WIB (Which-Is-Better) Problems in Maintenance Reliability Policies
暂无分享,去创建一个
[1] Toshio Nakagawa,et al. Maintenance Overtime Policies in Reliability Theory , 2015 .
[2] Shey-Huei Sheu,et al. The generalized age maintenance policies with random working times , 2018, Reliab. Eng. Syst. Saf..
[3] Toshio Nakagawa,et al. Optimal periodic and random inspections with first, last and overtime policies , 2015, Int. J. Syst. Sci..
[4] Toshio Nakagawa,et al. Over-time and over-level replacement policies with random working cycles , 2016, Ann. Oper. Res..
[5] Toshio Nakagawa,et al. Replacement and Preventive Maintenance Models with Random Working Times , 2010, IEICE Trans. Fundam. Electron. Commun. Comput. Sci..
[6] Toshio Nakagawa,et al. OPTIMAL AGE REPLACEMENT AND INSPECTION POLICIES WITH RANDOM FAILURE AND REPLACEMENT TIMES , 2011 .
[7] Chin-Chih Chang,et al. Optimisation of preventive maintenance policies with replacement first and last for systems subject to shocks , 2015 .
[8] Toshio Nakagawa,et al. Comparisons of Periodic and Random Replacement Policies , 2013 .
[9] Toshio Nakagawa,et al. Overtime Replacement Policies with Finite Operating Interval and Number , 2015, IEICE Trans. Fundam. Electron. Commun. Comput. Sci..
[10] Toshio Nakagawa,et al. Comparisons of replacement policies with periodic times and repair numbers , 2017, Reliab. Eng. Syst. Saf..
[11] Chin-Chih Chang,et al. Optimum preventive maintenance policies for systems subject to random working times, replacement, and minimal repair , 2014, Comput. Ind. Eng..
[12] Toshio Nakagawa,et al. First and Last Triggering Event Approaches for Replacement With Minimal Repairs , 2016, IEEE Transactions on Reliability.
[13] María Dolores Berrade,et al. A study of postponed replacement in a delay time model , 2017, Reliab. Eng. Syst. Saf..
[14] Toshio Nakagawa,et al. Periodic Replacement Policies and Comparisons with Their Extended Policies , 2019 .
[15] Marvin Zelen,et al. Mathematical Theory of Reliability , 1965 .
[16] Toshio Nakagawa. Random Maintenance Policies , 2014 .
[17] Toshio Nakagawa,et al. Comparisons of standby and parallel systems in reliability, replacement, scheduling and application , 2016 .
[18] Toshio Nakagawa,et al. Which Replacement Is Better at Working Cycles or Number of Failures , 2020, IEICE Trans. Fundam. Electron. Commun. Comput. Sci..
[19] Toshio Nakagawa,et al. RANDOM AND AGE REPLACEMENT POLICIES , 2010 .
[20] Toshio Nakagawa,et al. Which is better for replacement policies with continuous or discrete scheduled times? , 2015, Eur. J. Oper. Res..
[21] Toshio Nakagawa. Advanced Reliability Models and Maintenance Policies , 2008 .
[22] Toshio Nakagawa,et al. Optimization problems of replacement first or last in reliability theory , 2012, Eur. J. Oper. Res..
[23] Shunji Osaki. Stochastic Models in Reliability and Maintenance , 2002 .
[24] Toshio Nakagawa,et al. Maintenance Theory of Reliability , 2005 .
[25] Toshio Nakagawa,et al. Optimal Random and Periodic Inspection Policies , 2006 .