Construction quality management - present and future

This paper reviews past work in construction quality management by examining its major components in the context of a study framework derived from ISO 9000. Emphasis is placed on determining the state-of-the-art and exploring the roles that information technology already plays as well as could play in improving the quality management function. The authors elaborate on several dimensions of the quality management view of a project in terms of how it would interact with the physical, process, cost, and as-built views of a project, which are essential to the quality management function as well as to other project management functions. This is done in a way that reflects the authors' vision of the kind of support that a computer system could offer for the tasks of identifying, predicting, analyzing, and solving quality problems in a preventive mode.Key words: construction quality management, ISO 9000, problem prevention, problem prediction, computer system.

[1]  James D. Stevens,et al.  Blueprint for Measuring Project Quality , 1996 .

[2]  Colin H. Davidson,et al.  Cause and effect 3-D model for measuring performance in construction acceleration: a decision support system PRELIMINARY STRUCTURE OF DECISION SUPPORT SYSTEM TO HELP MANAGERS DECIDE WHETHER AND HOW TO ACCELERATE PROGRESS IN CONSTRUCTION PROJECTS WHEN DELAYS OCCUR , 1996 .

[3]  Allan F. Samuels CONSTRUCTION FACILITIES AUDIT: QUALITY SYSTEM-PERFORMANCE CONTROL , 1994 .

[4]  Edward A. Abdun-Nur CONTROL OF QUALITY, A SYSTEM , 1970 .

[5]  Jack H. Willenbrock,et al.  Construction QA/QC Systems: Comparative Analysis , 1980 .

[6]  W. B. Ledbetter,et al.  MEASURING DESIGN AND CONSTRUCTION QUALITY COSTS , 1989 .

[7]  Satyanarayana Naga Kalidindi Statistical Process Control in Industrial Construction Engineering Organizations , 1991 .

[8]  Patrice Anne Derrington Controlling the quality of professional performance in architectural practice , 1981 .

[9]  Miyoung Jeong,et al.  Quality function deployment: An extended framework for service quality and customer satisfaction in the hospitality industry , 1998 .

[10]  Thomas Hepworth Oswald A Model for Using Quality Function Deployment in Engineering Project Development , 1995 .

[11]  W. B. Ledbetter,et al.  Causes of Quality Deviations in Design and Construction , 1992 .

[12]  W. B. Ledbetter Quality Performance on Successful Project , 1994 .

[13]  G. Akhras,et al.  Prototype Object-Oriented System for Maintenance of Timber Trusses , 1994 .

[14]  Peter Barrett,et al.  Facilities management quality systems: An important improvement area , 1995 .

[15]  Liang Y Liu,et al.  Construction quality assurance in Corps of Engineers projects utilizing CADD systems , 1995 .

[16]  Suhaiza Hanim Binti Dato Mohamad Zailani Quality Control Circles , 1998 .

[17]  Thomas Froese,et al.  Challenges and a vision for computer-integrated management systems for medium-sized contractors , 1995 .

[18]  Syed Mahmood Ahmed An integrated total quality management (TQM) model for the construction process , 1993 .

[19]  H. Abdul-Rahman The cost of non-conformance during a highway project: a case study , 1995 .

[20]  Antti Lakka,et al.  Measuring the results of quality improvement work , 1995 .

[21]  J. C. Mallon,et al.  Quality function deployment: a system for meeting customers' needs , 1993 .

[22]  D. Spekknink Architect's and consultant's quality management system , 1995 .

[23]  Jerald L. Rounds,et al.  Total quality management for construction , 1985 .

[24]  Avigdor. Zonnenshain COMPREHENSIVE APPROACH FOR EVALUATION AND CONSTRUCTION OF ACCEPTANCE SAMPLING PROCEDURES. , 1983 .

[25]  Ali Touran,et al.  Quality Control Circles in Construction , 1987 .

[26]  E. William East,et al.  SEDAR: Expert Critiquing System for Flat and Low-Slope Roof Design and Review , 1997 .

[27]  Merlyn Isaak Contractor Quality Control: An Evaluation , 1982 .

[28]  James D. Stevens,et al.  Quality-Measurement Matrix , 1994 .

[29]  Weston T. Hester Alternative Construction Quality Assurance Programs , 1979 .

[30]  Luh-Maan Chang,et al.  Developing Acceptance-Sampling Methods for Quality Construction , 1995 .

[31]  R W English,et al.  COMPUTERIZED MONITORING OF PUBLIC SECTOR CONSTRUCTION PROJECTS , 1995 .

[32]  G. E. Gibson,et al.  Benchmarking Preproject Planning Effort , 1996 .

[33]  Shigenori Tanaka,et al.  EXPERT SYSTEM WITH LEARNING ABILITY FOR RETROFITTING STEEL BRIDGES , 1994 .