Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops

[1]  S. Reiter A System for Managing Job-Shop Production , 1966 .

[2]  Ravi Sethi,et al.  The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..

[3]  F. Robert Jacobs,et al.  REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .

[4]  Chris N. Potts,et al.  Flow shop scheduling with lot streaming , 1989 .

[5]  David F. Pyke,et al.  Solution Procedures for the Lot‐Streaming Problem , 1990 .

[6]  R. G. Vickson,et al.  Two- and three-machine flow shop scheduling problems with equal sized transfer batches , 1992 .

[7]  D. Chaudhuri,et al.  A multi-stage parallel-processor flowshop problem with minimum flowtime , 1992 .

[8]  Stéphane Dauzère-Pérès,et al.  An iterative procedure for lot streaming in job-shop scheduling , 1993 .

[9]  Michael J. Shaw,et al.  Joint Lot Sizing and Sequencing with Genetic Algorithms for Scheduling: Evolving the Chromosome Structure , 1993, ICGA.

[10]  Kenneth R. Baker,et al.  A comparative study of lot streaming procedures , 1993 .

[11]  G. Steiner,et al.  BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST , 1993 .

[12]  Kenneth R. Baker,et al.  Basic Techniques for Lot Streaming , 1993, Oper. Res..

[13]  Ferda Can Çetinkaya,et al.  Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated , 1994 .

[14]  Chris N. Potts,et al.  Lot streaming in three-stage production processes , 1994 .

[15]  R. Vickson Optimal lot streaming for multiple products in a two-machine flow shop , 1995 .

[16]  Kenneth R. Baker,et al.  Lot streaming in the two-machine flow shop with setup times , 1995, Ann. Oper. Res..

[17]  Hitoshi Tsubone,et al.  The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop , 1996 .

[18]  Stéphane Dauzère-Pérès,et al.  Lot Streaming in Job-Shop Scheduling , 1997, Oper. Res..

[19]  George Steiner,et al.  Approximation methods for discrete lot streaming in flow shops , 1997, Oper. Res. Lett..

[20]  Jiang Chen,et al.  Lot streaming with attached setups in three-machine flow shops , 1997 .

[21]  Alper Sen,et al.  Lot streaming in open shops , 1998, Oper. Res. Lett..

[22]  Alper Sen,et al.  Optimal streaming of a single job in a two-stage flow shop , 1998, Eur. J. Oper. Res..

[23]  C. Sriskandarajah,et al.  Lot streaming and scheduling multiple products in two-machine no-wait flowshops , 1999 .

[24]  Subhash C. Sarin,et al.  Evaluation of the potential benefits of lot streaming in flow-shop systems , 2000 .

[25]  Jiyin Liu,et al.  Constructive and composite heuristic solutions to the P// Sigma Ci scheduling problem , 2001, Eur. J. Oper. Res..

[26]  Peter B. Luh,et al.  Steel-making process scheduling using Lagrangian relaxation , 2002 .