A flexible job shop cell scheduling with sequence-dependent family setup times and intercellular transportation times using conic scalarization method
暂无分享,去创建一个
[1] Reza Bashirzadeh,et al. Concurrent scheduling of manufacturing cells considering sequence-dependent family setup times and intercellular transportation times , 2015 .
[2] Chengkuan Zeng,et al. Job-shop cell-scheduling problem with inter-cell moves and automated guided vehicles , 2015, J. Intell. Manuf..
[3] F. Pezzella,et al. A genetic algorithm for the Flexible Job-shop Scheduling Problem , 2008, Comput. Oper. Res..
[4] Yan Wang,et al. Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routes , 2013, Comput. Oper. Res..
[5] Yasmin A. Rios-Solis,et al. An integrated approach for timetabling and vehicle scheduling problems to analyze the trade-off between level of service and operating costs of transit networks , 2014 .
[6] Ozden Ustun,et al. Proposal of a nonlinear multi-objective genetic algorithm using conic scalarization to the design of cellular manufacturing systems , 2015 .
[7] Miao Li,et al. An ACO-based intercell scheduling approach for job shop cells with multiple single processing machines and one batch processing machine , 2016, J. Intell. Manuf..
[8] Ferdinando Pezzella,et al. An Improved Genetic Algorithm for the Distributed and Flexible Job-shop Scheduling problem , 2010, Eur. J. Oper. Res..
[9] Ajith Abraham,et al. A Multi-swarm Approach to Multi-objective Flexible Job-shop Scheduling Problems , 2009, Fundam. Informaticae.
[10] Li Lu,et al. Manufacturing Engineering and Intelligent Materials: Proceedings of the International Conference ICMEIM 2015, Guangzhou, China, 30-31 January 2015 , 2015 .
[11] Herman R. Leep,et al. Forming part families by using genetic algorithm and designing machine cells under demand changes , 2006, Comput. Oper. Res..
[12] Yan Wang,et al. An Inter-cell Scheduling Approach Considering Flexible Processing Routes , 2012 .
[13] Hamed Fazlollahtabar,et al. Bi-objective optimisation for scheduling the identical parallel batch-processing machines with arbitrary job sizes, unequal job release times and capacity limits , 2015 .
[14] Michael Patriksson,et al. Scheduling optimisation of a real flexible job shop including fixture availability and preventive maintenance , 2015 .
[15] Javad Behnamian,et al. Decomposition based hybrid VNS-TS algorithm for distributed parallel factories scheduling with virtual corporation , 2014, Comput. Oper. Res..
[16] Jiyin Liu,et al. The equipment maintenance scheduling problem in a coal production system , 2013 .
[17] Prem Vrat,et al. Post design modeling for cellular manufacturing system with cost uncertainty , 1998 .
[18] Derya Deliktas,et al. Student selection and assignment methodology based on fuzzy MULTIMOORA and multichoice goal programming , 2017, Int. Trans. Oper. Res..
[19] Mohsen Ziaee. A heuristic algorithm for the distributed and flexible job-shop scheduling problem , 2013, The Journal of Supercomputing.
[20] P. Siano,et al. Evaluating the effectiveness of normal boundary intersection method for short-term environmental/economic hydrothermal self-scheduling , 2015 .
[21] Maghsud Solimanpur,et al. A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts , 2011, Comput. Ind. Eng..
[22] Augusto Q. Novais,et al. Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: a mathematical programming approach , 2013 .
[23] Madjid Tavana,et al. Drone shipping versus truck delivery in a cross-docking system with multiple fleets and products , 2017, Expert Syst. Appl..
[24] Refail Kasimbeyli. A conic scalarization method in multi-objective optimization , 2013, J. Glob. Optim..
[25] Fardin Ahmadizar,et al. Bi-criteria single machine scheduling with a time-dependent learning effect and release times , 2012 .
[26] Ali Esmaeel Nezhad,et al. Applying augmented ɛ-constraint approach and lexicographic optimization to solve multi-objective hydrothermal generation scheduling considering the impacts of pumped-storage units , 2014 .
[27] Ali Ghaffari,et al. Sequential quadratic programming and analytic hierarchy process for nonlinear multiobjective optimization of a hydropower network , 2010 .
[28] F. Jolai,et al. Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times , 2013 .
[29] Pandu R. Tadikamalla,et al. Two-machine flow shop scheduling with deteriorating jobs: minimizing the weighted sum of makespan and total completion time , 2015, J. Oper. Res. Soc..
[30] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[31] Chengkuan Zeng,et al. Scheduling of no buffer job shop cells with blocking constraints and automated guided vehicles , 2014, Appl. Soft Comput..
[32] Ikou Kaku,et al. Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach , 2010, J. Intell. Manuf..