Wide area monitoring and control as a tool for mitigation of cascading failures
暂无分享,去创建一个
[1] Wenyuan Li,et al. Reliability Assessment of Electric Power Systems Using Monte Carlo Methods , 1994 .
[2] Mohammad Shahidehpour,et al. The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .
[3] Daniel S. Kirschen,et al. Consideration of Hidden Failures in Security Analysis , 2002 .
[4] Chan-Nan Lu,et al. DEFENSE PLAN DESIGN IN A LONGITUDINAL POWER SYSTEM , 2002 .
[5] Chen-Ching Liu,et al. AN INTELLIGENT ADAPTIVE LOAD SHEDDING SCHEME , 2002 .
[6] Ian Dobson,et al. A probabilistic loading-dependent model of cascading failure and possible implications for blackouts , 2003, 36th Annual Hawaii International Conference on System Sciences, 2003. Proceedings of the.
[7] Goran Andersson,et al. Stability assessment and emergency control method using trajectory sensitivities , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.