A cognitive typology of scheduling situations: a contribution to laboratory and field studies
暂无分享,去创建一个
[1] Kenneth N. McKay,et al. Planning, scheduling and dispatching tasks in production control , 2003, Cognition, Technology & Work.
[2] Peter G. Higgins,et al. Job Shop Scheduling: Hybrid Intelligent Human-Computer Paradigm , 2000 .
[3] H. T. Smith,et al. Interactive Planning: A Study of Computer Aiding in the Execution of a Simulated Scheduling Task , 1975, Int. J. Man Mach. Stud..
[4] E. Salas,et al. Linking Expertise and Naturalistic Decision Making , 2001 .
[5] Michael Lewis,et al. Operator performance at network scheduling with dynamic pricing and limited capacities , 1995, 1995 IEEE International Conference on Systems, Man and Cybernetics. Intelligent Systems for the 21st Century.
[6] K. Mosier,et al. Human Decision Makers and Automated Decision Aids: Made for Each Other? , 1996 .
[7] Patrick Esquirol,et al. SUPPORTING COOPERATION AND CONSTRAINTS NEGOTIATION BETWEEN TIME AND RESOURCE MANAGERS , 2007 .
[8] E. Salas,et al. Taking stock of naturalistic decision making , 2001 .
[9] Jc Jan Fransoo,et al. A Typology of Production Control Situations in Process Industries , 1994 .
[10] Colin L. Moodie,et al. An investigation of the advantages of using a man-computer interactive scheduling methodology for job shops , 1981 .
[11] J M Hoc,et al. From human – machine interaction to human – machine cooperation , 2000, Ergonomics.
[12] W. V. Wezel,et al. Planners and their cognitive maps: an analysis of domain representations using multi dimensional scaling. , 2005, Applied ergonomics.
[13] Reha Uzsoy,et al. Measuring the Quality of Manufacturing Schedules , 1995 .
[14] Yves Crama,et al. A discussion of production planning approaches in the process industry , 2001 .
[15] Peter G. Higgins,et al. Architecture and interface aspects of scheduling decision support , 2001 .
[16] Kenneth N. McKay,et al. Task allocation: human computer interaction in intelligent scheduling , 1996 .
[17] Gavriel Salvendy,et al. Toward a hybrid intelligent system for scheduling and rescheduling of FMS , 1988 .
[18] Kenneth N. McKay,et al. An information systems based paradigm for decisions in rapidly changing industries , 1995 .
[19] Vcs Vincent Wiers,et al. From anecdotes to theory: a review of existing knowledge on human factors of planning and scheduling , 2001 .
[20] R. Lipshitz,et al. Coping with Uncertainty: A Naturalistic Decision-Making Analysis , 1997 .
[21] Jannes Slomp. Human performance in planning and scheduling: fieldwork studies , 2001 .
[22] Martina Berglund,et al. Schedulers’ work content – a quantified analysis , 2006 .
[23] Fred D. Davis,et al. Determinants of Decision Rule Use in a Production Planning Task , 1995 .
[24] Damien Trentesaux,et al. Integration of the human operator into responsive discrete production management systems , 1998, Eur. J. Oper. Res..
[25] Stephen F. Smith,et al. ISIS—a knowledge‐based system for factory scheduling , 1984 .
[26] Jiyin Liu,et al. The classification of FMS scheduling problems , 1996 .
[27] Élisabeth Deshayes,et al. Jean-Marie Cellier, Véronique De Keyser, Claude Valot (Dirs.), La gestion du temps dans les environnements dynamiques, Paris, Presses universitaires de France, (Le travail humain), 1996 , 1997 .
[28] J. Rasmussen,et al. A taxonomy for analysis of cognitive work , 1992, Conference Record for 1992 Fifth Conference on Human Factors and Power Plants.
[29] C D Wickens,et al. Mental workload and cognitive task automaticity: an evaluation of subjective and time estimation metrics. , 1994, Ergonomics.
[30] J. R. Wilson,et al. Human performance in planning and scheduling: fieldwork studies , 2001 .
[31] Robin Lane,et al. Solving problems in production scheduling , 1995 .
[32] Kjeld Schmidt,et al. Taxonomy for Cognitive Work Analysis , 1990 .
[33] S. Gershwin,et al. Research needs in manufacturing systems , 1985, IEEE Control Systems Magazine.
[34] J. Funke. Dynamic systems as tools for analysing human judgement , 2001 .
[35] John R. Wilson,et al. Human performance in industrial scheduling: A framework for understanding , 2001 .
[36] A. Calinescu,et al. Dealing with Uncertainty in Manufacturing: The Impact on Scheduling , 1997 .
[37] Gavriel Salvendy,et al. Analytical modeling and experimental study of human workload in scheduling of advanced manufacturing systems , 1994 .
[38] Sheue-Ling Hwang,et al. Management Strategies for the Design, Control and Operation of Flexible Manufacturing Systems , 1983 .
[39] David B. Kaber,et al. Establishing information requirements for supervisory controllers in a flexible manufacturing system using GTA , 2000 .
[40] Penelope M. Sanderson,et al. Towards the model human scheduler , 1991 .
[41] Vcs Vincent Wiers. Human-computer interaction in production scheduling : analysis and design of decision support systems for production scheduling tasks , 1997 .
