Planning water resources management systems using a fuzzy-boundary interval-stochastic programming method

In this study, a fuzzy-boundary interval-stochastic programming (FBISP) method is developed for planning water resources management systems under uncertainty. The developed FBISP method can deal with uncertainties expressed as probability distributions and fuzzy-boundary intervals. With the aid of an interactive algorithm woven with a vertex analysis, solutions for FBISP model under associated α-cut levels can be generated by solving a set of deterministic submodels. The related probability and possibility information can also be reflected in the solutions for the objective function value and decision variables. The developed FBISP is also applied to water resources management and planning within a multi-reservoir system. Various policy scenarios that are associated with different levels of economic consequences when the pre-regulated water-allocation targets are violated are analyzed. The results obtained are useful for generating a range of decision alternatives under various system conditions, and thus helping decision makers to identify desired water resources management policies under uncertainty.

[1]  H. Trussell,et al.  Constructing membership functions using statistical data , 1986 .

[2]  Ni-Bin Chang,et al.  A grey fuzzy multiobjective programming approach for the optimal planning of a reservoir watershed. Part B: Application , 1996 .

[3]  Haruya Tanakamaru,et al.  Spatial and Temporal Analysis of Evapotranspiration Using Satellite Remote Sensing Data: A Case Study in the Gezira Scheme, Sudan , 2009 .

[4]  M. Zarghami,et al.  Stochastic-fuzzy multi criteria decision making for robust water resources management , 2009 .

[5]  Jitka Dupacová,et al.  Applications of stochastic programming: Achievements and questions , 2002, Eur. J. Oper. Res..

[6]  Guo H. Huang,et al.  An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty , 2005, Eur. J. Oper. Res..

[7]  G H Huang,et al.  IFRP: a hybrid interval-parameter fuzzy robust programming approach for waste management planning under uncertainty. , 2007, Journal of environmental management.

[8]  D. Rosenberg Shades of grey: A critical review of grey-number optimization , 2009 .

[9]  Caroline M. Eastman,et al.  Response: Introduction to fuzzy arithmetic: Theory and applications : Arnold Kaufmann and Madan M. Gupta, Van Nostrand Reinhold, New York, 1985 , 1987, Int. J. Approx. Reason..

[10]  Shabbir Ahmed,et al.  A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty , 2003, J. Glob. Optim..

[11]  Ni-Bin Chang,et al.  A grey fuzzy multiobjective programming approach for the optimal planning of a reservoir watershed. Part A: Theoretical development , 1996 .

[12]  Slobodan P. Simonovic,et al.  A fuzzy compromise approach to water resource systems planning under uncertainty , 2000, Fuzzy Sets Syst..

[13]  W. Dong,et al.  Vertex method for computing functions of fuzzy variables , 1987 .

[14]  Leon S. Lasdon,et al.  A scenario-based stochastic programming model for water supplies from the highland lakes , 2000 .

[15]  I. Bogardi,et al.  Numerical solute transport simulation using fuzzy sets approach , 1997 .

[16]  H. Zimmermann,et al.  Fuzzy Set Theory and Its Applications , 1993 .

[17]  K. Hipel Multiple objective decision making in water resources , 1992 .

[18]  Julian Scott Yeomans Applications of Simulation-Optimization Methods in Environmental Policy Planning under Uncertainty , 2008 .

[19]  C. Hwang,et al.  Fuzzy Mathematical Programming: Methods and Applications , 1995 .

[20]  P. P. Mujumdar,et al.  Grey fuzzy optimization model for water quality management of a river system , 2006 .

[21]  Salam Sawadogo,et al.  Flexible management of water resource systems , 2005, Appl. Math. Comput..

[22]  Keith W. Hipel,et al.  Interior-Point Method for Reservoir Operation with Stochastic Inflows , 2001 .

[23]  Y. P. Li,et al.  IFMP: Interval-fuzzy multistage programming for water resources management under uncertainty , 2008 .

[24]  M. Pereira,et al.  Stochastic Optimization of a Multireservoir Hydroelectric System: A Decomposition Approach , 1985 .

[25]  C. Revelle,et al.  A multiobjective optimization model for dam removal: an example trading off salmon passage with hydropower and water storage in the Willamette basin , 2005 .

[26]  Son-Lin Nie,et al.  A dual-interval vertex analysis method and its application to environmental decision making under uncertainty , 2010, Eur. J. Oper. Res..

[27]  Guohe Huang,et al.  A GREY LINEAR PROGRAMMING APPROACH FOR MUNICIPAL SOLID WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY , 1992 .

[28]  William W.-G. Yeh,et al.  Use of stochastic dynamic programming for reservoir management , 1987 .

[29]  Jitka Dupacová,et al.  Scenarios for Multistage Stochastic Programs , 2000, Ann. Oper. Res..

[30]  John R. Birge,et al.  Decomposition and Partitioning Methods for Multistage Stochastic Linear Programs , 1985, Oper. Res..

[31]  R. Słowiński A multicriteria fuzzy linear programming method for water supply system development planning , 1986 .

[32]  Guohe Huang,et al.  AN INEXACT TWO-STAGE STOCHASTIC PROGRAMMING MODEL FOR WATER RESOURCES MANAGEMENT UNDER UNCERTAINTY , 2000 .

[33]  Chih-Sheng Lee,et al.  Interactive fuzzy optimization for an economic and environmental balance in a river system. , 2005, Water research.

[34]  D. Dubois,et al.  Systems of linear fuzzy constraints , 1980 .

[35]  Kevin Fong-Rey Liu,et al.  A Qualitative Decision Support for Environmental Impact Assessment Using Fuzzy Logic , 2009 .

[36]  Lakshmanan Elango,et al.  Application of Solute Transport Modeling to Study Tsunami Induced Aquifer Salinity in India , 2010 .

[37]  Subhankar Karmakar,et al.  A two-phase grey fuzzy optimization approach for water quality management of a river system , 2007 .

[38]  G H Huang,et al.  Inexact multistage stochastic integer programming for water resources management under uncertainty. , 2008, Journal of environmental management.

[39]  B. F. Sule,et al.  Stochastic dynamic programming models for reservoir operation optimization , 1984 .

[40]  David Kay,et al.  The enterovirus test in the assessment of recreational water-associated gastroenteritis. , 1996 .

[41]  D. Dubois,et al.  Fuzzy sets and statistical data , 1986 .

[42]  J. Stedinger,et al.  Water resource systems planning and analysis , 1981 .

[43]  Gordon H. Huang,et al.  IPWM: AN INTERVAL PARAMETER WATER QUALITY MANAGEMENT MODEL , 1996 .

[44]  B. R. Feiring,et al.  A stochastic programming model for water resource planning , 1998 .

[45]  Huey-Kuo Chen,et al.  A comparison of vertex method with JHE method , 1998, Fuzzy Sets Syst..

[46]  S Vedula,et al.  Multireservoir System Optimization using Fuzzy Mathematical Programming , 2000 .

[47]  Masahiro Inuiguchi,et al.  Possibilistic linear programming: a brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problem , 2000, Fuzzy Sets Syst..

[48]  Gordon H. Huang,et al.  An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty , 2006 .

[49]  Lotfi A. Zadeh,et al.  The Concepts of a Linguistic Variable and its Application to Approximate Reasoning , 1975 .

[50]  Y. P. Li,et al.  Mixed interval–fuzzy two-stage integer programming and its application to flood-diversion planning , 2007 .