Power System Operator in Mexico Reveals Millions in Savings by Updating Its Short-Term Thermal Unit Commitment Model
暂无分享,去创建一个
Mehmet Bayram Yildirim | Jose L. Ceciliano Meza | Juan Álvarez López | Armando De la Torre Sánchez | Rolando Nieva Gómez | Isaías Guillén Moya | Roberto Navarro Pérez | Favio Perales Martínez | César Torres Ruiz | Anselmo Sánchez Sánchez
[1] Juan Alvarez Lopez,et al. A MIQCP formulation to solve the unit commitment problem for large-scale power systems , 2011 .
[2] Antonio J. Conejo,et al. Short-term hydro-thermal coordination by Lagrangian relaxation: solution of the dual problem , 1999 .
[3] R. Nieva,et al. Lagrangian Reduction of Search-Range for Large-Scale Unit Commitment , 1987, IEEE Power Engineering Review.
[4] Joao P. S. Catalao,et al. Nonlinear optimization method for short‐term hydro scheduling considering head‐dependency , 2008 .
[5] V.M.F. Mendes,et al. Scheduling of head-sensitive cascaded hydro systems: A nonlinear approach , 2009, 2009 IEEE Power & Energy Society General Meeting.
[6] Yuan-Yih Hsu,et al. Dispatch of direct load control using dynamic programming , 1991 .
[7] Juan Álvarez Lopez,et al. Commitment of Combined Cycle Plants Using a Dual Optimization–Dynamic Programming Approach , 2011, IEEE Transactions on Power Systems.
[8] Joao P. S. Catalao,et al. Scheduling of head-dependent cascaded hydro systems: mixed-integer quadratic programming approach , 2010 .
[9] Juan Alvarez Lopez,et al. A Heuristic algorithm to solve the unit commitment problem for real-life large-scale power systems , 2013 .
[10] Joao P. S. Catalao,et al. Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model , 2006 .
[11] Sushil Kumar,et al. Efficient real coded genetic algorithm to solve the non-convex hydrothermal scheduling problem , 2007 .