Disassembly line balancing problem: a review of the state of the art and future directions
暂无分享,去创建一个
Eren Özceylan | Surendra M. Gupta | Can B. Kalayci | Aşkıner Güngör | S. Gupta | C. B. Kalayci | Askiner Güngör | Eren Özceylan
[1] Eren Özceylan,et al. A solution approach based on beam search algorithm for disassembly line balancing problem , 2016 .
[2] Alfred J.D. Lambert,et al. Linear programming in disassembly/clustering sequence generation , 1999 .
[3] Rajeev Jain,et al. A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems , 2014 .
[4] Alexandre Dolgui,et al. A decomposition method for stochastic partial disassembly line balancing with profit maximization , 2013, 2013 IEEE International Conference on Automation Science and Engineering (CASE).
[5] Yi Wang,et al. A Pareto improved artificial fish swarm algorithm for solving a multi-objective fuzzy disassembly line balancing problem , 2017, Expert Syst. Appl..
[6] Surendra M. Gupta,et al. Unified assembly- and disassembly-line model formulae , 2015 .
[7] Surendra M. Gupta,et al. BENCHMARK DATA SET FOR EVALUATION OF LINE BALANCING ALGORITHMS , 2007 .
[8] Ihsan Sabuncuoglu,et al. Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .
[10] Surendra M. Gupta,et al. A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem , 2016, Ann. Oper. Res..
[11] Rajeev Jain,et al. An AHP and PROMETHEE methods-based environment friendly heuristic for disassembly line balancing problems , 2013 .
[12] Kannan Govindan,et al. Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future , 2015, Eur. J. Oper. Res..
[13] Rajeev Jain,et al. A Heuristic for U-Shaped Disassembly Line Balancing Problems , 2013 .
[14] Alfred J.D. Lambert,et al. Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling , 2004 .
[15] Can Akkan,et al. Task-failure-driven rebalancing of disassembly lines , 2012 .
[16] Sagar V. Kamarthi,et al. Complications in disassembly line balancing , 2001, SPIE Optics East.
[17] Surendra M. Gupta,et al. Product recovery using a disassembly line: challenges and solution , 2001, Proceedings of the 2001 IEEE International Symposium on Electronics and the Environment. 2001 IEEE ISEE (Cat. No.01CH37190).
[18] Surendra M. Gupta,et al. Balancing a sequence-dependent disassembly line using simulated annealing algorithm , 2013 .
[19] Alexandre Dolgui,et al. A bibliographic review of production line design and balancing under uncertainty , 2015 .
[20] Yakup Kara,et al. A network-based shortest route model for parallel disassembly line balancing problem , 2015 .
[21] S. Jack Hu,et al. Disassembly line balancing under high variety of end of life states using a joint precedence graph approach , 2015 .
[22] Surendra M. Gupta,et al. Ant colony optimization for sequence‐dependent disassembly line balancing problem , 2013 .
[23] Alexandre Dolgui,et al. Dealing with uncertainty in disassembly line design , 2014 .
[24] Reggie J. Caudill,et al. A systematic approach to disassembly line design , 2001, Proceedings of the 2001 IEEE International Symposium on Electronics and the Environment. 2001 IEEE ISEE (Cat. No.01CH37190).
[25] Surendra M. Gupta,et al. A tabu search algorithm for balancing a sequence-dependent disassembly line , 2014 .
[26] Surendra M. Gupta,et al. Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line , 2010, Comput. Ind. Eng..
[27] Jia Liu,et al. Balancing Disassembly Line in Product Recovery to Promote the Coordinated Development of Economy and Environment , 2017 .
[28] Alexandre Dolgui,et al. Disassembly Line Balancing and Sequencing under Uncertainty , 2014 .
[29] Sanjay Sharma,et al. A Fuzzy AHP Approach for Calculating the Weights of Disassembly Line Balancing Criteria , 2015, SocProS.
[30] Alina Voda,et al. Modelling and control of an assembly/disassembly mechatronics line served by mobile robot with manipulator , 2014 .
