Optimal Production and Ordering Strategies with Defective Items and Allowable Shortage under Two-part Trade Credit
暂无分享,去创建一个
[1] S. Goyal. Economic Order Quantity under Conditions of Permissible Delay in Payments , 1985 .
[2] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[3] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[4] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[5] Gary W. Emery. An Optimal Financial Response to Variable Demand , 1987, Journal of Financial and Quantitative Analysis.
[6] Meir J. Rosenblatt,et al. Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .
[7] S. Goyal. “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .
[8] Meir J. Rosenblatt,et al. A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay , 1989 .
[9] Xin Zhang,et al. Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .
[10] A. Seidmann,et al. Production lot sizing with machine breakdowns , 1992 .
[11] S. Aggarwal,et al. Ordering Policies of Deteriorating Items under Permissible Delay in Payments , 1995 .
[12] Lu Lu. A one-vendor multi-buyer integrated inventory model , 1995 .
[13] M. Petersen,et al. Trade Credit: Theories and Evidence , 1996 .
[14] C. H. Kim,et al. An optimal production run length in deteriorating production processes , 1999 .
[15] M. K. Salameh,et al. Economic production quantity model for items with imperfect quality , 2000 .
[16] S. K. Goyal,et al. On improving the single-vendor single-buyer integrated production inventory model with a generalized policy , 2000, Eur. J. Oper. Res..
[17] Y. Chiu. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .
[18] W. M. Chan,et al. A new EPQ model: integrating lower pricing, rework and reject situations , 2003 .
[19] L. Ouyang,et al. AN EOQ MODEL FOR DETERIORATING ITEMS UNDER SUPPLIER CREDITS LINKED TO ORDERING QUANTITY , 2003 .
[20] Ming-Jong Yao,et al. On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers , 2004, Eur. J. Oper. Res..
[21] Liang-Yuh Ouyang,et al. A study on an inventory model for non-instantaneous deteriorating items with permissible delay in payments , 2006, Comput. Ind. Eng..
[22] S. W. Chiu. Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging , 2006 .
[23] Hui-Ming Wee,et al. Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives , 2007, Eur. J. Oper. Res..
[24] Shailesh S. Kulkarni. Loss-based quality costs and inventory planning: General models and insights , 2008, Eur. J. Oper. Res..
[25] Shib Sankar Sana,et al. An EOQ model with a varying demand followed by advertising expenditure and selling price under permissible delay in payments: for a retailer , 2008, Int. J. Model. Identif. Control..
[26] Leopoldo Eduardo Cárdenas-Barrón. On optimal batch sizing in a multi-stage production system with rework consideration , 2009, Eur. J. Oper. Res..
[27] L. Ouyang,et al. The optimal pricing and ordering policy for an integrated inventory model when trade credit linked to order quantity , 2009 .
[28] C. Chou,et al. Optimal price, warranty length and production rate for free replacement policy in the static demand market , 2009 .
[29] J. Teng. Optimal ordering policies for a retailer who offers distinct trade credits to its good and bad credit customers , 2009 .
[30] Jinn-Tsair Teng,et al. An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity , 2009, Eur. J. Oper. Res..
[31] Mohamad Y. Jaber,et al. A production/remanufacturing inventory model with price and quality dependant return rate , 2010, Comput. Ind. Eng..
[32] Shib Sankar Sana,et al. A production-inventory model in an imperfect production process , 2010, Eur. J. Oper. Res..
[33] B. Sarkar,et al. A stock-dependent inventory model in an imperfect production process , 2010 .
[34] Y. Tsao,et al. A production policy considering reworking of imperfect items and trade credit , 2011 .
[35] K. S. Chaudhuri,et al. An imperfect production process for time varying demand with inflation and time value of money - An EMQ model , 2011, Expert Syst. Appl..
[36] K. S. Chaudhuri,et al. An EOQ model for a deteriorating item with time dependent quadratic demand under permissible delay in payment , 2011, Appl. Math. Comput..
[37] Chun-Wei R. Lin,et al. Defective item inventory model with remanufacturing or replenishing in an integrated supply chain , 2011 .
[38] Saeed Zolfaghari,et al. A review of the extensions of a modified EOQ model for imperfect quality items , 2011 .
[39] Biswajit Sarkar,et al. An inventory model with reliability in an imperfect production process , 2012, Appl. Math. Comput..
[40] Chia-Hsien Su. Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit , 2012 .
[41] P. K. Kapur,et al. Optimal replenishment and credit policy in EOQ model under two-levels of trade credit policy when demand is influenced by credit period , 2012, Int. J. Syst. Assur. Eng. Manag..
