Economic Scheduling of Generation Iy Valve Points

The scheduling of generation by valve points is described. Several methods of determining the basic incremental heat rates are compared and the effect on a loading schedule is shown.

[1]  G. L. Decker,et al.  Valve point loading of turbines , 1958, Electrical Engineering.

[2]  E. C. M. Stahl,et al.  Economic loading of generating stations , 1931, Electrical Engineering.

[3]  T. E. Purcell,et al.  Tie-Line Control of Interconnected Networks , 1932, Transactions of the American Institute of Electrical Engineers.