm – Linear Programming (GA-LP) Approach , 2006 .
[61] Daniel W. Halpin,et al. Planning and analysis of construction operations , 1992 .
[62] Simaan M. AbouRizk,et al. Application Framework for Development of Simulation Tools , 2000 .
[63] Osama Moselhi,et al. Optimizing earthmoving operations using object-oriented simulation , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).
[64] David J. Edwards,et al. ESTIVATE: a model for calculating excavator productivity and output costs , 2000 .
[65] Joseph H. M. Tah,et al. Genetic algorithms application and testing for equipment selection , 1999 .
[66] Govindan Kannan,et al. DEVELOPMENT OF AN EXPERIENCE DATABASE FOR TRUCK LOADING OPERATIONS , 2000 .
[67] Amr A. Oloufa,et al. A GIS-based system for tracking pavement compaction☆ , 1996 .
[68] V. K. Handa,et al. Linear scheduling using optimal control theory , 1986 .
[69] Mohamed Al-Hussein,et al. A COMPUTER MODEL FOR SELECTING EQUIPMENT FOR EARTHMOVING OPERATIONS USING QUEUING THEORY , 2003 .
[70] Sabah Alkass,et al. EXPERT SYSTEM FOR EARTHMOVING EQUIPMENT SELECTION IN ROAD CONSTRUCTION , 1988 .
[71] Osama Moselhi,et al. Crew optimization in planning and control of earthmoving operations using spatial technologies , 2007, J. Inf. Technol. Constr..
[72] Govindan Kannan. A Methodology for the Development of a Production Experience Database for Earthmoving Operations Using Automated Data Collection , 1999 .
[73] Raja R. A. Issa,et al. Management’s Perception of Key Performance Indicators for Construction , 2003 .
[74] Ahmed Hassanein,et al. Planning and scheduling highway construction using GIS and dynamic programming , 2002 .
[75] Tarek Hegazy,et al. Resource Optimization Using Combined Simulation and Genetic Algorithms , 2003 .
[76] Cliff Schexnayder,et al. Effect of truck payload weight on production , 1999 .
[77] Simon Smith,et al. Earthmoving productivity estimation using linear regression techniques , 1999 .