Analysis of vehicle requirements in a general automated guided vehicle system based transportation system

This paper considers a new model of automated guided vehicle system arising from modern transportation systems. The objective is to minimize the vehicle number in order to guarantee the stability of the system. An approximately analytical method is proposed and a numerical example based on simulation is also presented to illustrate the method.

[1]  Iris F. A. Vis,et al.  Survey of research in the design and control of automated guided vehicle systems , 2006, Eur. J. Oper. Res..

[2]  Graciela Chichilnisky,et al.  An axiomatic approach to choice under uncertainty with catastrophic risks , 2000 .

[3]  S. L. Gobal,et al.  Vehicle requirements model for automated guided vehicle systems , 1996 .

[4]  Pius J. Egbelu,et al.  Determination of the total number of vehicles in an AGV-based material transport system , 1987 .

[5]  Pius J. Egbelu,et al.  Characterization of automatic guided vehicle dispatching rules , 1984 .

[6]  P. J. Egbelu,et al.  The use of non-simulation approaches in estimating vehicle requirements in an automated guided based transport system , 1987 .

[7]  John N. Tsitsiklis,et al.  Introduction to Probability , 2002 .

[8]  Hans-Joachim Girlich Some comments on normal approximation for stochastic demand processes , 1996 .

[9]  Oliver Ilic,et al.  Analysis of the number of automated guided vehicles required in flexible manufacturing systems , 1994 .

[10]  Thomas Muller Automated guided vehicles , 1983 .

[11]  T. T. Narendran,et al.  Estimation of number of AGVs for an FMS: an analytical model , 1993 .

[12]  Pius J. Egbelu,et al.  Determination of vehicle requirements in automated guided vehicle systems: A statistical approach , 2000 .

[13]  Kripa Shanker,et al.  DETERMINATION OF OPTIMAL AGV FLEET SIZE FOR AN FMS , 1998 .

[14]  René M. B. M. de Koster,et al.  A review of design and control of automated guided vehicle systems , 2006, Eur. J. Oper. Res..

[15]  Pius J. Egbelu,et al.  Integrated manufacturing planning for an AGV-based FMS , 1999 .

[16]  Chelliah Sriskandarajah,et al.  Operational Decisions in AGV-Served Flowshop Loops: Fleet Sizing and Decomposition , 2001, Ann. Oper. Res..

[17]  S. L. Gobal,et al.  A simulation model for estimating vehicle requirements in automated guided vehicle systems , 1991 .

[18]  Chelliah Sriskandarajah,et al.  Design and operational issues in AGV-served manufacturing systems , 1998, Ann. Oper. Res..

[19]  Athanasios G. Mamalis,et al.  Automated guided vehicle system design for FMS applications , 1990 .