Time-varying Risks of Construction Projects☆

Abstract Although risk management has become an integral part of project management generally insomuch that its application is required even by standards, it is usually left to project managers to define the required processes in detail and only little relevant methodological literature is available to provide further theoretical content. Known practices can still be developed in many parts, since in current approaches it is especially difficult to reflect on e.g. a phenomenon that individual risks typically decline and then disappear as construction progresses. This article focuses on declining and disappearing risk changing with time, based on value-based risk monitoring. For providing the mathematical background of time-varying risks, it is important to detect and monitor risks related to the added value of the project. Consequently, if necessary, it is possible to start action plans to avoid losses. In a construction project, in order to maintain a value-based risk management process, a continuous valuation method is necessary which is able to capture the value of the building in its current state. Our aim is twofold: to develop an evaluation method, which is able to determine the current market value of a project in the construction phase, and to provide a risk monitoring tool, which reflects the phenomenon of time-varying risks.

[1]  Adolfo López-Paredes,et al.  An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index , 2011 .

[2]  Amir Salehipour,et al.  Evaluating fuzzy earned value indices and estimates by applying alpha cuts , 2011, Expert Syst. Appl..

[3]  Ren-Jye Dzeng,et al.  A study of ontology-based risk management framework of construction projects through project life cycle , 2009 .

[4]  Zoltán Sebestyén,et al.  Integrated Risk Management Process for Building Projects , 2014 .

[5]  Öncü Hazır A review of analytical models, approaches and decision support tools in project monitoring and control , 2015 .

[6]  Miklós Hajdu Effects of the application of activity calendars on the distribution of project duration in PERT networks , 2013 .

[7]  Matthias Beck,et al.  Obstacles to the Evolution of Risk Management as a Discipline: Some Tentative Thoughts , 2004 .

[8]  José Manuel Galán,et al.  A new approach for project control under uncertainty. Going back to the basics , 2014 .

[9]  Seyed Bagher Hosseini,et al.  Risk assessment model selection in construction industry , 2011, Expert Syst. Appl..

[10]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[11]  Constanta-Nicoleta Bodea,et al.  Considerations on Project Quantitative Risk Analysis , 2013 .

[12]  Mario Vanhoucke,et al.  Construction and evaluation framework for a real-life project database , 2015 .