What Causes Cost Overrun in Transport Infrastructure Projects?

Results from the first statistically significant study of the causes of cost escalation in transport infrastructure projects are presented. The study is based on a sample of 258 rail, bridge, tunnel and road projects worth US$90 billion. The focus is on the dependence of cost escalation on: (1) the length of the project‐implementation phase, (2) the size of the project and (3) the type of project ownership. First, it was found, with very high statistical significance, that cost escalation was strongly dependent on the length of the implementation phase. The policy implications are clear: decision‐makers and planners should be highly concerned about delays and long implementation phases because they translate into risks of substantial cost escalations. Second, projects have grown larger over time, and for bridges and tunnels larger projects have larger percentage cost escalations. Finally, by comparing the cost escalation for three types of project ownership—private, state‐owned enterprise and other public ownership—it was shown that the oft‐seen claim that public ownership is problematic and private ownership effective in curbing cost escalation is an oversimplification. The type of accountability appears to matter more to cost escalation than type of ownership.

[1]  Nikolaos Zahariadis Megaprojects and Risk: An Anatomy of Ambition , 2004, Perspectives on Politics.

[2]  Søren L. Buhl,et al.  Cost Underestimation in Public Works Projects: Error or Lie? , 2004 .

[3]  B. Flyvbjerg,et al.  Megaprojects and Risk. An Anatomy of Ambition , 2003, 1303.7404.

[4]  Søren L. Buhl,et al.  How common and how large are cost overruns in transport infrastructure projects? , 2003 .

[5]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[6]  Werner Rothengatter,et al.  Big decisions, big risks: improving accountability in mega projects , 1998 .

[7]  R. Gilmour,et al.  Reinventing Government Accountability: Public Functions, Privatization, and the Meaning of "State Action" , 1998 .

[8]  Almut Oetjen Bailey, Elizabeth E. and Janet Rothenberg Pack (eds.) (1995). The Political Economy of Privatization and Deregulation , 1997 .

[9]  J. Weiss Down from bureaucracy: The ambiguity of privatization and empowerment , 1997 .

[10]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[11]  P. Seidenstat Privatization. Trends, Interplay of Forces, and Lessons Learned , 1996 .

[12]  John Preston,et al.  The economics of British rail privatization: an assessment , 1996 .

[13]  John G. Heilman,et al.  Privatization: Moving Beyond Laissez Faire , 1995 .

[14]  E. Bailey,et al.  The Political Economy of Privatization and Deregulation , 1995 .

[15]  Leonard Geron Privatization and regulatory change in Europe , 1995 .

[16]  John R. Meyer,et al.  Going Private: The International Experience with Transport Privatization , 1994 .

[17]  V. Wright Privatization in Western Europe: Pressures, Problems and Paradoxes , 1994 .

[18]  M. Moran,et al.  Privatization and Regulatory Change in Europe , 1994 .

[19]  C. Leman Privatization and the Welfare State , 1991 .

[20]  Peter W. G. Morris,et al.  The Anatomy of Major Projects: A Study of the Reality of Project Management , 1988 .

[21]  Barry Bozeman,et al.  Exploring the Limits of Public and Private Sectors: Sector Boundaries as Maginot Line , 1988 .

[22]  R. Moe Exploring the Limits of Privatization , 1987 .

[23]  Kate Ascher,et al.  The Politics of Privatisation: Contracting Out Public Services , 1987 .

[24]  S. Hanke Prospects for privatization , 1987 .

[25]  Carolyn Adams The Politics of Privatization , 1987 .

[26]  Peter W. G. Morris,et al.  The Anatomy of Major Projects , 1987 .

[27]  David Arditi,et al.  Cost overruns in public projects , 1985 .

[28]  Robert Haveman,et al.  Benefit-Cost and Policy Analysis: 1973. , 1976 .