WIB (Which-Is-Better) Problems in Maintenance Reliability Policies

[1]  Toshio Nakagawa,et al.  Maintenance Overtime Policies in Reliability Theory , 2015 .

[2]  Shey-Huei Sheu,et al.  The generalized age maintenance policies with random working times , 2018, Reliab. Eng. Syst. Saf..

[3]  Toshio Nakagawa,et al.  Optimal periodic and random inspections with first, last and overtime policies , 2015, Int. J. Syst. Sci..

[4]  Toshio Nakagawa,et al.  Over-time and over-level replacement policies with random working cycles , 2016, Ann. Oper. Res..

[5]  Toshio Nakagawa,et al.  Replacement and Preventive Maintenance Models with Random Working Times , 2010, IEICE Trans. Fundam. Electron. Commun. Comput. Sci..

[6]  Toshio Nakagawa,et al.  OPTIMAL AGE REPLACEMENT AND INSPECTION POLICIES WITH RANDOM FAILURE AND REPLACEMENT TIMES , 2011 .

[7]  Chin-Chih Chang,et al.  Optimisation of preventive maintenance policies with replacement first and last for systems subject to shocks , 2015 .

[8]  Toshio Nakagawa,et al.  Comparisons of Periodic and Random Replacement Policies , 2013 .

[9]  Toshio Nakagawa,et al.  Overtime Replacement Policies with Finite Operating Interval and Number , 2015, IEICE Trans. Fundam. Electron. Commun. Comput. Sci..

[10]  Toshio Nakagawa,et al.  Comparisons of replacement policies with periodic times and repair numbers , 2017, Reliab. Eng. Syst. Saf..

[11]  Chin-Chih Chang,et al.  Optimum preventive maintenance policies for systems subject to random working times, replacement, and minimal repair , 2014, Comput. Ind. Eng..

[12]  Toshio Nakagawa,et al.  First and Last Triggering Event Approaches for Replacement With Minimal Repairs , 2016, IEEE Transactions on Reliability.

[13]  María Dolores Berrade,et al.  A study of postponed replacement in a delay time model , 2017, Reliab. Eng. Syst. Saf..

[14]  Toshio Nakagawa,et al.  Periodic Replacement Policies and Comparisons with Their Extended Policies , 2019 .

[15]  Marvin Zelen,et al.  Mathematical Theory of Reliability , 1965 .

[16]  Toshio Nakagawa Random Maintenance Policies , 2014 .

[17]  Toshio Nakagawa,et al.  Comparisons of standby and parallel systems in reliability, replacement, scheduling and application , 2016 .

[18]  Toshio Nakagawa,et al.  Which Replacement Is Better at Working Cycles or Number of Failures , 2020, IEICE Trans. Fundam. Electron. Commun. Comput. Sci..

[19]  Toshio Nakagawa,et al.  RANDOM AND AGE REPLACEMENT POLICIES , 2010 .

[20]  Toshio Nakagawa,et al.  Which is better for replacement policies with continuous or discrete scheduled times? , 2015, Eur. J. Oper. Res..

[21]  Toshio Nakagawa Advanced Reliability Models and Maintenance Policies , 2008 .

[22]  Toshio Nakagawa,et al.  Optimization problems of replacement first or last in reliability theory , 2012, Eur. J. Oper. Res..

[23]  Shunji Osaki Stochastic Models in Reliability and Maintenance , 2002 .

[24]  Toshio Nakagawa,et al.  Maintenance Theory of Reliability , 2005 .

[25]  Toshio Nakagawa,et al.  Optimal Random and Periodic Inspection Policies , 2006 .