REAKTION: a system for event independent reactive scheduling
暂无分享,去创建一个
[1] Stephen F. Smith,et al. Reactive Plan Revision , 1988, AAAI.
[2] Stephen F. Smith,et al. OPIS: an opportunistic factory scheduling system , 1990, IEA/AIE '90.
[3] H. Van Dyke Parunak,et al. Characterizing the manufacturing scheduling problem , 1991 .
[4] Mark S. Fox,et al. Constraint-Directed Search: A Case Study of Job-Shop Scheduling , 1987 .
[5] K. G. Kempf,et al. Manufacturing planning and scheduling: where we are and where we need to be , 1989, [1989] Proceedings. The Fifth Conference on Artificial Intelligence Applications.