Proportionate flow-shop scheduling with rejection
暂无分享,去创建一个
[1] Byung-Cheon Choi,et al. Two-stage production scheduling with an outsourcing option , 2011, Eur. J. Oper. Res..
[2] Gerhard J. Woeginger,et al. When Does a Dynamic Programming Formulation Guarantee the Existence of a Fully Polynomial Time Approximation Scheme (FPTAS)? , 2000, INFORMS J. Comput..
[3] Yuzhong Zhang,et al. On Several Scheduling Problems with Rejection or Discretely Compressible Processing Times , 2006, TAMC.
[4] Leen Stougie,et al. Multiprocessor scheduling with rejection , 1996, SODA '96.
[5] Zhigang Cao,et al. A PTAS for parallel batch scheduling with rejection and dynamic job arrivals , 2009, Theor. Comput. Sci..
[6] T.C.E. Cheng,et al. A modified artificial bee colony algorithm for order acceptance in two-machine flow shops , 2013 .
[7] Deming Lei,et al. A parallel neighborhood search for order acceptance and scheduling in flow shop environment , 2015 .
[8] Richard M. Karp,et al. Reducibility Among Combinatorial Problems , 1972, 50 Years of Integer Programming.
[9] Dvir Shabtay,et al. Two-machine flow-shop scheduling with rejection , 2012, Comput. Oper. Res..
[10] Chuanli Zhao,et al. Single Machine Scheduling with an Availability Constraint and Rejection , 2014, Asia Pac. J. Oper. Res..
[11] Susan A. Slotnick,et al. Order acceptance and scheduling: A taxonomy and review , 2011, Eur. J. Oper. Res..
[12] John A. Quelch,et al. Externalizar el márketing , 2005 .
[13] Yuzhong Zhang,et al. Scheduling with Rejection to Minimize the Makespan , 2009, COCOA.
[14] Sudipta Sengupta,et al. Algorithms and Approximation Schemes for Minimum Lateness/Tardiness Scheduling with Rejection , 2003, WADS.
[15] Vincent T'Kindt,et al. A note on "Two-machine flow-shop scheduling with rejection" and its link with flow-shop scheduling and common due date assignment , 2012, Comput. Oper. Res..
[16] Qiang Gao,et al. Two-Machine Flow shop Scheduling with Individual Operation's rejection , 2014, Asia Pac. J. Oper. Res..
[17] Byung-Cheon Choi,et al. Two-machine flow shop scheduling problem with an outsourcing option , 2010, Eur. J. Oper. Res..
[18] Guochuan Zhang,et al. On Two-machine Flow Shop Scheduling , 2014 .
[19] Prabuddha De,et al. Optimal Delivery Time Quotation and Order Sequencing , 1991 .
[20] David Simchi-Levi,et al. Fully polynomial time approximation schemes for stochastic dynamic programs , 2008, SODA '08.
[21] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[22] Lingfa Lu,et al. New results on two-machine flow-shop scheduling with rejection , 2016, J. Comb. Optim..
[23] Ceyda Oguz,et al. A tabu search algorithm for order acceptance and scheduling , 2012, Comput. Oper. Res..
[24] Dvir Shabtay,et al. A survey on offline scheduling with rejection , 2013, J. Sched..
[25] P. B. Coaker,et al. Applied Dynamic Programming , 1964 .
[26] Byung-Cheon Choi,et al. Minimizing maximum completion time in a proportionate flow shop with one machine of different speed , 2007, Eur. J. Oper. Res..
[27] Mikhail Y. Kovalyov,et al. An FPTAS for a single-item capacitated economic lot-sizing problem with monotone cost structure , 2006, Math. Program..
[28] Zhigang Cao,et al. Scheduling with Rejection and Non-Identical Job Arrivals , 2007, J. Syst. Sci. Complex..
[29] David R. Karger,et al. Techniques for scheduling with rejection , 2003, J. Algorithms.
[30] Shijie Sun,et al. Scheduling linear deteriorating jobs with rejection on a single machine , 2009, Eur. J. Oper. Res..
[31] Eugene L. Lawler,et al. Fast approximation algorithms for knapsack problems , 1977, 18th Annual Symposium on Foundations of Computer Science (sfcs 1977).
[32] Samir Khuller,et al. An Optimal Incremental Algorithm for Minimizing Lateness with Rejection , 2008, ESA.
[33] Sartaj Sahni,et al. Algorithms for Scheduling Independent Tasks , 1976, J. ACM.
[34] S. S. Panwalkar,et al. Sequencing Research and the Industrial Scheduling Problem , 1973 .
[35] David R. Karger,et al. Techniques for scheduling with rejection , 1998, J. Algorithms.
[36] Oscar H. Ibarra,et al. Fast Approximation Algorithms for the Knapsack and Sum of Subset Problems , 1975, JACM.
[37] Wieslaw Kubiak,et al. Scheduling shops to minimize the weighted number of late jobs , 1994, Oper. Res. Lett..
[38] Hans Kellerer,et al. A New Fully Polynomial Approximation Scheme for the Knapsack Problem , 1998, APPROX.
[39] Ikou Kaku,et al. Permutation flow shop scheduling with order acceptance and weighted tardiness , 2012, Appl. Math. Comput..
[40] Abdullah Konak,et al. Non-permutation flow shop scheduling with order acceptance and weighted tardiness , 2015, Appl. Math. Comput..
[41] Dvir Shabtay,et al. A bicriteria approach to scheduling a single machine with job rejection and positional penalties , 2012, J. Comb. Optim..
[42] Han Hoogeveen,et al. Minimizing total weighted completion time in a proportionate flow shop , 1998 .
[43] Hans Kellerer,et al. A New Fully Polynomial Time Approximation Scheme for the Knapsack Problem , 1999, J. Comb. Optim..
[44] Jean-Charles Billaut,et al. Multicriteria scheduling , 2005, Eur. J. Oper. Res..
[45] Federico Della Croce,et al. Enumeration of Pareto Optima for a Flowshop Scheduling Problem with Two Criteria , 2007, INFORMS J. Comput..
[46] Yingjie Liu. The Fully Polynomial Approximation Algorithm for the 0-1 Knapsack Problem , 2002, Theory of Computing Systems.
[47] Jacques Carlier,et al. Handbook of Scheduling - Algorithms, Models, and Performance Analysis , 2004 .
[48] Stuart E. Dreyfus,et al. Applied Dynamic Programming , 1965 .
[49] T.C.E. Cheng,et al. Order acceptance and scheduling in a two-machine flowshop , 2013 .