Lot size effects on process lead time, lead time demand, and safety stock
暂无分享,去创建一个
[1] Moncer Hariga,et al. Setup cost reduction in (Q, r) policy with lot size, setup time and lead-time interactions , 2000, J. Oper. Res. Soc..
[2] Y. Gerchak,et al. Continuous Review Inventory Models Where Random Lead Time Depends on Lot Size and Reserved Capacity , 2000 .
[3] Roelof Kuik,et al. Analysis of expected queueing delays for decision making in production planning , 1998, Eur. J. Oper. Res..
[4] S. Subba Rao,et al. The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis , 1992 .
[5] Uday S. Karmarkar,et al. Multi-item batching heuristics for minimization of queueing delays , 1992 .
[6] S. Rajagopalan,et al. Make to Order or Make to Stock: Model and Application , 2002, Manag. Sci..
[7] Roelof Kuik,et al. Lead-time variability in a homogeneous queueing model of batching , 1999 .
[8] Roelof Kuik,et al. Expected time in system analysis of a single-machine multi-item processing center , 2004, Eur. J. Oper. Res..
[9] Uday S. Karmarkar,et al. Lot Sizes, Lead Times and In-Process Inventories , 1987 .
[10] Timo Pirttilä,et al. An overview of the state and problems of inventory management in Finland , 1992 .
[11] Roelof Kuik,et al. An exploration of models that minimize leadtime through batching of arrived orders , 1996 .
[12] U. Karmarkar,et al. Lotsizing in Multi-Item Multi- Machine Job Shops , 1985 .