Planning, Scheduling and Tracking of Industrial Project Using Primavera P6 Software

Proper planning and scheduling is very important part of construction projects for reducing and controlling delays of the project. Substantial amounts of time, money and resources are wasted each year in a construction industry due to improper management of construction activities. With globalization the construction projects have become vast and very complex. Planning of such projects requires huge amount of paperwork and time, which can be reduced with the help of project planning software. Providing good planning, proper organization, sufficient flow of resources to a project cannot automatically achieve the desired result. A warning mechanism must be present, which can alert the organization about its possible success and failures throughout the project. The main objectives of this study are to plan, schedule, and track an industrial project with the help of primavera P6 software and study the results generated. Also to recommend measures to the organization for enhancing their project planning skills for similar projects in future.

[1]  Shaik Mohammad Masood An Analysis on Resource Planning, Cost Estimation and Tracking of Project by Earned Value Management , 2014 .

[2]  Sagar K. Bhosekar,et al.  Cost Controlling Using Earned Value Analysis in Construction Industries , 2012 .

[3]  P. Esakki Thangam,et al.  Planning, Scheduling and Time Management of Six Lanes Road Construction Work at V.O.C Port Trust using Primavera P6 Software , 2016 .

[4]  Mohammed ZakiHaider PLANNING SCHEDULING, TRACKING AND APPLICATION ADMINISTRATION USING PRIMAVERA WEB LOGIC P6 , 2016 .

[5]  J. Jayalakshmi,et al.  Planning and Scheduling of High Rise Building Using Primavera , 2014 .

[6]  Andrew Fernans Tom,et al.  Project Monitoring and Control using Primavera , 2013 .

[7]  ANALYSIS ON COST, SCHEDULE AND TRACKING OF RESIDENTIAL PROJECT BY EARN VALUE MANAGEMENT METHOD USING PRIMAVERA P6 , 2017 .

[8]  Sushant Pradhan PLANNING, SCHEDULING AND RESOURCE OPTIMISATION OF MULTIPLE PROJECTS USING ORACLE PRIMAVERA P6 , 2016 .

[9]  Ankur Verma,et al.  Earned Value Analysis of ConstructionProject at Rashtriya Sanskrit Sansthan,Bhopal , 2014 .

[10]  Deepti Sahu,et al.  Resource Planning of a Colony Project Using Primavera , 2017 .

[11]  Nagendra Prasad INTERNATIONAL JOURNAL OF CIVIL ENGINEERING AND TECHNOLOGY (IJCIET ) , 2013 .

[12]  M. Deshpande,et al.  International Research Journal of Engineering and Technology (IRJET) , 2016 .

[13]  B. Prakash Rao,et al.  EARNED VALUE ANALYSIS ON AN ONGOING RESIDENTIAL BUILDING PROJECT IN BANGALORE, INDIA , 2015 .

[14]  J RajeevaS,et al.  PLANNING, SCHEDULING, TRACKING OF RESIDENTIAL BUILDING USING PRIMAVERA SOFTWARE P6 , 2017 .