Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis

Upon the completion of national road projects, their cost and time deviations are often reported. These deviations from the projected values are a result of complications in the time and cost management of such projects. Controlling the cost and time overrun of projects is important for successful implementation and efficient project management. However, few studies have attempted to measure the project cost and time management efficiency in civil engineering. Thus, this issue requires further investigation. In this study, large road projects that had poor cost and time management were selected. The chosen projects were configured as Decision Making Units (DMUs) in a Data Envelopment Analysis (DEA). DEA is a non-parametric modern mathematical tool for measuring relative managerial performance and determining efficient DMUs. A list containing the causes of cost and time deviations and the percentage deviation for each DMU was prepared. The cost and time management efficiency of the DMUs was calculated using DEA, and the resulting values were ordered according to importance. It is believed that this process will contribute to better cost and time management.

[1]  B. Hobbs,et al.  The Perceived Value and Potential Contribution of Project Management Practices to Project Success , 2006 .

[2]  Jonas Eliasson,et al.  Cost overruns and demand shortfalls – Deception or selection? , 2013 .

[3]  Indra Gunawan,et al.  Analysis of cost and schedule performance of international development projects , 2010 .

[4]  A. Charnes,et al.  Some Models for Estimating Technical and Scale Inefficiencies in Data Envelopment Analysis , 1984 .

[5]  Rodney Turner,et al.  The Relationship between Project Success and Project Efficiency , 2015 .

[6]  Søren L. Buhl,et al.  How common and how large are cost overruns in transport infrastructure projects? , 2003 .

[7]  A. U.S.,et al.  Measuring the efficiency of decision making units , 2003 .

[8]  Marly Monteiro de Carvalho,et al.  Project management and its effects on project success: Cross-country and cross-industry comparisons , 2015 .

[9]  Sahand Daneshvar,et al.  Sensitivity analysis on modified variable returns to scale model in Data Envelopment Analysis using facet analysis , 2014, Comput. Ind. Eng..

[10]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[11]  Intan Rohani Endut,et al.  Cost overrun in the Malaysian construction industry projects: A deeper insight , 2014 .

[12]  Khalied Hyari,et al.  Utilizing data envelopment analysis to benchmark safety performance of construction contractors , 2010 .

[13]  Peter E.D. Love,et al.  Overruns in transportation infrastructure projects , 2014 .

[14]  Tyrone T. Lin,et al.  Application of Data Envelopment Analysis on the Indicators Contributing to Learning and Teaching Performance , 2012 .

[15]  David Arditi,et al.  Cost overruns in public projects , 1985 .

[16]  Ying-Mei Cheng,et al.  An exploration into cost-influencing factors on construction projects , 2014 .

[17]  Abdulkadir Mohamud Dahie,et al.  The Role of Project Management in Achieving Project Success: Empirical Study from Local NGOs in Mogadishu-Somalia , 2017 .

[18]  A. K. Munns,et al.  The role of project management in achieving project success , 1996 .

[19]  Keith R. Molenaar,et al.  Construction Project Cost Escalation Factors , 2009 .

[20]  Linda K Owens Secondary data analysis. , 1995, Bulletin of the World Health Organization.

[21]  William W. Cooper,et al.  Introduction to Data Envelopment Analysis and Its Uses: With Dea-Solver Software and References , 2005 .

[22]  R. Müller,et al.  Relationships Between a Project Management Methodology and Project Success in Different Project Governance Contexts , 2015, Project Management Methodologies, Governance and Success.

[23]  K. Chandrashekhar Iyer,et al.  Measuring and benchmarking managerial efficiency of project execution schedule performance , 2016 .

[24]  Anjan V. Thakor,et al.  Handbook of Financial Intermediation and Banking , 2008 .

[25]  Loretta J. Mester Applying Efficiency Measurement Techniques to Central Banks , 2003 .

[26]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[27]  Jui-Sheng Chou,et al.  Project Management Knowledge and Effects on Construction Project Outcomes: An Empirical Study , 2012 .

[28]  J. O'Neill,et al.  Project management. , 2001, Health management technology.