Mohr-Coulomb and Hardening Soil Model Comparison of the Settlement of an Embankment Dam

In this study, numerical analysis of an embankment dam was carried out to predict settlement behavior with the use of the Mohr-Coulomb Model (MCM) and of the Hardening Soil Model (HSM). The MCM was applied to all material zones of the dam and the HSM was used for four major material zones that occupied significant volume. The settlement response of the dam was similar for MCM and HSM for three material zones (clay core, sandy gravel and random fill), each having a modulus of elasticity (MOE) in the range of 25000 to 50000kPa. However, it was found that after the end of the construction, the MCM showed about 57% and 50% more settlement as compared to HSM when MOE of sandy siltstone varied from 70000 to 125000kPa respectively. The results regarding the dam settlement predicted with the HSM are in agreement with the findings in previous studies.

[1]  Sven Knutsson,et al.  Comparison of three dimensional and two dimensional axisymmetric finite element analyses of a corner section of a tailings dam , 2017 .

[2]  M. Carter,et al.  Soil Properties and their Correlations , 2016 .

[3]  Cheng Jing,et al.  Stability of Slope and Seepage Analysis in Earth Dam Using Numerical Finite Element Model , 2013 .

[4]  OrmannLinda,et al.  Numerical analysis of strengthening by rockfill embankments on an upstream tailings dam , 2013 .

[5]  R. Boes,et al.  Dams and Reservoirs under Changing Challenges , 2011 .

[6]  Mirali Mohammadi,et al.  The Effect of Impervious Clay Core Shape on the Stability of Embankment Dams , 2011 .

[7]  F. Silvestri,et al.  Stability analysis of slopes in soils with strain-softening behaviour , 2010 .

[8]  Burt G. Look,et al.  Handbook of geotechnical investigation and design tables , 2007 .

[9]  J. M. Duncan,et al.  Soil Strength and Slope Stability , 2005 .

[10]  Martin N. Sara,et al.  Site Assessment and Remediation Handbook , 2003 .

[11]  G. Barnes Soil Mechanics: Principles and Practice , 1995 .

[12]  Robert B. Jansen,et al.  Advanced Dam Engineering for Design, Construction, and Rehabilitation , 1988 .

[13]  J. Saura,et al.  Three‐dimensional analysis of Infiernillo dam during construction and filling of the reservoir , 1983 .

[14]  D. Deere,et al.  Engineering classification and index properties for intact rock , 1966 .

[15]  Min Tang,et al.  Modelling the construction of a high embankment dam , 2014 .

[16]  Warat Kongkitkul,et al.  Evaluation of hardening soil model on numerical simulation of behaviors of high rockfill dams , 2011 .

[17]  Ruwan Rajapakse,et al.  Geotechnical engineering calculations and rules of thumb , 2008 .

[18]  H. Dines ‘Soil’ Mechanics , 1944, Nature.