SEVERE ACCIDENT ISSUES RAISED BY THE FUKUSHIMA ACCIDENT AND IMPROVEMENTS SUGGESTED
暂无分享,去创建一个
[1] Alessandro Petruzzi,et al. Deterministic Safety Analysis for Nuclear Power Plants. IAEA Specific Safety Guide , 2009 .
[2] Juan J. Carbajo. MELCOR sensitivity studies for a low-pressure, short-term station blackout at the Peach Bottom plant , 1994 .
[3] S. A. Hodge,et al. BWR Reactor Vessel Bottom Head Failure Modes , 2020, Fission Product Transport Processes in Reactor Accidents.
[4] Russell D. Mosteller,et al. Monte Carlo calculations for recriticality during the reflood phase of a severe accident in a boiling water reactor , 1995 .
[5] Nuclear Emergency Response Headquarters. Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety : the Accident at TEPCO's Fukushima Nuclear Power Stations , 2011 .
[6] David Johnson,et al. The strengths and limitations of PSA: where we stand , 1992 .
[7] Seong-Wan Hong,et al. Effect of SAMG entry condition on operator action time for severe accident mitigation , 2011 .
[8] Man Gyun Na,et al. ON-POWER DETECTION OF PIPE WALL-THINNED DEFECTS USING IR THERMOGRAPHY IN NPPS , 2014 .
[9] V. V. Palazov,et al. SCDAP/RELAP5 THERMAL-HYDRAULIC EVALUATIONS OF THE POTENTIAL FOR CONTAINMENT BYPASS DURING EXTENDED STATION BLACKOUT SEVERE ACCIDENT SEQUENCES IN A WESTINGHOUSE FOUR-LOOP PWR , 2009 .