Modelling Preventive Maintenance of Production Plant Given Estimated PM Data and Actual Failure Times
暂无分享,去创建一个
[1] A. H. Christer,et al. Modelling maintenance practice of production plant using the delay-time concept , 1995 .
[2] A. H. Christer,et al. A delay-time-based maintenance model of a multi-component system , 1995 .
[3] A. H. Christer,et al. Developments in delay time analysis for modelling plant maintenance , 1999, J. Oper. Res. Soc..
[4] A. H. Christer,et al. The robustness of the semi‐Markov and delay time single‐component inspection models to the Markov assumption , 2001 .
[5] A. H. Christer,et al. The delay-time modelling of preventive maintenance of plant given limited PM data and selective repair at PM , 1998 .
[6] A. H. Christer,et al. Reducing Production Downtime Using Delay-Time Analysis , 1984 .
[7] Wenbin Wang,et al. Subjective estimation of the delay time distribution in maintenance modelling , 1997 .
[8] A. H. Christer,et al. A data deficiency based parameter estimating problem and case study in delay time PM modeling , 2000 .