Logistics optimisation in road construction project
暂无分享,去创建一个
[1] Mohamed Al-Hussein,et al. Optimization Algorithm for Selection and on Site Location of Mobile Cranes , 2005 .
[2] Zhi-Ping Fan,et al. An optimization method for selecting project risk response strategies , 2014 .
[3] Leon S. Lasdon,et al. Design and Use of the Microsoft Excel Solver , 1998, Interfaces.
[4] Jose Weissmann,et al. Distribution of Materials in Road Earthmoving and Paving: Mathematical Programming Approach , 2013 .
[5] Öncü Hazır. A review of analytical models, approaches and decision support tools in project monitoring and control , 2015 .
[6] A. K. W. Jayawardane,et al. Further development of integer programming in earthwork optimization , 1990 .
[7] N. Mansfield,et al. Causes of delay and cost overruns in Nigerian construction projects , 1994 .
[8] Tarek Zayed,et al. Resource Allocation for Concrete Batch Plant Operation: Case Study , 2004 .
[9] Nilay Shah,et al. Logistical network design with robustness and complexity considerations , 2007 .
[10] Michael R. Bartolacci,et al. Optimization Modeling for Logistics: Options and Implementations , 2012 .
[11] Chabota Kaliba,et al. Cost escalation and schedule delays in road construction projects in Zambia , 2009 .
[12] Sou-Sen Leu,et al. Metaheuristics for project and construction management – A state-of-the-art review , 2011 .
[13] Michael Jahr,et al. Tactical planning in supply chain networks with customer oriented single sourcing , 2012 .
[14] Kris G. Mattila,et al. Determination of Haul Distance and Direction in Mass Excavation , 2005 .
[15] Tarek Hegazy,et al. Resource Optimization Using Combined Simulation and Genetic Algorithms , 2003 .
[16] Sadi Assaf,et al. Causes of delay in large construction projects , 2006 .
[17] Larry J. LeBlanc,et al. Heery International's Spreadsheet Optimization Model for Assigning Managers to Construction Projects , 2000, Interfaces.
[18] Min Qiu,et al. Prioritising and scheduling road projects by genetic algorithm , 1997 .
[19] Ibrahim Mahamid. Effects of project’s physical characteristics on cost deviation in road construction , 2013 .
[20] Eric T. T. Wong,et al. Economic evaluation of materials planning systems for construction , 1997 .
[21] Intan Rohani Endut,et al. Cost overrun in the Malaysian construction industry projects: A deeper insight , 2014 .
[22] Y. Khalifa,et al. Minimizing Cutting Wastes of Reinforcement Steel Bars Using Genetic Algorithms and Integer Programming Models , 2007 .
[23] Khaled A El-Rayes,et al. Optimizing Material Procurement and Storage on Construction Sites , 2011 .
[24] Ying-Mei Cheng,et al. An exploration into cost-influencing factors on construction projects , 2014 .
[25] Osama Moselhi,et al. Optimization of Earthmoving Operations in Heavy Civil Engineering Projects , 2009 .
[26] Yuan Fang,et al. Applying activity‐based costing approach for construction logistics cost analysis , 2011 .
[27] Bruno de Athayde Prata,et al. An Integer Linear Programming Model for the Multiperiod Production Planning of Precast Concrete Beams , 2015 .
[28] Thomas K. L. Tong,et al. Genetic algorithm model in optimizing the use of labour , 2001 .
[29] Hongze Ma,et al. A model for designing multiple products logistics networks , 2006 .
[30] John Tookey,et al. Logistics simulation modelling across construction supply chains , 2011 .
[31] Ole Morten Magnussen,et al. Comparative analysis of cost estimates of major public investment projects , 2006 .
[32] Chi Ming Tam,et al. Comparison of Using Mixed-Integer Programming and Genetic Algorithms for Construction Site Facility Layout Planning , 2010 .
[33] Agata Czarnigowska,et al. Optimization of Aggregate Supplies for Road Projects , 2012 .
[34] David K. H. Chua,et al. Overlapping design and construction activities and an optimization approach to minimize rework , 2014 .
[35] Ronald H. Ballou. Logistics Network Design: Modeling and Informational Considerations , 1995 .
[36] Xiaofei Xu,et al. A fuzzy AHP based integer linear programming model for the multi‐criteria transshipment problem , 2012 .
[37] Ali Shafahi,et al. Modeling contractors' project selection and markup decisions influenced by eminence , 2014 .
[38] Mohan Raj Manavazhi,et al. Material and equipment procurement delays in highway projects in Nepal , 2002 .
[39] Kyo-Jin Koo,et al. GA-Based Fuel-Efficient Transfer Path Selection Model for Delivering Construction Materials , 2012 .
[40] O. O. Ugwu,et al. Modelling construction material logistics system with stochastic Petri nets , 2008 .
[41] S. Easa. Earthwork Allocations with Linear Unit Costs , 1988 .