[31] Mehmet Ali Ilgin,et al. Disassembly line balancing using linear physical programming , 2017, Int. J. Prod. Res..
[32] F. Tevhide Altekin,et al. A comparison of piecewise linear programming formulations for stochastic disassembly line balancing , 2017, Int. J. Prod. Res..
[33] J.-M. Henrioud,et al. APPLYING EQUAL PILES APPROACH TO DISASSEMBLY LINE BALANCING PROBLEM , 2005 .
[34] Hui Yu,et al. An Entropy-Based Adaptive Hybrid Particle Swarm Optimization for Disassembly Line Balancing Problems , 2017, Entropy.
[35] Chaoyong Zhang,et al. Disassembly line balancing problem using interdependent weights-based multi-criteria decision making and 2-Optimal algorithm , 2018 .
[36] Dong-Ho Lee,et al. Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal , 2011 .
[37] Masoud Seidi,et al. The Balancing of Disassembly Line of Automobile Engine Using Genetic Algorithm (GA) in Fuzzy Environment , 2016 .
[38] Surendra M. Gupta,et al. Simulated Annealing Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem , 2013, MIM.
[39] Turan Paksoy,et al. Reverse supply chain optimisation with disassembly line balancing , 2013 .
[40] Paul G. Ranky,et al. Dynamic scheduling and line balancing methods, and software tools for lean and reconfigurable disassembly cells and lines , 2003, IEEE International Symposium on Electronics and the Environment, 2003..
[41] Alexandre Dolgui,et al. Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts , 2013, APMS.
[42] Sencer Yeralan,et al. A disassembly line balancing problem with fixed number of workstations , 2016, Eur. J. Oper. Res..
[43] Turan Paksoy,et al. Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing , 2014 .
[44] F. Tevhide Altekin,et al. Remedial actions for disassembly lines with stochastic task times , 2016, Comput. Ind. Eng..
[45] Alexandre Dolgui,et al. An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times , 2015 .
[46] Shwetank Avikal,et al. A Heuristic Based on AHP and TOPSIS for Disassembly Line Balancing , 2015, SocProS.
[47] Dong-Ho Lee,et al. Disassembly scheduling: literature review and future research directions , 2007 .
[48] Surendra M. Gupta,et al. Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem , 2007 .
[49] Feng Yixiong,et al. Multiobjective optimization for disassembly line balancing based on Pareto ant colony algorithm , 2009 .
[50] Rajeev Jain,et al. A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment , 2014, Appl. Soft Comput..
[51] Yeoh kim hao. The Improvement of Line Efficiency on Disassembly Line Balancing Problem: An HRRCD’s Heuristic Rule , 2015 .
[52] Alexandre Dolgui,et al. A Cone programming approach for stochastic disassembly line balancing in the presence of hazardous parts , 2013 .
[53] J. J. Bartholdi,et al. Balancing two-sided assembly lines: a case study , 1993 .
[54] Wang Shuwei,et al. A proposed multi-objective optimization model for sequence-dependent disassembly line balancing problem , 2017, 2017 3rd International Conference on Information Management (ICIM).
[55] B. B. Pathik,et al. Enhancing Supply Chain Management for the Universities: ITESCM Model Perspective , 2012 .
[56] Ayyuce Aydemir-Karadag,et al. Multi-objective optimization of stochastic disassembly line balancing with station paralleling , 2013, Comput. Ind. Eng..
[57] Lin Boqiang,et al. Using LMDI to Analyze the Decoupling of Carbon Dioxide Emissions from China’s Heavy Industry , 2017 .
[58] Shwetank Avikal,et al. A New U-Shaped Heuristic for Disassembly Line Balancing Problems , 2014 .
[59] Rajeev Jain,et al. A PROMETHEE Method Based Heuristic for Disassembly Line Balancing Problem , 2013 .
[60] Dong-Ho Lee,et al. Disassembly planning and scheduling: Review and further research , 2001 .
[61] Surendra M. Gupta,et al. Computational complexity of a reverse manufacturing line , 2006, SPIE Optics East.
[62] Surendra M. Gupta,et al. Disassembly line balancing. , 2007 .
[63] Ion Caciula,et al. Real Time Balancing of Complex Disassembly Lines , 2008 .
[64] Surendra M. Gupta,et al. 2-opt heuristic for the disassembly line balancing problem , 2004, SPIE Optics East.
[65] Surendra M. Gupta,et al. A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem , 2013, The International Journal of Advanced Manufacturing Technology.
[66] Rajeev Jain,et al. A New Heuristic for Disassembly Line Balancing Problems with AND/OR Precedence Relations , 2012, SocProS.
[67] Surendra M. Gupta,et al. Evaluating the impact of sensor-embedded products on the performance of an air conditioner disassembly line , 2011 .
[68] Askiner Gungor,et al. A solution approach to the disassembly line balancing problem in the presence of task failures , 2001 .
[69] Gilvan C. Souza,et al. MIXED ASSEMBLY AND DISASSEMBLY OPERATIONS FOR REMANUFACTURING , 2003 .
[70] Eren Özceylan,et al. Resource Constrained Disassembly Line Balancing Problem , 2016 .
[71] Turan Paksoy,et al. Interactive fuzzy programming approaches to the strategic and tactical planning of a closed-loop supply chain under uncertainty , 2014 .
[72] Surendra M. Gupta,et al. Modeling operational behavior of a disassembly line , 2004, SPIE Optics East.
[73] Surendra M. Gupta,et al. Disassembly line in product recovery , 2002 .
[74] Turan Paksoy,et al. Fuzzy mathematical programming approaches for reverse supply chain optimization with disassembly line balancing problem , 2014, J. Intell. Fuzzy Syst..
[75] Levent Kandiller,et al. Disassembly line balancing with limited supply and subassembly availability , 2004, SPIE Optics East.
[76] Surendra M. Gupta,et al. Management of a Disassembly Line using Two Types of Kanbans , 2013 .
[77] Chaoyong Zhang,et al. An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem , 2017, Int. J. Prod. Res..
[78] Yixiong Feng,et al. A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .
[79] Alexandre Dolgui,et al. Integrated Procurement-Disassembly Problem , 2014, APMS.
[80] S.M. Gupta,et al. Determining optimum and suboptimum disassembly sequences with an application to a cell phone , 2005, (ISATP 2005). The 6th IEEE International Symposium on Assembly and Task Planning: From Nano to Macro Assembly and Manufacturing, 2005..
[81] MengChu Zhou,et al. A systematic approach to design and operation of disassembly lines , 2006, IEEE Trans Autom. Sci. Eng..
[82] Turan Paksoy,et al. Mixed model disassembly line balancing problem with fuzzy goals , 2013 .
[83] Surendra M. Gupta,et al. Ant colony optimization for disassembly sequencing with multiple objectives , 2006 .
[84] Hung Da Wan,et al. Disassembly planning and sequencing for end-of-life products with RFID enriched information , 2013 .
[85] Matthew Morgan,et al. Disassembly line design with uncertainty , 2005, 2005 IEEE International Conference on Systems, Man and Cybernetics.
[86] Alfred J.D. Lambert,et al. A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs , 2005, SPIE Optics East.
[87] Ion Caciula,et al. Column generation approach for disassembly line balancing , 2016 .
[88] Masato Inoue,et al. 2 - Stage Optimal Design and Analysis for Disassembly System with Environmental and Economic Parts Selection Using the Recyclability Evaluation Method , 2014 .
[89] Alexandre Dolgui,et al. Disassembly Line Balancing Problem with Fixed Number of Workstations under Uncertainty , 2014 .
[90] Levent Kandiller,et al. Profit-oriented disassembly-line balancing , 2008 .
[91] Masato Inoue,et al. Disassembly system modeling and design with parts selection for cost, recycling and CO2 saving rates using multi criteria optimization , 2016 .
[92] Surendra M. Gupta,et al. Metrics and experimental data for assessing unbalanced disassembly lines , 2011, Int. J. Manuf. Technol. Manag..
[93] Mir Saman Pishvaee,et al. Biomass supply chain network design: An optimization-oriented review and analysis , 2016 .
[94] Surendra M. Gupta,et al. A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..
[95] Surendra M. Gupta,et al. Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem , 2013, Expert Syst. Appl..
[96] Alexandre Dolgui,et al. Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem , 2014 .
[97] Alexandre Dolgui,et al. Second order conic approximation for disassembly line design with joint probabilistic constraints , 2015, Eur. J. Oper. Res..
[98] P. C. Jha,et al. Integrating disassembly line balancing in the planning of a reverse logistics network from the perspective of a third party provider , 2017, Ann. Oper. Res..
[99] Alexandre Dolgui,et al. A sample average approximation method for disassembly line balancing problem under uncertainty , 2014, Comput. Oper. Res..
[100] Sunder KekreUday,et al. Reconfiguring a Remanufacturing Line at Visteon, Mexico , 2003 .
[101] Alexandre Dolgui,et al. A Stochastic Formulation of the Disassembly Line Balancing Problem , 2012, APMS.
[102] Surendra M. Gupta,et al. River Formation Dynamics Approach for Sequence-Dependent Disassembly Line Balancing Problem , 2013 .
[103] Surendra M. Gupta,et al. Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem , 2005, SPIE Optics East.
[104] Alexandre Dolgui,et al. L-Shaped Algorithm for Stochastic Disassembly Line Balancing Problem , 2013, MIM.
[105] Sheng Huang,et al. Research on Disassembly Line Balancing Problem in the Presence of Uncertain Cycle Time , 2013 .
[106] B. KALAYCI. TABU SEARCH FOR DISASSEMBLY LINE BALANCING WITH MULTIPLE OBJECTIVES Can , 2011 .
[107] Nils Boysen,et al. A classification of assembly line balancing problems , 2007, Eur. J. Oper. Res..
[108] Joseph Sarkis,et al. Quantitative models for managing supply chain risks: A review , 2015, Eur. J. Oper. Res..
[109] Surendra M. Gupta,et al. Impact of different disassembly line balancing algorithms on the performance of dynamic kanban system for disassembly line , 2005, SPIE Optics East.
[110] F. Tevhide Altekin,et al. A Piecewise Linear Model for Stochastic Disassembly Line Balancing , 2016 .
[111] Yixiong Feng,et al. Multi-objective disassembly line balancing via modified ant colony optimization algorithm , 2010, 2010 IEEE Fifth International Conference on Bio-Inspired Computing: Theories and Applications (BIC-TA).
[112] Surendra M. Gupta,et al. Deterministic hybrid and stochastic combinatorial optimization treatments of an electronic product disassembly line , 2006 .
[113] George Chryssolouris,et al. An agent-based collaborative platform for the design of assembly lines , 2016, Int. J. Comput. Integr. Manuf..
[114] Surendra M. Gupta,et al. Combinatorial optimization methods for disassembly line balancing , 2004, SPIE Optics East.
[115] Askiner Gungor,et al. Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .
[116] Ajd Fred Lambert,et al. Disassembly sequencing: A survey , 2003 .
[117] Abe Zeid,et al. Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning , 2014, J. Intell. Manuf..
[118] Alexandre Dolgui,et al. An efficient two-phase iterative heuristic for Collection-Disassembly problem , 2017, Comput. Ind. Eng..
[119] Alfred J.D. Lambert. A heuristic for assembly and disassembly line balancing , 2007 .
[120] Surendra M. Gupta,et al. Greedy algorithm for disassembly line scheduling , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).
[121] Surendra M. Gupta,et al. A variable neighbourhood search algorithm for disassembly lines , 2015 .
[122] Surendra M. Gupta,et al. Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm , 2015 .
[123] Manoj Kumar Tiwari,et al. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem , 2008 .
[124] Surendra M. Gupta,et al. Recovery of sensor embedded washing machines using a multi-kanban controlled disassembly line , 2011 .
[125] Mehmet Ali Ilgin,et al. Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.