Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops
暂无分享,去创建一个
[1] S. Reiter. A System for Managing Job-Shop Production , 1966 .
[2] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[3] F. Robert Jacobs,et al. REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .
[4] Chris N. Potts,et al. Flow shop scheduling with lot streaming , 1989 .
[5] David F. Pyke,et al. Solution Procedures for the Lot‐Streaming Problem , 1990 .
[6] R. G. Vickson,et al. Two- and three-machine flow shop scheduling problems with equal sized transfer batches , 1992 .
[7] D. Chaudhuri,et al. A multi-stage parallel-processor flowshop problem with minimum flowtime , 1992 .
[8] Stéphane Dauzère-Pérès,et al. An iterative procedure for lot streaming in job-shop scheduling , 1993 .
[9] Michael J. Shaw,et al. Joint Lot Sizing and Sequencing with Genetic Algorithms for Scheduling: Evolving the Chromosome Structure , 1993, ICGA.
[10] Kenneth R. Baker,et al. A comparative study of lot streaming procedures , 1993 .
[11] G. Steiner,et al. BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST , 1993 .
[12] Kenneth R. Baker,et al. Basic Techniques for Lot Streaming , 1993, Oper. Res..
[13] Ferda Can Çetinkaya,et al. Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated , 1994 .
[14] Chris N. Potts,et al. Lot streaming in three-stage production processes , 1994 .
[15] R. Vickson. Optimal lot streaming for multiple products in a two-machine flow shop , 1995 .
[16] Kenneth R. Baker,et al. Lot streaming in the two-machine flow shop with setup times , 1995, Ann. Oper. Res..
[17] Hitoshi Tsubone,et al. The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop , 1996 .
[18] Stéphane Dauzère-Pérès,et al. Lot Streaming in Job-Shop Scheduling , 1997, Oper. Res..
[19] George Steiner,et al. Approximation methods for discrete lot streaming in flow shops , 1997, Oper. Res. Lett..
[20] Jiang Chen,et al. Lot streaming with attached setups in three-machine flow shops , 1997 .
[21] Alper Sen,et al. Lot streaming in open shops , 1998, Oper. Res. Lett..
[22] Alper Sen,et al. Optimal streaming of a single job in a two-stage flow shop , 1998, Eur. J. Oper. Res..
[23] C. Sriskandarajah,et al. Lot streaming and scheduling multiple products in two-machine no-wait flowshops , 1999 .
[24] Subhash C. Sarin,et al. Evaluation of the potential benefits of lot streaming in flow-shop systems , 2000 .
[25] Jiyin Liu,et al. Constructive and composite heuristic solutions to the P// Sigma Ci scheduling problem , 2001, Eur. J. Oper. Res..
[26] Peter B. Luh,et al. Steel-making process scheduling using Lagrangian relaxation , 2002 .