[42] Kenneth N. McKay,et al. Job-Shop Scheduling Theory: What Is Relevant? , 1988 .
[43] Ravi S. Adapathya,et al. Strategic Behavior, Workload, and Performance in Task Scheduling , 1991 .
[44] Jean-Michel Hoc,et al. Some dimensions of a cognitive typology of process control situations , 1993 .
[45] T W van der Schaaf. Developing and using cognitive task typologies. , 1993, Ergonomics.
[46] Gavriel Salvendy,et al. A real-time interactive computer model of a flexible manufacturing system , 1987 .
[47] A. G. Lagodimos,et al. Computer-aided packing shop scheduling in a manufacturing plant , 1996 .
[48] E. N. Corlett,et al. WORK SAMPLING USING EXTENDED OBSERVATIONS , 1965 .
[49] Thomas B. Sheridan,et al. Dynamic Decisions and Work Load in Multitask Supervisory Control , 1980, IEEE Transactions on Systems, Man, and Cybernetics.
[50] Bart L. MacCarthy,et al. Investigating the Work of Industrial Schedulers through Field Study , 1999, Cognition, Technology & Work.
[51] Gavriel Salvendy,et al. Knowledge elicitation in scheduling FMS: Towards a hybrid intelligent system☆ , 1990 .
[52] Yili Liu,et al. Monitoring Behavior in Manual and Automated Scheduling Systems , 1993, Int. J. Man Mach. Stud..
[53] Richard Gibson,et al. The Presentation of Information to the Job-Shop Scheduler , 1978 .
[54] Jiyin Liu,et al. A new classification scheme for flexible manufacturing systems , 1993 .
[55] Bart L. MacCarthy,et al. Human performance in planning and scheduling , 2001 .
[56] Neville Moray,et al. Taxonomy of Scheduling Systems as a Basis for the Study of Strategic Behavior , 1995, Hum. Factors.
[57] Peter G. Higgins,et al. INTERACTION IN HYBRID INTELLIGENT SCHEDULING , 1996 .
[58] Vincent C. S. Wiers,et al. A quantitative field study of the decision behaviour of four shopfloor schedulers , 1996 .
[60] Christine M. Mitchell,et al. Design of an FMS operator workstation using the Rasmussen abstraction hierarchy , 1989, Conference Proceedings., IEEE International Conference on Systems, Man and Cybernetics.
[61] Sheue-Ling Hwang,et al. A Decision Support System for Production Scheduling and Control , 1997, HCI.
[62] Kenneth N. McKay,et al. Schedulers & Planners: What and How Can We Learn From Them , 1995 .
[63] J. Hoc,et al. L'assistance à l'opérateur humain pour l'ordonnancement dans les ateliers manufacturiers , 2004 .
[64] Eva L. Baker,et al. Assessing problem solving in expert systems using human benchmarking , 2002, Comput. Hum. Behav..
[65] W. Kowalczyk,et al. An intelligent interactive project management support system , 1995 .
[66] Reha Uzsoy,et al. Predictable scheduling of a single machine with breakdowns and sensitive jobs , 1999 .
[67] T. J. Grant,et al. Lessons for O.R. from A.I.: A Scheduling Case Study , 1986 .
[68] Vcs Vincent Wiers,et al. A review of the applicability of OR and AI scheduling techniques in practice , 1997 .
[69] J. Quesada *,et al. Complex problem-solving: a field in search of a definition? , 2005 .
[70] T. W. van der Schaaf. Developing and using cognitive task typologies , 1993 .
[71] Saralees Nadarajah,et al. Letter to the editor , 2007, Int. Trans. Oper. Res..
[72] Vcs Vincent Wiers,et al. A framework for decision support in production scheduling tasks , 1997 .
[73] Peter Cowling. CHAPTER ELEVEN Design and Implementation of an Effective Decision Support System : A Case Study in Steel Hot Rolling Mill Scheduling , 2009 .
[74] Colin L. Moodie,et al. Knowledge based routing and sequencing for discrete part production , 1987 .
[75] K. E. Thurley,et al. THE SUPERVISOR'S ROLE IN PRODUCTION CONTROL , 1961 .
[76] Jean-Michel Hoc,et al. Towards ecological validity of research in cognitive ergonomics , 2001 .
[77] Thomas B. Sheridan. Task Allocation and Supervisory Control , 1988 .
[78] John R. Wilson,et al. A New Model of Scheduling in Manufacturing: Tasks, Roles, and Monitoring , 2004, Hum. Factors.
[79] Penelope M. Sanderson,et al. The Human Planning and Scheduling Role in Advanced Manufacturing Systems: An Emerging Human Factors Domain , 1989 .
[80] Kenneth N. McKay,et al. Decision support for production scheduling tasks in shops with much uncertainty and little autonomous flexibility , 2001 .
[81] Mark Stefik,et al. Planning with Constraints (MOLGEN: Part 1) , 1981, Artif. Intell..
[82] Jens Rasmussen,et al. Cognitive Systems Engineering , 2022 .
[83] Jean-Michel Hoc,et al. Strategies in Controlling a Continuous Process with Long Response Latencies: Needs for Computer Support to Diagnosis , 1989, Int. J. Man Mach. Stud..