FANPCE TECHNIQUE FOR RISK ASSESSMENT ON SUBWAY STATION CONSTRUCTION

[1]  Lukas Ferkl,et al.  Probabilistic risk assessment of highway tunnels , 2011 .

[2]  Said M. Easa,et al.  Evaluating Highway Traffic Safety: An Integrated Approach , 2018, Journal of Advanced Transportation.

[3]  Olegas Prentkovskis,et al.  Multi Criteria Evaluation Framework for Prioritizing Indian Railway Stations Using Modified Rough AHP-Mabac Method , 2018 .

[4]  D. Ma,et al.  In-Situ and Numerical Investigation of Groundwater Inrush Hazard from Grouted Karst Collapse Pillar in Longwall Mining , 2018, Water.

[5]  Edmundas Kazimieras Zavadskas,et al.  A Hybrid MCDM Technique for Risk Management in Construction Projects , 2018, Symmetry.

[6]  Huan-Ming Chuang,et al.  Improving Project Risk Management by a Hybrid MCDM Model Combining DEMATEL with DANP and VIKOR Methods—An Example of Cloud CRM , 2016 .

[7]  Samarjit Kar,et al.  Evaluation and selection of medical tourism sites: A rough analytic hierarchy process based multi‐attributive border approximation area comparison approach , 2016, Expert Syst. J. Knowl. Eng..

[8]  Norhazilan Md Noor,et al.  Hybrid SWARA-COPRAS method for risk assessment in deep foundation excavation project: an Iranian case study , 2017 .

[9]  Dubravka Bjegović,et al.  Design for durability including initiation and propagation period based on the fuzzy set theory , 2006 .

[10]  Zilong Zhou,et al.  Experimental Investigation on Hydraulic Properties of Granular Sandstone and Mudstone Mixtures , 2018 .

[11]  Osman Taylan,et al.  Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies , 2014, Appl. Soft Comput..

[12]  Hak-Keung Lam,et al.  A New Approach to Stability and Stabilization Analysis for Continuous-Time Takagi–Sugeno Fuzzy Systems With Time Delay , 2018, IEEE Transactions on Fuzzy Systems.

[13]  Mohammad Rezania,et al.  Variations of hydraulic properties of granular sandstones during water inrush : effect of small particle migration , 2017 .

[14]  Serdar Ulubeyli,et al.  Fuzzy multi-criteria decision making model for subcontractor selection in international construction projects , 2015 .

[15]  Laura Meade,et al.  A conceptual model for selecting and evaluating third‐party reverse logistics providers , 2002 .

[16]  T. Saaty Fundamentals of the analytic network process — Dependence and feedback in decision-making with a single network , 2004 .

[17]  Edmundas Kazimieras Zavadskas,et al.  Risk assessment of construction projects , 2010 .

[18]  Jing Li,et al.  Study on the quality of private university education based on analytic hierarchy process and fuzzy comprehensive evaluation method , 2016, J. Intell. Fuzzy Syst..

[19]  Ibrahim Mahamid,et al.  Risk matrix for factors affecting time delay in road construction projects: owners' perspective , 2011 .

[20]  Antônio Edésio Jungles,et al.  Risk Level Assessment in Construction Projects Using the Schedule Performance Index , 2016 .

[21]  Mohsen Ahmadi,et al.  Comprehensive Risk Management using Fuzzy FMEA and MCDA Techniques in Highway Construction Projects , 2016 .

[22]  Per Tengborg,et al.  Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2 , 2004 .

[23]  Shahrir Abdullah,et al.  Development of CNG direct injection (CNGDI) clean fuel system for extra power in small engine , 2012 .

[24]  Nguyen Thi Kim Son A foundation on semigroups of operators defined on the set of triangular fuzzy numbers and its application to fuzzy fractional evolution equations , 2018, Fuzzy Sets Syst..

[25]  Jurgita Antucheviciene,et al.  A Hybrid MCDM Approach for Strategic Project Portfolio Selection of Agro By-Products , 2017 .

[26]  Yao-Chen Kuo,et al.  Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects , 2013 .

[27]  Emrah Akyar,et al.  A New Method for Ranking triangular Fuzzy numbers , 2012, Int. J. Uncertain. Fuzziness Knowl. Based Syst..

[28]  Irem Dikmen,et al.  An analytic hierarchy process based model for risk and opportunity assessment of international construction projects , 2006 .

[29]  Samarjit Kar,et al.  Supplier selection in Telecom supply chain management: a Fuzzy-Rasch based COPRAS-G method , 2018 .

[30]  Long Chen,et al.  AHP-ANP–Fuzzy Integral Integrated Network for Evaluating Performance of Innovative Business Models for Sustainable Building , 2017 .

[31]  O. Bayazit Use of analytic network process in vendor selection decisions , 2006 .

[32]  İhsan Yüksel,et al.  A fuzzy analytic network process (ANP) model to identify faulty behavior risk (FBR) in work system , 2008 .

[33]  Zhang Yu,et al.  Risk assessment of water inrush in karst tunnels based on two-class fuzzy comprehensive evaluation method , 2017, Arabian Journal of Geosciences.

[34]  Madjid Tavana,et al.  A hybrid fuzzy group ANP-TOPSIS framework for assessment of e-government readiness from a CiRM perspective , 2013, Inf. Manag..

[35]  Zilong Zhou,et al.  The role of gangue on the mitigation of mining-induced hazards and environmental pollution: An experimental investigation. , 2019, The Science of the total environment.

[36]  Xibing Li,et al.  Modeling hard rock failure induced by structural planes around deep circular tunnels , 2019, Engineering Fracture Mechanics.

[37]  Xibing Li,et al.  Failure Characteristics of Granite Influenced by Sample Height-to-Width Ratios and Intermediate Principal Stress Under True-Triaxial Unloading Conditions , 2018, Rock Mechanics and Rock Engineering.

[38]  Irem Dikmen,et al.  Risk assessment of international construction projects using the analytic network process , 2009 .

[39]  E. Zavadskas,et al.  Multiple criteria construction management decisions considering relations between criteria , 2010 .

[40]  Philip Powell,et al.  Project Risk Analysis Based on Prototype Activities , 1994 .

[41]  Siamak Noori,et al.  An Integrated Methodology for Assessment and Selection of the Project Risk Response Actions , 2009, Risk analysis : an official publication of the Society for Risk Analysis.