Case study—heat recovery with heat pumps
暂无分享,去创建一个
Abstract A previous issue of this Journal (Vol. 1, No. 3), presented preliminary information on a heat pump system installed at the Bamber Bridge dairy of the Milk Marketing Board. This case history, presented at the OYEZ IBC Seminar ‘Heat Pumps in Industry and Commerce’, held in London in June, 1982, presents more recent data on system performance and payback.