New technologies for high-risk tunnel construction in Guiyang-Guangzhou high-speed railway
暂无分享,去创建一个
[1] Jin Zongzhen. Study of Bench Method's Geometric Parameters Optimization in Weak Broken Wall Rock and Large Cross-section Tunnel , 2013 .
[2] Eric Bleuset,et al. New developments and applications , 2002 .
[3] Xinrong Tan,et al. Advanced Geological Detection for Tunneling in Karst Area , 2012 .
[4] Shougen Chen,et al. Key technologies for construction of Jinping traffic tunnel with an extremely deep overburden and a high water pressure , 2011 .
[5] Wu Jian-he. Micro Bench Method for Tunnelling with Fine Blasting and Its Engineering Application , 2012 .
[6] Xia Cai-chu. Application of ground probing radar to short-term geological forecast for tunnel construction , 2003 .