AN ITERATIVE GROUP-BASED SIGNAL OPTIMIZATION SCHEME FOR TRAFFIC EQUILIBRIUM NETWORKS
暂无分享,去创建一个
[1] J. Wardrop. ROAD PAPER. SOME THEORETICAL ASPECTS OF ROAD TRAFFIC RESEARCH. , 1952 .
[2] L G Willumsen,et al. SATURN - A SIMULATION-ASSIGNMENT MODEL FOR THE EVALUATION OF TRAFFIC MANAGEMENT SCHEMES , 1980 .
[3] Shing Chung Josh Wong. Group-based optimisation of signal timings using parallel computing , 1997 .
[4] R. Jayakrishnan,et al. A FASTER PATH-BASED ALGORITHM FOR TRAFFIC ASSIGNMENT , 1994 .
[5] J. van Leersum. Implementation of an advisory speed algorithm in TRANSYT , 1985 .
[6] M G Bell,et al. Path flow estimation and traffic system management , 1997 .
[7] Benjamin Heydecker,et al. Some Consequences of Detailed Junction Modeling in Road Traffic Assignment , 1983 .
[8] Hong Kam Lo. A Path-Based Traffic Assignment Formulation , 1998 .
[9] Larry J. LeBlanc,et al. AN EFFICIENT APPROACH TO SOLVING THE ROAD NETWORK EQUILIBRIUM TRAFFIC ASSIGNMENT PROBLEM. IN: THE AUTOMOBILE , 1975 .
[10] J. G. Wardrop,et al. Some Theoretical Aspects of Road Traffic Research , 1952 .
[11] B G Heydecker,et al. CALCULATION OF SIGNAL SETTINGS TO MINIMISE DELAY AT A JUNCTION , 1987 .
[12] E. Cascetta,et al. STOCHASTIC USER EQUILIBRIUM ASSIGNMENT WITH EXPLICIT PATH ENUMERATION: COMPARISON OF MODELS AND ALGORITHMS , 1997 .
[13] Benjamin Heydecker,et al. Optimising the control performance of traffic signals at a single junction , 1988 .
[14] Shing Chung Josh Wong,et al. Group-based optimisation of signal timings using the TRANSYT traffic model , 1996 .
[15] Shing Chung Josh Wong,et al. Derivatives of the performance index for the traffic model from TRANSYT , 1995 .