[42] Biswajit Sarkar,et al. An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production , 2012, Appl. Math. Comput..
[43] Yu-Jen Lin,et al. A joint optimal ordering and delivery policy for an integrated supplier-retailer inventory model with trade credit and defective items , 2012, Appl. Math. Comput..
[44] Hui-Ming Wee,et al. An improved algorithm and solution on an integrated production-inventory model in a three-layer supply chain , 2012 .
[45] H. Wee,et al. Comments on "An economic order quantity (EOQ) for items with imperfect quality and inspection errors" , 2012 .
[46] Biswajit Sarkar,et al. An EOQ model with delay in payments and time varying deterioration rate , 2012, Math. Comput. Model..
[47] Biswajit Sarkar,et al. A production-inventory model with probabilistic deterioration in two-echelon supply chain management , 2013 .
[48] L. Ouyang,et al. Retailer’s optimal order and credit policies when a supplier offers either a cash discount or a delay payment linked to order quantity , 2013 .
[49] B. Sarkar,et al. An Inventory Model with Finite Replenishment Rate, Trade Credit Policy and Price-Discount Offer , 2013 .
[50] S. Sana. Optimal contract strategies for two stage supply chain , 2013 .
[51] B. Sarkar,et al. An inventory model with time dependent demand and shortages under trade credit policy , 2013 .
[52] Hong-Fwu Yu,et al. An EOQ model for items with acceptable defective part and shortages , 2013 .
[53] L. Ouyang,et al. Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging , 2013 .
[54] Jia-Tzer Hsu,et al. An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns , 2013 .
[55] Biswajit Sarkar,et al. Integrated vendor-buyer supply chain model with vendor's setup cost reduction , 2013, Appl. Math. Comput..
[56] Biswajit Sarkar,et al. An integrated inventory model with variable lead time, defective units and delay in payments , 2014, Appl. Math. Comput..
[57] S. Mondal,et al. An integrated inventory model with delay in payment for deteriorating item under Weibull distribution and advertisement cum price-dependent demand , 2014 .
[58] L. Ouyang,et al. An integrated inventory model with quality improvement and two-part credit policy , 2014 .
[59] B. Sarkar,et al. An economic production quantity model with random defective rate, rework process and backorders for a single stage production system , 2014 .
[60] B. Sarkar,et al. Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process , 2014 .
[61] Walid W. Nasr,et al. Effect of deterioration on the instantaneous replenishment model with imperfect quality items , 2014 .
[62] Liang-Yuh Ouyang,et al. An integrated inventory model with capacity constraint and order-size dependent trade credit , 2015, Comput. Ind. Eng..
[63] Bibhas Chandra Giri,et al. An integrated inventory model for a deteriorating item with allowable shortages and credit linked wholesale price , 2015, Optim. Lett..
[64] B. Sarkar,et al. A Comparative Study Between Inventory Followed by Shortages and Shortages Followed by Inventory Under Trade-Credit Policy , 2015 .
[65] Leopoldo Eduardo Cárdenas-Barrón,et al. An inventory model with trade-credit policy and variable deterioration for fixed lifetime products , 2015, Ann. Oper. Res..
[66] B. Sarkar,et al. Effect of Unequal Lot Sizes, Variable Setup Cost, and Carbon Emission Cost in a Supply Chain Model , 2015 .
[67] A. Taleizadeh,et al. An inventory control problem for deteriorating items with back-ordering and financial considerations under two levels of trade credit linked to order quantity , 2015 .
[68] Biswajit Sarkar,et al. Optimal replenishment policy with variable deterioration for fixed lifetime products , 2016 .
[69] Shib Sankar Sana. Optimal production lot size and reorder point of a two-stage supply chain while random demand is sensitive with sales teams' initiatives , 2016, Int. J. Syst. Sci..
[70] B. Sarkar. Supply Chain Coordination with Variable Backorder, Inspections, and Discount Policy for Fixed Lifetime Products , 2016 .
[71] Biswajit Sarkar,et al. Optimal batch quantity in a cleaner multi-stage lean production system with random defective rate , 2016 .
[72] K. S. Chaudhuri,et al. Two-echelon competitive integrated supply chain model with price and credit period dependent demand , 2016, Int. J. Syst. Sci..
[73] G. C. Mahata,et al. Optimal replenishment and credit policy in supply chain inventory model under two levels of trade credit with time- and credit-sensitive demand involving default risk , 2018 .
[74] Liang-Yuh Ouyang,et al. Supplier-retailer production and inventory models with defective items and inspection errors in non-cooperative and cooperative environments , 2018, RAIRO Oper. Res..