Optimization of batch operations with a truncated batch-position-based learning effect
暂无分享,去创建一个
Yongjun Li | Kai Li | Bayi Cheng | Huijun Zhu | Yongjun Li | Kai Li | B. Cheng | Huijun Zhu
[1] Zsolt Tuza,et al. Tight absolute bound for First Fit Decreasing bin-packing: FFD(l) ≤ 11/9 OPT(L) + 6/9 , 2013, Theor. Comput. Sci..
[2] Dirk Biskup,et al. Single-machine scheduling with learning considerations , 1999, Eur. J. Oper. Res..
[3] Panos M. Pardalos,et al. Serial-batching group scheduling with release times and the combined effects of deterioration and truncated job-dependent learning , 2018, J. Glob. Optim..
[4] Rasaratnam Logendran,et al. A bi-objective batch processing problem with dual-resources on unrelated-parallel machines , 2017, Appl. Soft Comput..
[5] Xi Zhang,et al. Several flow shop scheduling problems with truncated position-based learning effect , 2013, Comput. Oper. Res..
[6] Joseph Y.-T. Leung,et al. Single batch machine scheduling with deliveries , 2015 .
[7] Christos Koulamas. A note on single-machine scheduling with job-dependent learning effects , 2010, Eur. J. Oper. Res..
[8] Na Yin,et al. Scheduling jobs with controllable processing time, truncated job-dependent learning and deterioration effects , 2016 .
[9] Ji-Bo Wang,et al. Resource constrained scheduling with general truncated job-dependent learning effect , 2017, J. Comb. Optim..
[10] Ping Ji,et al. Single machine scheduling jobs with a truncated sum-of-processing-times-based learning effect , 2013 .
[11] Joseph Y.-T. Leung,et al. Integrated scheduling on a batch machine to minimize production, inventory and distribution costs , 2017, Eur. J. Oper. Res..
[12] Zhenyou Wang,et al. Solution algorithms for the number of tardy jobs minimisation scheduling with a time-dependent learning effect , 2017 .
[13] Avijit Banerjee,et al. Integrated Multiproduct Batch Production and Truck Shipment Scheduling under Different Shipping Policies , 2016 .
[14] Sergey Kovalev,et al. Batching for work and rework processes on dedicated facilities to minimize the makespan , 2010 .
[15] Wen-Chiung Lee,et al. Single-machine scheduling with general sum-of-processing-time-based and position-based learning effects , 2011 .
[16] Dirk Biskup,et al. A state-of-the-art review on scheduling with learning effects , 2008, Eur. J. Oper. Res..
[17] T. C. Edwin Cheng,et al. A two-agent single-machine scheduling problem with truncated sum-of-processing-times-based learning considerations , 2011, Comput. Ind. Eng..
[18] T.C.E. Cheng,et al. Single-machine batch delivery scheduling with an assignable common due window , 2013 .
[19] Dar-Li Yang,et al. Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect , 2006, Eur. J. Oper. Res..
[20] Chin-Chia Wu,et al. Single-machine and two-machine flowshop scheduling problems with truncated position-based learning functions , 2013, J. Oper. Res. Soc..
[21] Bertrand M. T. Lin,et al. Scheduling in an assembly-type production chain with batch transfer , 2007 .
[22] Rasaratnam Logendran,et al. A comparison of two stage-based hybrid algorithms for a batch scheduling problem in hybrid flow shop with learning effect , 2018 .
[23] Yu-Bin Wu,et al. Single-machine scheduling with truncated sum-of-processing-times-based learning effect including proportional delivery times , 2015, Neural Computing and Applications.
[24] T. C. Edwin Cheng,et al. Scheduling with a position-weighted learning effect based on sum-of-logarithm-processing-times and job position , 2013, Inf. Sci..
[25] Chin-Chia Wu,et al. Some single-machine scheduling problems with a truncation learning effect , 2011, Comput. Ind. Eng..
[26] Lixin Tang,et al. Scheduling a single semi-continuous batching machine , 2008 .
[27] Chin-Chia Wu,et al. Some polynomial solvable single-machine scheduling problems with a truncation sum-of-processing-times based learning effect , 2012 .