Connectionist approaches for solver selection in constrained project scheduling
暂无分享,去创建一个
Rema Padman | Dan Zhu | Dan Zhu | R. Padman
[1] Calyampudi R. Rao. The use and interpretation of principal component analysis in applied research , 1964 .
[2] James E. Kelley,et al. Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .
[3] David Kendrick,et al. GAMS, a user's guide , 1988, SGNM.
[4] Rema Padman,et al. Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach , 1993 .
[5] Melody Y. Kiang,et al. Managerial Applications of Neural Networks: The Case of Bank Failure Predictions , 1992 .
[6] Paul Juell,et al. Neural Networks for Selective Vehicle Routing Heuristics , 1990, INFORMS J. Comput..
[7] Michael J. Prietula,et al. When Processes Learn: Steps Toward Crafting an Intelligent Organization , 1997, Inf. Syst. Res..
[8] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[9] Rema Padman,et al. Heuristic scheduling of resource‐constrained projects with cash flows , 1997 .
[10] Edward W. Davis,et al. Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .
[11] Rema Padman. Choosing Solvers in Decision Support Systems: A Neural Network Application in Resource-Constrained Project Scheduling , 1993 .
[12] E. Oja. Simplified neuron model as a principal component analyzer , 1982, Journal of mathematical biology.
[13] Teuvo Kohonen,et al. Self-Organization and Associative Memory, Third Edition , 1989, Springer Series in Information Sciences.
[14] Kurt Hornik,et al. Multilayer feedforward networks are universal approximators , 1989, Neural Networks.
[15] A. H. Russell. Cash Flows in Networks , 1970 .
[16] James E. Kelley,et al. Critical-Path Planning and Scheduling , 1899 .
[17] Scott E. Fahlman,et al. An empirical study of learning speed in back-propagation networks , 1988 .
[18] Robert A. Russell,et al. A comparison of heuristics for scheduling projects with cash flows and resource restrictions , 1986 .
[19] Rema Padman,et al. Neural Networks for Heuristic Selection: An Application in Resource-Constrained Project Scheduling , 1995 .
[20] James L. McClelland,et al. Parallel distributed processing: explorations in the microstructure of cognition, vol. 1: foundations , 1986 .
[21] Richard A. Johnson,et al. Applied Multivariate Statistical Analysis , 1983 .
[22] I. Kurtulus,et al. Multi-Project Scheduling: Categorization of Heuristic Rules Performance , 1982 .
[23] James H. Patterson,et al. Project scheduling: The effects of problem structure on heuristic performance , 1976 .
[24] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .