Probabilistic Production Costing Modeled with AMPL
暂无分享,去创建一个
[1] Roy Billinton,et al. Reliability Evaluation in Energy Limited Generating Capacity Studies , 1978, IEEE Transactions on Power Apparatus and Systems.
[2] Richard E. Rosenthal,et al. A Nonlinear Network Flow Algorithm for Maximization of Benefits in a Hydroelectric Power System , 1981, Oper. Res..
[3] Narcís Nabona,et al. Multicommodity long-term hydrogeneration optimization with capacity and energy constraints , 2000 .
[4] N. Nabona. Multicommodity network flow model for long-term hydro-generation optimization , 1993 .
[5] H. B. Hamilton,et al. Optimal Long Range hydro Scheduling in the Integrated Power System , 1978, IEEE Transactions on Power Apparatus and Systems.
[6] Laureano F. Escudero,et al. Hydropower generation management under uncertainty via scenario analysis and parallel computation , 1995 .
[7] M.V.F. Pereira,et al. Analytical modeling of chronological reservoir operation in probabilistic production costing [of hydrothermal power systems] , 1996 .
[8] Brian W. Kernighan,et al. AMPL: A Modeling Language for Mathematical Programming , 1993 .
[9] Jordi Castro,et al. Optimum long-term hydrothermal coordination with fuel limits , 1995 .