Fault Tree Analysis
暂无分享,去创建一个
[1] Joon-Eon Yang,et al. Optimization of the Surveillance Test Interval of the Safety Systems at the Plant Level , 2000 .
[2] Michael R. Lyu,et al. System reliability analysis of an N-version programming application , 1994 .
[3] Sebastián Martorell,et al. Evaluation of allowed outage time considering a set of plant configurations , 2002, Reliab. Eng. Syst. Saf..
[4] Yu-Shu Hu. Evaluating system behavior through dynamic master logic diagram modeling , 1995 .
[5] F. Farmer. REACTOR SAFETY AND SITING: A PROPOSED RISK CRITERION. , 1967 .
[6] S. Swaminathan,et al. The mathematical formulation for the event sequence diagram framework , 1999 .
[7] Borut Mavko,et al. Component reliability assessment using quantitative and qualitative data , 2001, Reliab. Eng. Syst. Saf..
[8] A. Introduction,et al. AN APPROACH FOR USING PROBABILISTIC RISK ASSESSMENT IN RISK-INFORMED DECISIONS ON PLANT- SPECIFIC CHANGES TO THE LICENSING BASIS , 2009 .
[9] Marko Čepin. Importance of human contribution within the human reliability analysis (IJS-HRA) , 2008 .
[10] Marko Cepin. The risk criteria for assessment of temporary changes in a nuclear power plant. , 2007, Risk analysis : an official publication of the Society for Risk Analysis.
[11] Mohammad Modarres,et al. Function-centered modeling of engineering systems using the goal tree–success tree technique and functional primitives , 1999 .
[12] Tunc Aldemir,et al. Optimization of standby safety system maintenance schedules in nuclear power plants , 1996 .
[13] W. E. Vesely,et al. Two measures of risk importance and their application , 1985 .
[14] Borut Mavko,et al. A dynamic fault tree , 2002, Reliab. Eng. Syst. Saf..
[15] Michiyuki Kobayashi,et al. GO-FLOW: A New Reliability Analysis Methodology , 1988 .
[16] Bernd Bertsche,et al. Fault Tree Analysis, FTA , 2008 .
[17] Leon Cizelj,et al. Vulnerability Analysis of a Nuclear Power Plant Considering Detonations of Explosive Devices , 2006 .
[18] Swedpower Ab,et al. T-book. Reliability data of components in Nordic nuclear power plants. 6. ed , 2005 .
[19] Borut Mavko,et al. Application of the fault tree analysis for assessment of power system reliability , 2009, Reliab. Eng. Syst. Saf..
[20] Hiromitsu Kumamoto,et al. Probabilistic Risk Assessment and Management for Engineers and Scientists , 1996 .
[21] Homayoon Dezfuli,et al. Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition) , 2011 .
[22] George E. Apostolakis,et al. The dynamic flowgraph methodology for assessing the dependability of embedded software systems , 1995, IEEE Trans. Syst. Man Cybern..
[23] Michael C. Cheok,et al. An approach for using risk assessment in risk-informed decisions on plant-specific changes to the licensing basis , 1999 .
[24] W. E. Vesely,et al. Handbook of methods for risk-based analysis of technical specifications , 1996 .
[25] Emanuele Borgonovo,et al. A new importance measure for risk-informed decision making , 2001, Reliab. Eng. Syst. Saf..
[26] Peter Kafka,et al. Probabilistic Risk Assessment for Nuclear Power Plants , 2008 .
[27] Marko Cepin. DEPEND-HRA - A method for consideration of dependency in human reliability analysis , 2008, Reliab. Eng. Syst. Saf..
[28] R. A. Bari,et al. Probabilistic safety analysis procedures guide , 1984 .
[29] B. Mavko,et al. Probabilistic safety assessment improves surveillance requirements in technical specifications , 1997 .
[30] Marko Cepin,et al. Optimization of safety equipment outages improves safety , 2002, Reliab. Eng. Syst. Saf..
[31] J. Vaurio. Optimization of test and maintenance intervals based on risk and cost , 1995 .
[32] Sofía Carlos,et al. Constrained optimization of test intervals using a steady-state genetic algorithm , 2000, Reliab. Eng. Syst. Saf..
[33] N. Siu,et al. Risk assessment for dynamic systems: An overview , 1994 .
[34] G.R. Burdick,et al. Phased Mission Analysis: A Review of New Developments and An Application , 1977, IEEE Transactions on Reliability.
[35] Kaisa Simola,et al. Decision criteria in PSA applications , 2001 .
[36] George E Apostolakis,et al. How Useful Is Quantitative Risk Assessment? , 2004, Risk analysis : an official publication of the Society for Risk Analysis.
[37] Yansong Ren,et al. Design of reliable systems using static and dynamic fault trees , 1998 .
[38] Joanne Bechta Dugan. Automated analysis of phased-mission reliability , 1991 .
[39] Andrej Prošek,et al. Success criteria time windows of operator actions using RELAP5/MOD3.3 within human reliability analysis , 2008 .
[40] Marko Cepin. Analysis of truncation limit in probabilistic safety assessment , 2005, Reliab. Eng. Syst. Saf..
[41] A. Introduction. AN APPROACH FOR PLANT-SPECIFIC, RISK-INFORMED DECISIONMAKING: TECHNICAL SPECIFICATIONS , 2012 .
[42] Ioannis A. Papazoglou. Mathematical Foundations of Event Trees , 1998 .
[43] Borut Mavko,et al. Fault tree developed by an object-based method improves requirements specification for safety-related systems , 1999 .
[44] Blas Galván,et al. Use of multiple objective evolutionary algorithms in optimizing surveillance requirements , 2006, Reliab. Eng. Syst. Saf..
[45] Mohammad Modarres,et al. A historical overview of probabilistic risk assessment development and its use in the nuclear power industry: a tribute to the late Professor Norman Carl Rasmussen , 2005, Reliab. Eng. Syst. Saf..
[46] E. Lofgren,et al. Interim Reliability Evaluation Program procedures guide , 1983 .