Advances in Production Management Systems: Innovative Production Management Towards Sustainable Growth
暂无分享,去创建一个
Dimitris Kiritsis | Masaru Nakano | Shigeki Umeda | Hironori Hibino | Gregor von Cieminski | Hajime Mizuyama | M. Nakano | H. Mizuyama | D. Kiritsis | S. Umeda | G. Cieminski | H. Hibino
[1] Cory Searcy,et al. An analysis of metrics used to measure performance in green and sustainable supply chains , 2015 .
[2] Sergio Terzi,et al. Towards a Performance Measurement System for Lean-Oriented NPD Processes , 2011 .
[3] M. Rese,et al. An Ontology of Business Models for Industrial Product-Service Systems , 2013 .
[4] Yuichi Moriguchi,et al. A quantitative method to evaluate the level of material use in lease/reuse systems of electrical and electronic equipment , 2006 .
[5] Xander Olsthoorn,et al. Environmental Indicators for Business: A Review of the Literature and Standardisation Methods , 2001 .
[6] Matthew A. Koschmann. The Communicative Constitution of Collective Identity in Interorganizational Collaboration , 2013 .
[7] Xuening Chu,et al. A new importance-performance analysis approach for customer satisfaction evaluation supporting PSS design , 2012, Expert Syst. Appl..
[8] Jim Sumara,et al. Earned Value—The Next Generation—A Practical Application for Commercial Projects , 1997 .
[9] Erlend Alfnes,et al. A Concept for Project Manufacturing Planning and Control for Engineer-to-Order Companies , 2012, APMS.
[10] François Cooren,et al. Spacing Practices: The Communicative Configuration of Organizing Through Space‐Times , 2013 .
[11] Ali Mohammadi,et al. Lean Product Development - Performance Measurement System , 2010 .
[12] Adisa Azapagic,et al. Developing a framework for sustainable development indicators for the mining and minerals Industry , 2004 .
[13] Bo Terje Kalsaas,et al. INTEGRATION OF COLLABORATIVE LPS-INSPIRED AND RATIONALISTIC PLANNING PROCESSES IN MECHANICAL ENGINEERING OF OFFSHORE DRILLING CONSTRUCTIONS , 2013 .
[14] Regine W. Vroom,et al. An industry approach to shared, cross-organisational engineering change handling - The road towards standards for product data processing , 2011, Comput. Aided Des..
[15] Qi Hao,et al. CHANGE MANAGEMENT IN CONSTRUCTION PROJECTS , 2008 .
[16] George Q. Huang,et al. Development of a web-based system for engineering change management , 2001 .
[17] Maurice Bonney,et al. Environmental performance measures for supply chains , 2011 .
[18] Chun-Juei Chou,et al. An approach to assessing sustainable product-service systems , 2015 .
[19] Björn Niehaves,et al. Collaborative business process management: status quo and quo vadis , 2011, Bus. Process. Manag. J..
[20] Linda L. Putnam,et al. Introduction: Communication constitutes organization , 2008 .
[21] Jukka Alvesalo,et al. Bottom-up or top-down? Evolutionary change management in NPD processes , 2003, Int. J. Technol. Manag..
[22] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[23] François Cooren,et al. Acting and organizing: How speech acts structure organizational interactions , 2001 .
[24] Terry Cooke-Davies,et al. The “real” success factors on projects , 2002 .
[25] Lisa Brownsword,et al. Using Earned Value Management (EVM) in Spiral Development , 2005 .
[26] Lihui Wang,et al. Adaptive Distributed Process Planning and Executions for Multi-tasking Machining Centers with Special Functionalities , 2015 .
[27] Ulf Seigerroth,et al. Collaborative Process Modeling: The Intersport Case Study , 2010, BPM 2010.
[28] Friedrich Morlock,et al. Key performance indicators for assessing the planning and delivery of industrial services , 2013 .
[29] Kristina Kjersem,et al. Literature Review on Planning Design and Engineering Activities in Shipbuilding , 2014 .
[30] Timothy Kuhn,et al. A Communicative Theory of the Firm: Developing an Alternative Perspective on Intra-organizational Power and Stakeholder Relationships , 2008 .
[31] T. Newcomb. An approach to the study of communicative acts. , 1953, Psychological review.
[32] Oliver Völker,et al. Industrial Product-Service Systems (IPS2) , 2011 .
[33] Sergio Biggemann,et al. Building in sustainability, social responsibility and value co-creation , 2014 .
[34] P. Jarzabkowski,et al. Strategic planning as communicative process , 2011 .
[35] E. Kelloway,et al. High-quality work, job satisfaction, and occupational injuries. , 2003, The Journal of applied psychology.
[36] Horst Meier,et al. Robust Capacity Planning for the Delivery of Industrial Product-service Systems , 2014 .
[37] Pm Braiden,et al. Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach , 2000 .
[38] Thomas H. Davenport. Process Management for Knowledge Work , 2015 .
[39] François Cooren,et al. Organizational Language in use: Interaction Analysis, Conversation Analysis and Speech Act Schematics , 2004 .
[40] David Little,et al. Integrated planning and scheduling in the engineer-to-order sector , 2000, Int. J. Comput. Integr. Manuf..
[41] Brad Harrington,et al. Career Management & Work-Life Integration: Using Self-Assessment to Navigate Contemporary Careers , 2007 .
[42] Rita Lavikka,et al. A process for building inter-organizational contextual ambidexterity , 2015, Bus. Process. Manag. J..
[43] Erling S. Andersen,et al. Project maturity in organisations , 2003 .
[44] Roy Wendler,et al. The maturity of maturity model research: A systematic mapping study , 2012, Inf. Softw. Technol..
[45] Maik Maurer,et al. Knowledge Evaluation for PSS Providers , 2014 .
[46] Jan Emblemsvåg,et al. Lean Project Planning in Shipbuilding , 2014 .
[47] Jack R. Meredith,et al. Building operations management theory through case and field research , 1998 .
[48] 野中 郁次郎,et al. The Knowledge-Creating Company: How , 1995 .
[49] L. Ellram. THE USE OF THE CASE STUDY METHOD IN LOGISTICS RESEARCH , 1996 .
[50] J. Riedel,et al. Readiness assessment of collaborative networked organisations for integrated product and service delivery , 2013 .
[51] P. Glavič,et al. Indicators of sustainable production , 2003 .
[52] Donna S. Canestraro,et al. From agency to structure: Analysis of an episode in a facilitation process , 2006 .
[53] R. Yin. The abridged version of case study research: Design and method. , 1998 .
[54] Jörg Becker,et al. Developing Maturity Models for IT Management , 2009, Bus. Inf. Syst. Eng..
[55] Friedrich Morlock,et al. Concept for a Performance Measurement Method for the Organization of the IPS2 Delivery , 2014 .
[56] R. Miettinen,et al. Epistemic Objects, Artefacts and Organizational Change , 2005 .
[57] Michael D. Pfarrer,et al. A Communicative Framework of Value in Cross-Sector Partnerships , 2012 .
[58] Kristina Kjersem,et al. Implementation of Lean Project Planning: A Knowledge Transfer Perspective , 2014, APMS.
[59] Sora Lee,et al. Dynamic and multidimensional measurement of product-service system (PSS) sustainability: a triple bottom line (TBL)-based system dynamics approach , 2012 .
[60] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .