Dynamic analysis of the pump system based on MOC–CFD coupled method
暂无分享,去创建一个
Dazhuan Wu | Shuai Yang | Dazhuan Wu | Shuai Yang | Xin Chen | Peng Yan | P. Yan | Xin Chen
[1] P. H. Azoury,et al. Effect of Valve‐Closure Schedule on Water Hammer , 1986 .
[2] T. Shih,et al. A new k-ϵ eddy viscosity model for high reynolds number turbulent flows , 1995 .
[3] Julien Bohbot,et al. Coupling of a 1-D Injection Model with a 3-D Combustion Code for Direct Injection Diesel Engine Simulations , 2008 .
[4] A. Al-Khomairi. Use of Steady-State Pump Head-Discharge Curve for Unsteady Pipe Flow Applications , 2003 .
[5] E. Schlücker,et al. Fluid dynamic interaction between water hammer and centrifugal pumps , 2009 .
[6] Yonggang Cheng,et al. Simulation of Hydraulic Transients in Hydropower Systems Using the 1-D-3-D Coupling Approach , 2012 .
[7] Dazhuan Wu,et al. The transient flow in a centrifugal pump during the discharge valve rapid opening process , 2010 .
[8] Christoph Nytsch-Geusen,et al. Numerical coupling of Modelica and CFD for building energy supply systems , 2011 .
[9] Reza Attarnejad,et al. Water Hammer Analysis by Characteristic Method , 2008 .
[10] Rakesh Chawla,et al. Single-phase mixing studies by means of a directly coupled CFD/system-code tool , 2008 .
[11] Yu Zhang,et al. Hydraulic Transients Induced by Pigging Operation in Pipeline with a Long Slope , 2013, J. Appl. Math..
[12] Silvia Meniconi,et al. In-Line Pipe Device Checking by Short-Period Analysis of Transient Tests , 2011 .
[13] Donald Horkheimer,et al. Investigation of Intake Concepts for a Formula SAE Four- Cylinder Engine Using 1D/3D (Ricardo WAVE-VECTIS) Coupled Modeling Techniques , 2006 .
[14] Dazhuan Wu,et al. Numerical Simulation of the Transient Flow in a Centrifugal Pump During Starting Period , 2010 .
[15] F. Gao,et al. Analysis of reactor coolant pump transient performance in primary coolant system during start-up period , 2013 .
[16] F. Visser,et al. Demonstration and Validation of a 3D CFD Simulation Tool Predicting Pump Performance and Cavitation for Industrial Applications , 2011 .
[17] Ikou Kaku,et al. Shuffled Frog Leaping Algorithm for Preemptive Project Scheduling Problems with Resource Vacations Based on Patterson Set , 2013, J. Appl. Math..
[18] Wenxi Tian,et al. Numerical simulation and optimization on valve-induced water hammer characteristics for parallel pump feedwater system , 2008 .
[19] Mohammad Hadi Afshar,et al. Water hammer simulation by implicit method of characteristic , 2008 .
[20] Hiroshi Tsukamoto,et al. Transient Behavior of a Cavitating Centrifugal Pump at Rapid Change in Operating Conditions—Part 1: Transient Phenomena at Opening/Closure of Discharge Valve , 1999 .