Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation

Two key concepts in the production planning and control literature that incorporate an order release function are the Theory of Constraints, with its drum-buffer-rope release method, and Workload Control, with its load-based release methods. When order release is applied, jobs are not directly released to the shop floor – release is controlled to realize certain performance measures. The performance impacts of drum-buffer-rope and Workload Control order release have been assessed separately, but the two approaches have not been directly compared in one study. This is a major shortcoming that leaves practitioners without guidance on which release method to select. This study assesses the performance of drum-buffer-rope and Workload Control release in a pure job shop and a general flow shop with varying levels of bottleneck severity. Both bottleneck oriented and non-bottleneck oriented Workload Control release methods are included. Simulation results show that Workload Control release methods lead to better performance than drum-buffer-rope if bottleneck severity is low. But Workload Control, including its bottleneck oriented release methods, is outperformed by drum-buffer-rope if a strong bottleneck exists. Workload Control gains an advantage in balanced shops due to its unique load balancing function, which attempts to evenly distribute workloads across resources. But this becomes functionless when there is a strong bottleneck. Our sensitivity analysis suggests that the performance differences between release methods are not affected by routing characteristics or the proportion of jobs that visit the bottleneck.

[1]  S. T Enns,et al.  The effectiveness of input control based on aggregate versus bottleneck work loads , 2002 .

[2]  John H. Blackstone,et al.  The evolution of a management philosophy: The theory of constraints , 2007 .

[3]  Nuno O. Fernandes,et al.  Workload control in unbalanced job shops , 2014 .

[4]  Mauricio G. C. Resende,et al.  Closed-loop job release control for VLSI circuit manufacturing , 1988 .

[5]  Mark Stevenson,et al.  Continuous workload control order release revisited: an assessment by simulation , 2014 .

[6]  Joel D. Wisner,et al.  A review of the order release policy research , 1995 .

[7]  R. Cigolini,et al.  An experimental investigation on workload limiting methods within ORR policies in a job shop environment , 2002 .

[8]  Martin Land,et al.  Improving a practical DBR buffering approach using Workload Control , 2003 .

[9]  Hans-Peter Wiendahl,et al.  Application of load-oriented manufacturing control in industry , 1992 .

[10]  Cristovao Silva,et al.  A case study of the successful implementation of workload control : A practitioner-led approach , 2015 .

[11]  Michael S. Spencer,et al.  The impact of a constraint buffer in a flow shop , 1995 .

[12]  Mark Stevenson,et al.  Workload control: Successful implementation taking a contingency‐based view of production planning and control , 2013 .

[13]  Satya S. Chakravorty,et al.  An evaluation of the DBR control mechanism in a job shop environment , 2001 .

[14]  Lorraine R. Gardiner,et al.  Drum‐Buffer‐Rope and Buffer Management: Impact on Production Management Study and Practices , 1993 .

[15]  Timothy D. Fry,et al.  Comparisons between drum–buffer–rope and material requirements planning: a case study , 2005 .

[16]  Roberto Cigolini,et al.  Order review and release strategies ina job shop environment: A review and a classification , 1997 .

[17]  Cristovao Silva,et al.  Workload Control and Order Release: A Lean Solution for Make-to-Order Companies , 2012 .

[18]  Jacob V. Simons,et al.  AN EXPOSITION OF MULTIPLE CONSTRAINT SCHEDULING AS IMPLEMENTED IN THE GOAL SYSTEM (FORMERLY DISASTERTM) , 2009 .

[19]  Kenneth R. Baker,et al.  Job shop scheduling with modified due dates , 1983 .

[20]  Kenneth R. Baker,et al.  Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .

[21]  Martin Land,et al.  Parameters and sensitivity in workload control , 2006 .

[22]  Lawrence D. Fredendall,et al.  Protective capacity positioning: Impact on manufacturing cell performance , 2001, Eur. J. Oper. Res..

[23]  S. H. Ashcroft Applying the principles of optimized production technology in a small manufacturing company , 1989 .

[24]  Don T. Phillips,et al.  A comparison of order release strategies in production control systems , 1992 .

[25]  S. Rahman,et al.  Theory of constraints , 1998 .

[26]  Satya S. Chakravorty,et al.  A comparative study of line design approaches for serial production systems , 1996 .

[27]  Nuno O. Fernandes,et al.  Workload control under continuous order release , 2011 .

[28]  Anthony L. Patti,et al.  A comparison of JIT and TOC buffering philosophies on system performance with unplanned machine downtime , 2008 .

[29]  Gerard Gaalman,et al.  The performance of workload control concepts in job shops: improving the release method , 1996 .

[30]  Cristovao Silva,et al.  Three decades of workload control research: a systematic review of the literature , 2011 .

[31]  G. Gaalman,et al.  The influence of shop characteristics on workload control , 2000 .

[32]  Jeff Cox,et al.  The goal : excellence in manufacturing , 1984 .

[33]  James F. Cox,et al.  Competitive factors and performance measurement: Applying the theory of constraints to meet customer needs , 1994 .

[34]  Zinovy D. Radovilsky A quantitative approach to estimate the size of the time buffer in the theory of constraints , 1998 .

[35]  J. J. Kanet Load-limited order release in job shop scheduling systems , 1988 .

[36]  Marc Lambrecht,et al.  Buffer Stock Allocation in Serial and Assembly Type of Production Lines , 1990 .

[37]  Wolfgang Bechte Load-oriented manufacturing control just-in-time production for job shops , 1994 .

[38]  Robert M. O'Keefe,et al.  An order release mechanism for a flexible flow system , 1995 .

[39]  Mark Stevenson,et al.  Job shop control: In search of the key to delivery improvements , 2015 .

[40]  Mark Stevenson,et al.  Workload control in job shops with re-entrant flows: an assessment by simulation , 2016 .

[41]  Eliyahu M. Goldratt,et al.  What is this thing called theory of constraints and how should it be implemented , 1990 .

[42]  Daniel Steele,et al.  Shop Floor Control When Tacit Worker Knowledge is Important , 2011, Decis. Sci..

[43]  Satya S. Chakravorty,et al.  The impact of free goods on the performance of drum-buffer-rope scheduling systems , 2005 .

[44]  Steven A. Melnyk,et al.  Order review/release: research issues and perspectives , 1989 .

[45]  V. J. Mabin,et al.  The performance of the theory of constraints methodology: Analysis and discussion of successful TOC applications , 2003 .

[46]  Lawrence D. Fredendall,et al.  Concerning the theory of workload control , 2010, Eur. J. Oper. Res..

[47]  Mahesh Gupta,et al.  Comparing TOC with MRP and JIT: a literature review , 2009 .

[48]  S. T. Enns An integrated system for controlling shop loading and work flow , 1995 .

[49]  Cristovao Silva,et al.  Lean control for make-to-order companies:integrating customer enquiry management and order release , 2014 .

[50]  William L. Maxwell,et al.  Theory of scheduling , 1967 .