Abstract History matching is the process of updating a petroleum reservoir model using its production history. It is a required step before a model is accepted for forecasting production. This work aims at integrating response surface modeling with a genetic algorithm to realize a global optimization method for the history matching process. To achieve this, a proxy model was constructed for the flow simulator outputs for all measurements that enter a global objective function. A genetic algorithm was applied to minimize the proxy model. Then a reservoir model was built based on this minimized proxy model. Construction of a good proxy model requires only a limited number of simulation runs and its simulation time is a couple of seconds. Therefore, the evolution of proxy model using a genetic algorithm takes a short time. Compared to other global optimization techniques, this method can perform the history matching process in a quick, low-cost manner. The method was validated by a field case study. The simulation model used contains 41 years of production history. During the history matching process, a limited number of simulation runs (79) was used to construct a high-quality proxy model and by application of genetic algorithm, the global objective function was reduced from 581.362 to 9.347. The observed oil rate, shut-in pressure, repeated formation test pressure, and water cut (must be zero) were matched using the proposed method.
[1]
Xian-Huan Wen,et al.
Coupling Sequential-Self calibration and Genetic Algorithms to Integrate Production Data in Geostatistical Reservoir Modeling
,
2005
.
[2]
F. Anterion,et al.
Use of Parameter Gradients for Reservoir History Matching
,
1989
.
[3]
Olivier Gosselin,et al.
Gradient-Based History Matching With a Global Optimization Method
,
2001
.
[4]
John H. Holland,et al.
Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence
,
1992
.
[5]
Ahmed Ouenes,et al.
A New, Fast Parallel Simulated Annealing Algorithm for Reservoir Characterization
,
1993
.
[6]
J. P. Dejean,et al.
Managing Uncertainties on Production Predictions Using Integrated Statistical Methods
,
1999
.
[7]
John Killough,et al.
History Matching Using the Method of Gradients: Two Case Studies
,
1994
.
[8]
André I. Khuri,et al.
Response surface methodology
,
2010
.