Reasons for delay in selected hydro-power projects in Khyber Pakhtunkhwa (KPK), Pakistan

This paper aims at exploring reasons for delays in Hydro-Power projects completed in last 5 years in Pakistan. Hydro power projects at Allai Khwar, Duber Khwar and Khan Khwar, Khyber Pukhtunkhwa, Pakistan were initiated by Water and Power Development Authority (WAPDA) in 2003 and completed with an average time over-run of 200% and incurred 2.5 times more cost than originally estimated. Study of project documents, interviews from experts highlighted the critical reasons for these costly delays. These reasons were rated and ranked by all three parties of hydro power projects i.e. Client, consultant and contractor on Relative Frequency Index, Relative Severity Index and Independent Relative Importance Index through questionnaire survey. Most of the respondents agreed that “lack of political will, delay in civil work, delays in release of funds by the Government, bad Law and order situation, project start without proper site investigation and poor project time management are the leading reasons behind delays of these Hydro Power projects. These results would be helpful for policy makers and implementing agencies in better planning and mitigating the delay effects in future projects.

[1]  M. Haseeb,et al.  Causes and Effects of Delays in Large Construction Projects of Pakistan , 2011 .

[2]  Ekambaram Palaneeswaran,et al.  Exploring Delays in Victoria-Based Astralian Pipeline Projects , 2011 .

[3]  A. Malik Power Crisis in Pakistan: A Crisis in Governance? , 2012 .

[4]  Augustine Uche Elinwa,et al.  Time-Overrun Factors in Nigerian Construction Industry , 2001 .

[5]  Hesham A. Bassioni,et al.  Causes of Delay in Building Construction Projects in Egypt , 2008 .

[6]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[7]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[8]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[9]  Benjamin K. Sovacool,et al.  An international comparative assessment of construction cost overruns for electricity infrastructure , 2014 .

[10]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[11]  Muhammad Aslam,et al.  Effects of Delay in construction Projects of Punjab-Pakistan: An Empirical Study , 2013 .

[12]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[13]  Misbah Jamil,et al.  Analysis of Time Slippage for Construction Projects in Public Sector: Owner's Perspective , 2012 .

[14]  Ajibade A. Aibinu,et al.  Construction delays and their causative factors in Nigeria , 2006 .

[15]  Richard Symonds,et al.  Economic Survey of Pakistan. , 1950 .

[16]  Dn Collins Hydrology of Glacierised Basins in the Karakoram: report on snow & Ice hydrology project in Pakistan with overseas development administration, UK [ODA] and water & power development authority, Pakistan [WAPDA] , 1994 .

[17]  Anil Sawhney,et al.  Analysing factors affecting delays in Indian construction projects , 2012 .

[18]  Jyh-Bin Yang,et al.  Causes of Delay in the Planning and Design Phases for Construction Projects , 2010 .

[19]  Geraldine J. Kikwasi,et al.  Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania , 2013 .

[20]  Chi-Cheng Yang,et al.  Evaluating schedule delay causes for private participating public construction works under the Build-Operate-Transfer model , 2010 .

[21]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[22]  Mohammad Hossein Fallahnejad,et al.  Delay causes in Iran gas pipeline projects , 2013 .

[23]  Henry Mwanaki Alinaitwe,et al.  Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects , 2013 .

[24]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[25]  Ram Singh,et al.  Delays and Cost Overruns in Infrastructure Projects: Extent, Causes and Remedies , 2010 .

[26]  Indra Gunawan,et al.  Analysis of cost and schedule performance of international development projects , 2010 .