Planning, Scheduling and Tracking of Industrial Project Using Primavera P6 Software
暂无分享,去创建一个
[1] Shaik Mohammad Masood. An Analysis on Resource Planning, Cost Estimation and Tracking of Project by Earned Value Management , 2014 .
[2] Sagar K. Bhosekar,et al. Cost Controlling Using Earned Value Analysis in Construction Industries , 2012 .
[3] P. Esakki Thangam,et al. Planning, Scheduling and Time Management of Six Lanes Road Construction Work at V.O.C Port Trust using Primavera P6 Software , 2016 .
[4] Mohammed ZakiHaider. PLANNING SCHEDULING, TRACKING AND APPLICATION ADMINISTRATION USING PRIMAVERA WEB LOGIC P6 , 2016 .
[5] J. Jayalakshmi,et al. Planning and Scheduling of High Rise Building Using Primavera , 2014 .
[6] Andrew Fernans Tom,et al. Project Monitoring and Control using Primavera , 2013 .
[7] ANALYSIS ON COST, SCHEDULE AND TRACKING OF RESIDENTIAL PROJECT BY EARN VALUE MANAGEMENT METHOD USING PRIMAVERA P6 , 2017 .
[8] Sushant Pradhan. PLANNING, SCHEDULING AND RESOURCE OPTIMISATION OF MULTIPLE PROJECTS USING ORACLE PRIMAVERA P6 , 2016 .
[9] Ankur Verma,et al. Earned Value Analysis of ConstructionProject at Rashtriya Sanskrit Sansthan,Bhopal , 2014 .
[10] Deepti Sahu,et al. Resource Planning of a Colony Project Using Primavera , 2017 .
[11] Nagendra Prasad. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING AND TECHNOLOGY (IJCIET ) , 2013 .
[12] M. Deshpande,et al. International Research Journal of Engineering and Technology (IRJET) , 2016 .
[13] B. Prakash Rao,et al. EARNED VALUE ANALYSIS ON AN ONGOING RESIDENTIAL BUILDING PROJECT IN BANGALORE, INDIA , 2015 .
[14] J RajeevaS,et al. PLANNING, SCHEDULING, TRACKING OF RESIDENTIAL BUILDING USING PRIMAVERA SOFTWARE P6 , 2017 .